Laserfiche WebLink
CONTRACTOR shall be held as the CONTRACTOR's acceptance that all survey or <br />existing site information is correct and accurate, without any reasonably inferable <br />errors, inaccuracies or omissions. <br />B. The CONTRACTOR shall carefully preserve all control stakes, benchmarks, reference <br />points and property corners and will be responsible for any mistake or loss of time <br />caused by their unnecessary loss or disturbance. If the loss or disturbance of the <br />stakes or marks cause a delay in the Work, the CONTRACTOR shall have no claim for <br />damages or extension of time. Control stakes, benchmarks, reference points and a <br />Florida Registered Land Surveyor and Mapper shall replace property corners disturbed <br />by the CONTRACTOR's work, at the CONTRACTOR'S expense. If the OWNER must <br />provide the services of the Florida Registered Surveyor and Mapper to perform this <br />replacement work, the cost of the surveying services will be deducted from any sums <br />due the CONTRACTOR for the work performed under this Contract. <br />C. All construction survey work shall be performed under the guidance and direction of a <br />Florida Registered Surveyor and Mapper. <br />D. All survey work for Record Drawings shall be performed under the guidance and <br />direction of a Florida Registered Survey -or and Mapper. <br />E. The following staking shall be provided on a one-time basis by the Owner: <br />1. Staking for Clearing. <br />2. Vertical and horizontal control staking. (Provided after clearing operations are <br />complete.) <br />[NOTE TO PREPARER: Add the specific control staking the owner is providing, i.e. <br />centerline, right-of-way, blue tops, or just basic reference for the CONTRACTOR to work <br />from.] <br />F. Maintain a complete, accurate log of all control and survey work as it progresses. <br />1.4 SUBMITTALS <br />A. Before beginning work, submit name and qualifications of Field <br />Engineer/Superintendent to ENGINEER. <br />B. Before beginning work, submit name and address of Professional Surveyor and <br />Mapper to ENGINEER. <br />C. On request of ENGINEER, submit documentation to verify accuracy of field <br />engineering work. <br />D. Complete and submit Section 00634 — "Professional Surveyor and Mapper's Certification as <br />to Elevations and Locations of the Work," with the Final Application for Payment. <br />01050 - Surveying and Field Engineering <br />01050-2 <br />F:\Engineering\Capital Projects\0206 5th ST SW & 43rd AVE Bridge Replacement & Roadway Improvements\CONTRACT BID\01050 - Surveying and Field Engineering.doc <br />Rev. 07/01 <br />