| SECTION     01541
<br /> 																						PROTECTION    OF    THE    WORK   AND    PROPERTY
<br />    								1   .  1     	GENERAL
<br /> 										A.       	CONTRACTOR    shall    be    responsible   for   taking    all    precautions ,     providing    all
<br />    													programs ,    and    taking    all    actions    necessary   to    protect   the   Work    and    all     public
<br />    													and     private    property    and    facilities    from    damage    as    specified     in    the    General
<br />    													Conditions    and     herein .
<br />  										Be		In    order   to    prevent   damage ,     injury   or   loss ,    CONTRACTOR' S     actions    shall
<br />    													include ,     but    not    be    limited    to ,    the   following :
<br />    													1   :		Store    apparatus ,     materials ,     supplies ,    and    equipment    in     an    orderly ,    safe
<br />       																manner   that   will    not    unduly    interfere   with    the    progress    of   the   Work   or  the
<br />      																Work    of   any    other   Contractor   or   utility   service    company .
<br />   													2 . 		Provide    suitable    storage   facilities   for   all     materials ,    which     are    subject   to    injury
<br />      																by   exposure    to    weather,    theft ,    breakage ,    or   otherwise .
<br />    													3 . 		Place    upon    the    Work   or   any    part   thereof,    only   such    loads    as    are    consistent
<br />      																with    the    safety    of   that    portion    of   the   Work .
<br />   													4 . 		Clean     up    frequently    all     refuse ,     rubbish ,    scrap    materials ,     and    debris    caused
<br />      																by   construction    operations ,     so   that   at    all    times ,    the    site    of   the    Work    presents
<br />      																a    safe ,    orderly,     and    workmanlike    appearance .
<br />    													5 . 		Provide    barricades    and    guard    rails    around     openings ,     for   scaffolding ,    for
<br />      																temporary   stairs    and     ramps ,    around     excavations ,    elevated    walkways    and
<br />      																other    hazardous    areas .
<br /> 										C .       	Except    after   written     consent   from    proper    parties ,    do    not    enter   or    occupy
<br />    													privately-owned     land    with     men ,    tools ,     materials    or   equipment ,    except   on
<br />    													easements     provided    herein .
<br />  										D .      	Assume    full     responsibility   for   the    preservation    of   all    public    and     private    property    or
<br />   													facility    on    or   adjacent   to    the    site . 	If   any   direct   or   indirect   damage    is    done    by   or
<br />    													on    account    of    any   act ,    omission ,     neglect   or   misconduct    in    the    execution    of   the
<br />   													Work    by   the    CONTRACTOR ,     it   shall    be    restored    by   the    CONTRACTOR ,    at    its
<br />    													expense ,    to    a    condition    equal    to    or   better   than    that   existing     before    the    damage
<br />   													was    done .
<br />    								1   . 2    	BARRICADES    AND    WARNING    SIGNALS
<br /> 										Where    Work    is    performed     on    or   adjacent   to    any    roadway ,     right-of-way ,    or    public.
<br />  										place ,     provide    barricades ,    fences ,     lights ,    warning    signs ,    danger   signals ,    and
<br /> 										watchmen ,     and    take    other    precautionary    measures    for   the    protection    of   persons    or
<br />  										property   and    of   the    Work. 	Paint    barricades    so    they    are   visible    at    night . 	From    sunset
<br /> 										to    sunrise ,    furnish     and     maintain    at    least   one    light   at    each     barricade . 	Erect   sufficient
<br />  										barricades   to     keep    vehicles    from    being    driven    on    or    into   Work    under    construction .
<br />  										Furnish    watchmen     in    sufficient    numbers   to     protect   the    Work .	CONTRACTOR's
<br />  										responsibility   for   the    maintenance    of    barricades ,    signs ,     lights ,     and    for    providing
<br /> 										watchmen    shall    continue    until    OWNER    accepts   the     Project .
<br />     																																					01541  - 1					FAEngineering\Capital   Projects\0206  5th  ST
<br />    								SW     &    43rd    AVE    Bridge     Replacement    &    Roadway    Improvements\CONTRACT    BIP\01541     -    Protection    of
<br />    								Property. doc
<br /> |