My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-356C
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-356C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2018 3:27:45 PM
Creation date
10/1/2015 1:04:03 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/04/2008
Control Number
2008-356C
Agenda Item Number
8.X.
Entity Name
Sheltra & Son Construction
Subject
5th St.SW Bridge Replacement
Area
5th St. SW and 43rd. Ave.
Project Number
0206
Bid Number
2008075
Supplemental fields
SmeadsoftID
8047
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bid Item No. 101-1 - Mobilization - Lump Sum <br />ITEM NO. 102 =MAINTENANCE OF TRAFFIC <br />The work specified in this, item shall conform to Section 102 of the Florida Department of <br />Transportation Standard Specifications for Road and Bridge Construction (2006 Edition), <br />except as modified herein. <br />A. GENERAL PROVISIONS -DESCRIPTION: The work specified in this Section consists <br />of maintaining traffic within the limits of the project for the duration of the construction <br />period, including any temporary suspensions of the work. It shall include the <br />construction and maintenance of any necessary detour facilities; the providing of <br />necessary facilities for access to residences, businesses, etc., along the project, the <br />furnishing, installing and maintaining of traffic control and safety devices during <br />construction, the control of dust through the use of calcium chloride if necessary, and <br />any other special requirements for safe and expeditious movement of traffic as may be <br />called for on the plans. The term, Maintenance of Traffic, as used herein, shall include <br />all of such facilities, devices and operations as are required for the safety and <br />convenience of the public as well as for minimizing public nuisance; all as specified in <br />this Itemized Section 14 of these provisions and Paragraph 24 in General Conditions <br />Section, <br />B. BEGINNING DATE OF CONTRACTOR'S RESPONSIBILITY: The Contractor shall <br />present his Maintenance of Traffic Plan at the pre -construction conference. The <br />Maintenance of Traffic Plan shall indicate the type and location of all signs, lights, <br />barricades, striping and barriers to be used for the safe passage of pedestrians and <br />vehicular traffic through the project and for the protection of the workmen. The plan <br />will indicate conditions and setups for each phase of the Contractor's activities. <br />When the project plans include or specify a specific Maintenance of Traffic Plan, <br />alternate proposals will be considered when they are found to be equal to or better <br />than the plan specified. <br />In no case may the Contractor begin work until the Maintenance of Traffic Plan has <br />been approved in writing by the Engineer. Modifications to the Maintenance of Traffic <br />Plan that become necessary shall also be approved in writing. Except in an <br />emergency, no changes to the approved plan will be allowed until approval to change <br />such plan has been received. <br />The cost of all work included in the Maintenance of Traffic Plan shall be included in the <br />pay item for Maintenance of Traffic. <br />The Contractor shall be responsible for performing daily inspections, including <br />weekends and holidays, with some inspections at nighttime, of the installations on the <br />project and replace all equipment and devices not conforming with the approved <br />standards during that inspection. The project personnel will be advised of the <br />01025-2 Technical Specifications <br />FAEngineering\Capital Projects\0206 5th ST SW & 43rd AVE Bridge Replacement & Roadway Improvements\CONTRACT BID\Technical <br />Specifications.doc <br />it <br />
The URL can be used to link to this page
Your browser does not support the video tag.