My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-356C
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-356C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2018 3:27:45 PM
Creation date
10/1/2015 1:04:03 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/04/2008
Control Number
2008-356C
Agenda Item Number
8.X.
Entity Name
Sheltra & Son Construction
Subject
5th St.SW Bridge Replacement
Area
5th St. SW and 43rd. Ave.
Project Number
0206
Bid Number
2008075
Supplemental fields
SmeadsoftID
8047
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P <br />SPECIAL CONDITIONS FOR PERMIT NO. -07,,-54 <br />FOR <br />PROPOSED 43an AVENUE AND 5rH`STREET, SW <br />ROADWAY IMPROVEMENT32 t <br />' �h �L--L t ><i• '* ;ati .,i ttu�y t+1s. nt rii`�. '€.t,'Yi .! <br />- ,"s ..' e�•`,?..yg' C "'K ttsi�;t CR�fx;<r_ -_.^ t��ax t'z4 <br />1 This permit issued ;based .0p 1 <br />P,ans ,. <br />P E , dated , P .J.. �n. <br />W_ y_ <br />h % R <br />2) + Tillstf t <br />�tTY <br />=PeTn11`t°V�D ' <br />A t�• <br />3) In all canes, final grading around ' rrn �, <br />adjacent to proposed roadway irnprovems, shall s1`cpee'aar4toca s i <br />bank, and sufficient drainage provided to prevent surface Po. g <br />. .'and overbank 'cam' <br />discharge of stormwater (with resulting erosion) into. canal. <br />4) The last segment of all.outfall/discharge structures .into District's canal shall be <br />hrough bank to near toe of slope of canal. No <br />corrugated metal pipe extending t <br />headwalls are required. All disturbed bank to be re -graded, compacted and <br />stabilized with sod Lsimilar to adjacent typical undisturbed' canal section. <br />5) Proposed - 100 LF of guardrail at northwest corner of bridge shall be eliminated; <br />or located at top of canal bank to permit access of canal maintenance equipment <br />to north face of bridge and canal along maintenance berm adjacent to west top <br />of bank of canal. <br />6) Maintenance of the 43`a, Avenue Relief Canal and Sub -lateral B=6 -E (Sth Street, <br />SW) Canal is performed from the adjacent .roadway side :of both canals.. <br />Minimum signage of -other above ground- structures shall be placed' within the <br />canal berm maintenance area. Any at grade or below ground structures placed <br />within the required canal maintenance berm area shall be designed and <br />constructed to withstand heavy equipment traffic loadings. <br />7) The permit does not include approval of proposed 10" water main attachment to <br />bridge across the 43 Avenue Relief Canal at 5h Street, SW. A separate utility <br />construction permit is required for utility crossings of District's canal/faoilities. <br />J:WEC\SPEC COND-PROVISOMspecial-cor 407-54.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.