Laserfiche WebLink
SECTION 01541 <br /> PROTECTION OF THE WORK AND PROPERTY <br /> 1 . 1 GENERAL <br /> A. CONTRACTOR shall be responsible for taking all precautions , providing all <br /> programs , and taking all actions necessary to protect the Work and all public <br /> and private property and facilities from damage as specified in the General <br /> Conditions and herein . <br /> Be In order to prevent damage , injury or loss , CONTRACTOR' S actions shall <br /> include , but not be limited to , the following : <br /> 1 : Store apparatus , materials , supplies , and equipment in an orderly , safe <br /> manner that will not unduly interfere with the progress of the Work or the <br /> Work of any other Contractor or utility service company . <br /> 2 . Provide suitable storage facilities for all materials , which are subject to injury <br /> by exposure to weather, theft , breakage , or otherwise . <br /> 3 . Place upon the Work or any part thereof, only such loads as are consistent <br /> with the safety of that portion of the Work . <br /> 4 . Clean up frequently all refuse , rubbish , scrap materials , and debris caused <br /> by construction operations , so that at all times , the site of the Work presents <br /> a safe , orderly, and workmanlike appearance . <br /> 5 . Provide barricades and guard rails around openings , for scaffolding , for <br /> temporary stairs and ramps , around excavations , elevated walkways and <br /> other hazardous areas . <br /> C . Except after written consent from proper parties , do not enter or occupy <br /> privately-owned land with men , tools , materials or equipment , except on <br /> easements provided herein . <br /> D . Assume full responsibility for the preservation of all public and private property or <br /> facility on or adjacent to the site . If any direct or indirect damage is done by or <br /> on account of any act , omission , neglect or misconduct in the execution of the <br /> Work by the CONTRACTOR , it shall be restored by the CONTRACTOR , at its <br /> expense , to a condition equal to or better than that existing before the damage <br /> was done . <br /> 1 . 2 BARRICADES AND WARNING SIGNALS <br /> Where Work is performed on or adjacent to any roadway , right-of-way , or public. <br /> place , provide barricades , fences , lights , warning signs , danger signals , and <br /> watchmen , and take other precautionary measures for the protection of persons or <br /> property and of the Work. Paint barricades so they are visible at night . From sunset <br /> to sunrise , furnish and maintain at least one light at each barricade . Erect sufficient <br /> barricades to keep vehicles from being driven on or into Work under construction . <br /> Furnish watchmen in sufficient numbers to protect the Work . CONTRACTOR's <br /> responsibility for the maintenance of barricades , signs , lights , and for providing <br /> watchmen shall continue until OWNER accepts the Project . <br /> 01541 - 1 FAEngineering\Capital Projects\0206 5th ST <br /> SW & 43rd AVE Bridge Replacement & Roadway Improvements\CONTRACT BIP\01541 - Protection of <br /> Property. doc <br />