My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-356C
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-356C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2018 3:27:45 PM
Creation date
10/1/2015 1:04:03 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/04/2008
Control Number
2008-356C
Agenda Item Number
8.X.
Entity Name
Sheltra & Son Construction
Subject
5th St.SW Bridge Replacement
Area
5th St. SW and 43rd. Ave.
Project Number
0206
Bid Number
2008075
Supplemental fields
SmeadsoftID
8047
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
schedule of these inspections and be given the opportunity to join in the inspection as <br />is deemed necessary. <br />C. TRAFFIC CONTROL - STANDARDS: The FDOT Design Standards For Design, <br />Construction, Maintenance and Utility Operations On The State Highway System, <br />Edition as dated on the plans set forth the basic principles and prescribes minimum <br />standards to be followed in the design, application, installation, maintenance and <br />removal of all traffic control devices and all warning devices and barriers which are <br />necessary to protect the public and workmen from hazards within the project limits. <br />The standards established in the aforementioned manual constitute the minimum <br />requirements for normal conditions, and additional traffic control devices warning <br />devices, barriers or other safety devices will be required where unusual, complex or <br />particularly hazardous conditions exist. <br />The above referenced standards were developed using F.H.W.A., U.S.D.O.T. Manual <br />on Uniform Traffic Control Devices (MUTCD). <br />D. TRAFFIC CONTROL DEVICES, WARNING DEVICES AND BARRIERS - <br />INSTALLATION: The responsibility for installation and maintenance of adequate traffic <br />control devices, warning devices and barriers, for the protection of the travel in public <br />and workmen, as well as to safeguard the work area in general shall rest with the <br />Contractor. Consideration shall be given to recommendations of the Engineer. The <br />required traffic control devices, warning devices and barriers shall be erected by the <br />Contractor prior to creation of any hazardous condition and in conjunction with any <br />necessary re-routing of traffic. The Contractor shall immediately remove, turn or cover <br />any devices or barriers which do not apply to existing conditions. All traffic control <br />devices shall conform to MUTCD standards and shall be clean and relatively <br />undamaged. Damaged devices diminishing legibility and recognition, during either <br />night or day conditions, are not acceptable for use. <br />E. NO WAIVER OF LIABILITY: The Contractor shall conduct his operations in such a <br />manner that no undue hazard will result due to the requirements of this article, and the <br />procedures and policies described therein shall in no way act as a waiver of any of the <br />terms of the liability of the Contractor or his surety. <br />F. Non -Compliance: Should the Owner or Engineer determine that traffic within the <br />project is not being maintained in accordance with the approved traffic control plan or <br />presents a public safety concern, the contractor shall have until the end of the working <br />day, in which notification is given, to take action to modify the maintenance of traffic. <br />Should the contractor fail to make such modification the Owner shall have the option to <br />fine the.Contractor $400 per day until remedied. <br />G. Contractor's Maintenance of Traffic Plan shall maintain continues vehicular traffic on <br />Powerline Road at all times. The Contractor shall maintain one lane of traffic at all <br />times during Powerline Road cross drain culvert constructions. Owner shall have <br />option to fine the Contractor -$1,000.00 per day for Maintenance of Traffic Plan non- <br />compliance. <br />01025-3 Technical Specifications <br />F:\Engineering\Capital Projects\0206 5th ST SW & 43rd AVE Bridge Replacement & Roadway Improvements\CONTRACT BID\Technical <br />Specifications.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.