My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-356C
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-356C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2018 3:27:45 PM
Creation date
10/1/2015 1:04:03 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/04/2008
Control Number
2008-356C
Agenda Item Number
8.X.
Entity Name
Sheltra & Son Construction
Subject
5th St.SW Bridge Replacement
Area
5th St. SW and 43rd. Ave.
Project Number
0206
Bid Number
2008075
Supplemental fields
SmeadsoftID
8047
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Removal: The Contractor will be responsible for removal of all filtration <br />devices. <br />4. Product: All materials shall be new and unused. <br />a. "SILTSACK' (regular flow), supplied by ACF Environmental, Inc. (1- <br />800-448-3636). <br />b. "FloGuard+PLUS," supplied by Kristar Enterprises, Inc. <br />(1-800-579-8819). <br />c. Or equivalent. <br />E. Construction Site Egress Driveways: Minimize the transport of sediment and <br />soil from the construction site or work area by vehicle wheels. Construct a <br />crushed rock driving surface at the vehicle exit point(s). Provide an area large <br />enough to remove the sediment and soil from vehicle wheels before the vehicle <br />leaves the construction site or work area. Provide wash -down stations as <br />required to wash vehicle tires and retain all washwater on-site. <br />F. Rock and Stone for Erosion Control and Pollution Control and Treatment: <br />1. Crushed L"Lmerock: Crushed limerock. shall not be used under any <br />circumstance. <br />2. Acceptable Material: FDOT #4 non -calcareous aggregate (usually <br />granite), washed and meeting the requirements of FDOT Standard <br />Specifications for Road and Bridge Construction, Section 901. <br />G. Hay Bales: Hay bales shall not be used. <br />PART 3 - EXECUTION <br />A. Design, construct, and maintain the pollution control and treatment system to <br />minimize erosion and capture and remove pollutants from the construction site <br />and from all other areas disturbed by construction activities. <br />Item of Payment <br />Payment for the work specified in this item shall be made under: <br />Bid Item No. 104-1 - Erosion and Water Pollution Control - Lump Sum <br />(The rest of this page intentionally left blank) <br />01025-10 Technical Specifications <br />F:\Engineering\Capital Projects\0206 5th ST SW & 43rd AVE Bridge Replacement & Roadway Improvements\CONTRACT BID\Technical <br />Specifications.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.