My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-417A
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-417A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2016 9:58:52 AM
Creation date
10/1/2015 1:11:44 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/16/2008
Control Number
2008-417A
Agenda Item Number
8.H.
Entity Name
Sheltra & Son Construction
Subject
Enclave Subdivision Contract, Specifications
Area
The Enclave Subdivision
Project Number
0816
Bid Number
2009019
Supplemental fields
SmeadsoftID
8214
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b . Manufacturer' s literature with product description , performance and <br /> test data , and reference standards . <br /> c . Samples , if appropriate . <br /> d . Name and address of similar projects on which product was used , <br /> and date of installation . <br /> 2 . For construction methods ( if specified ) : <br /> a . Detailed description of proposed method . <br /> b . Drawings illustrating method . <br /> 3 . Such other data as the ENGINEER may require to establish that the <br /> proposed substitution is equal to the product , manufacturer or method <br /> specified . <br /> C . In making Request for Substitution , CONTRACTOR represents that : <br /> 1 . CONTRACTOR has investigated proposed substitution , and determined <br /> that it is equal to or superior in all respects to the product , manufacturer <br /> or method specified . <br /> 2 . CONTRACTOR will provide the same or better guarantees or <br /> warranties for proposed substitution as for product , manufacturer , or <br /> method specified . <br /> 3 . CONTRACTOR waives all claims for additional costs or extension of <br /> time related to a proposed substitution that subsequently may become <br /> apparent . <br /> D . A proposed substitution will not be accepted if: <br /> 1 . Acceptance will require changes in the design concept or a substantial <br /> revision of the Contract Documents , <br /> 2 . It will delay completion of the Work , or the work of other contractors . <br /> 3 . It is indicated or implied on a Shop Drawing and is not accompanied by <br /> a formal Request for Substitution from CONTRACTOR . <br /> E . If the ENGINEER determines that a proposed substitute is not equal to that <br /> specified , furnish the product , manufacturer , or method specified at no <br /> additional cost to OWNER . . <br /> F . Approval of a substitution will not relieve CONTRACTOR from the <br /> requirement for submission of Shop Drawings as set forth in the Contract <br /> Documents . <br /> G . The procedure for review by Engineer will include the following : <br /> 1 . Requests for review of substitute items of material and equipment will <br /> not be accepted by Engineer from anyone other than CONTRACTOR . <br /> 2 . Upon receipt of an application for review of a substitution , Engineer will <br /> determine whether the review will be more extensive than a normal shop <br /> drawing review for the specified item . <br /> - 3 . If the substitution will not require a more extensive review , Engineer will <br /> proceed with the review without additional cost to CONTRACTOR . <br /> 01630-2 01630 Substitutions <br /> FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave . doc\01630 <br /> Substitutions . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.