Laserfiche WebLink
3. Removal: The Contractor will be responsible for removal of all filtration <br />devices. <br />4. Product: All materials shall be new and unused. <br />a. "SILTSACK' (regular flow), supplied by ACF Environmental, Inc. (1- <br />800-448-3636). <br />b. "FloGuard+PLUS," supplied by Kristar Enterprises, Inc. <br />(1-800-579-8819). <br />c. Or equivalent. <br />E. Construction Site Egress Driveways: Minimize the transport of sediment and <br />soil from the construction site or work area by vehicle wheels. Construct a <br />crushed rock driving surface at the vehicle exit point(s). Provide an area large <br />enough to remove the sediment and soil from vehicle wheels before the vehicle <br />leaves the construction site or work area. Provide wash -down stations as <br />required to wash vehicle tires and retain all washwater on-site. <br />F. Rock and Stone for Erosion Control and Pollution Control and Treatment: <br />1. Crushed L"Lmerock: Crushed limerock. shall not be used under any <br />circumstance. <br />2. Acceptable Material: FDOT #4 non -calcareous aggregate (usually <br />granite), washed and meeting the requirements of FDOT Standard <br />Specifications for Road and Bridge Construction, Section 901. <br />G. Hay Bales: Hay bales shall not be used. <br />PART 3 - EXECUTION <br />A. Design, construct, and maintain the pollution control and treatment system to <br />minimize erosion and capture and remove pollutants from the construction site <br />and from all other areas disturbed by construction activities. <br />Item of Payment <br />Payment for the work specified in this item shall be made under: <br />Bid Item No. 104-1 - Erosion and Water Pollution Control - Lump Sum <br />(The rest of this page intentionally left blank) <br />01025-10 Technical Specifications <br />F:\Engineering\Capital Projects\0206 5th ST SW & 43rd AVE Bridge Replacement & Roadway Improvements\CONTRACT BID\Technical <br />Specifications.doc <br />