My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-356B
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-356B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2016 11:50:50 AM
Creation date
10/1/2015 1:03:46 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/04/2008
Control Number
2008-356
Agenda Item Number
8.X.
Entity Name
Sheltra & Son Construction
Subject
5th St. SWand 43rd.Ave. Bridge Replacement
Area
5th St. and 43rd Ave.
Project Number
0206
Bid Number
2008075
Supplemental fields
SmeadsoftID
8046
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
View images
View plain text
SECTION 01541 <br /> PROTECTION OF THE WORK AND PROPERTY <br /> 1 . 3 TREE AND PLANT PROTECTION <br /> A. Protect existing trees , shrubs and plants on or adjacent to the site that are <br /> shown or designated to remain in place against unnecessary cutting , breaking or <br /> skinning of trunk, branches , bark or roots . <br /> B . Do not store or park materials or equipment within the drip line . <br /> C . Install temporary fences or barricades to protect trees and plants in areas <br /> subject to traffic. <br /> D . Fires shall not be permitted under or adjacent to trees and plants . <br /> E . Within the limits of the Work , water trees and plants that are to remain , in order <br /> to maintain their health during construction operations . <br /> F . Cover all exposed roots with burlap and keep it continuously wet . Cover all <br /> exposed roots with earth as soon as possible . Protect root systems from <br /> mechanical damage and damage by erosion , flooding , run-off or noxious <br /> materials in solution . <br /> G . If branches or trunks are damaged , prune branches immediately and protect the <br /> cut or damaged areas with emulsified asphalt compounded specifically for <br /> horticultural use . <br /> H . Remove all damaged trees and plants that die or suffer permanent injury and <br /> replace them with a specimen of equal or better quality. <br /> I . Coordinate Work in this Section with requirements of other sections herein . <br /> 1_4 PROTECTION OF IRRIGATION <br /> The CONTRACTOR shall be responsible . for maintaining in good condition all <br /> irrigation systems within the easements , which could be damaged by <br /> construction activities . The CONTRACTOR shall repair any irrigation systems <br /> damaged by construction activities within two (2 ) days . Irrigation systems <br /> partially within the right-of-way of Kings Highway and all intersecting side streets <br /> within project limits may be cut off and capped or connected to same system to <br /> maintain functionality. The CONTRACTOR shall be responsible for maintaining <br /> the functionality of the remaining portion of the system if it should fall outside of <br /> the right-of-way. <br /> 01541 -2 F:\Engineering\Capital Projects\0206 5th ST <br /> SW & 43rd AVE Bridge Replacement & Roadway Improvements\CONTRACT BI13\01541 - Protection of <br /> Property. doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).