Laserfiche WebLink
Bid Item No. 101-1 - Mobilization - Lump Sum <br />ITEM NO. 102 =MAINTENANCE OF TRAFFIC <br />The work specified in this, item shall conform to Section 102 of the Florida Department of <br />Transportation Standard Specifications for Road and Bridge Construction (2006 Edition), <br />except as modified herein. <br />A. GENERAL PROVISIONS -DESCRIPTION: The work specified in this Section consists <br />of maintaining traffic within the limits of the project for the duration of the construction <br />period, including any temporary suspensions of the work. It shall include the <br />construction and maintenance of any necessary detour facilities; the providing of <br />necessary facilities for access to residences, businesses, etc., along the project, the <br />furnishing, installing and maintaining of traffic control and safety devices during <br />construction, the control of dust through the use of calcium chloride if necessary, and <br />any other special requirements for safe and expeditious movement of traffic as may be <br />called for on the plans. The term, Maintenance of Traffic, as used herein, shall include <br />all of such facilities, devices and operations as are required for the safety and <br />convenience of the public as well as for minimizing public nuisance; all as specified in <br />this Itemized Section 14 of these provisions and Paragraph 24 in General Conditions <br />Section, <br />B. BEGINNING DATE OF CONTRACTOR'S RESPONSIBILITY: The Contractor shall <br />present his Maintenance of Traffic Plan at the pre -construction conference. The <br />Maintenance of Traffic Plan shall indicate the type and location of all signs, lights, <br />barricades, striping and barriers to be used for the safe passage of pedestrians and <br />vehicular traffic through the project and for the protection of the workmen. The plan <br />will indicate conditions and setups for each phase of the Contractor's activities. <br />When the project plans include or specify a specific Maintenance of Traffic Plan, <br />alternate proposals will be considered when they are found to be equal to or better <br />than the plan specified. <br />In no case may the Contractor begin work until the Maintenance of Traffic Plan has <br />been approved in writing by the Engineer. Modifications to the Maintenance of Traffic <br />Plan that become necessary shall also be approved in writing. Except in an <br />emergency, no changes to the approved plan will be allowed until approval to change <br />such plan has been received. <br />The cost of all work included in the Maintenance of Traffic Plan shall be included in the <br />pay item for Maintenance of Traffic. <br />The Contractor shall be responsible for performing daily inspections, including <br />weekends and holidays, with some inspections at nighttime, of the installations on the <br />project and replace all equipment and devices not conforming with the approved <br />standards during that inspection. The project personnel will be advised of the <br />01025-2 Technical Specifications <br />FAEngineering\Capital Projects\0206 5th ST SW & 43rd AVE Bridge Replacement & Roadway Improvements\CONTRACT BID\Technical <br />Specifications.doc <br />it <br />