Laserfiche WebLink
SECTION 01630 <br /> SUBSTITUTIONS <br /> 1 . 1 GENERAL <br /> A . Requests for review of a substitution shall conform to the requirements of <br /> Article 6 . 05 , " Substitutes and Or- Equals , " of the General Conditions , and <br /> shall contain complete data substantiating compliance of the proposed <br /> substitution with the Contract Documents . <br /> 1 . 2 CONTRACTOR' S OPTIONS <br /> A . For materials or equipment ( hereinafter products ) specified only by <br /> reference standard , select product meeting that standard by any <br /> manufacturer , fabricator , supplier or. distributor ( hereinafter manufacturer ) . <br /> To the maximum extent possible , provide products of the same generic kind <br /> from a single source . <br /> B .. For products specified by . naming several products or manufacturers , select <br /> any one of the products or manufacturers named which complies with <br /> Specifications . <br /> C . For products specified by naming one or more products or manufacturers <br /> and stating " or equivalent , " submit a request for a substitution for any <br /> product or manufacturer which is not specifically named . <br /> D . For products specified by naming only one product or manufacturer and <br /> followed by words indicating that no substitution is permitted , there is no <br /> option and no substitution will be allowed . <br /> E . Where more than one choice is available as a CONTRACTOR' s option , <br /> select product which is compatible with other products already selected or <br /> specified . <br /> 1 . 3 SUBSTITUTIONS <br /> A . During a period of 15 days after date of commencement of Contract Time , <br /> ENGINEER will consider written requests from CONTRACTOR for substitu - <br /> tion of products or manufacturers , and construction methods ( if specified ) . <br /> 1 . After end of specified period , requests will be considered only in case of <br /> unavailability of product or other conditions beyond control of <br /> CONTRACTOR . <br /> B . Submit 5 copies of Request for Substitution . Submit a separate request for <br /> each substitution . In addition to requirements set forth in Article 6 . 05 of <br /> General Conditions , include in the request the following : <br /> 1 . For products or manufacturers : <br /> a . Product identification , including manufacturer' s name and address . <br /> 01630- 1 01630 Substitutions <br /> FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave . doc\01630 <br /> Substitutions . doc <br />