My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-417A
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-417A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2016 9:58:52 AM
Creation date
10/1/2015 1:11:44 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/16/2008
Control Number
2008-417A
Agenda Item Number
8.H.
Entity Name
Sheltra & Son Construction
Subject
Enclave Subdivision Contract, Specifications
Area
The Enclave Subdivision
Project Number
0816
Bid Number
2009019
Supplemental fields
SmeadsoftID
8214
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 . If the substitution requires a more extensive review , Engineer will <br /> proceed with the review only after CONTRACTOR has agreed to <br /> reimburse Owner for the review cost . <br /> 5 . Engineer may require CONTRACTOR to furnish at CONTRACTOR ' s <br /> expense additional data about the proposed substitute . <br /> H . Any redesign of structural members shall be performed by , and the plans <br /> signed and sealed by , a Professional Engineer registered in the State of <br /> Florida . The redesign shall be at the CONTRACTOR ' s expense . Any <br /> redesign will require an extensive review by the Engineer . The <br /> CONTRACTOR must agree to reimburse the Owner for the review cost prior <br /> to the Owner' s Engineer proceeding with the design review . The <br /> ENGINEER' s hourly rate for review is $ 125 per hour . The ENGINEER ' s <br /> estimated cost of review shall be provided to the CONTRACTOR prior to <br /> proceeding with the review to allow the CONTRACTOR the opportunity to <br /> rescind the request . <br /> I . Engineer will be allowed a reasonable time within which to evaluate each <br /> proposed substitution . Engineer will be the sole judge of acceptability and <br /> shall have the right to deny use of any proposed substitution . The <br /> CONTRACTOR shall not order , install , or utilize any substitution without <br /> either an executed Change Order or Engineer' s notation on the reviewed <br /> shop drawing . Owner may require CONTRACTOR to furnish at <br /> CONTRACTOR ' s expense a special manufacturer' s performance <br /> guarantee ( s ) or other surety with respect to any substitute and an <br /> indemnification by the CONTRACTOR . ENGINEER will record time required <br /> by Engineer and Engineer' s consultants in evaluating substitutions proposed <br /> by CONTRACTOR and in making changes in the Contract Documents <br /> occasioned thereby . Whether or not a proposed substitute is sued , <br /> CONTRACTOR shall reimburse Owner for the charges of Engineer and <br /> Engineer' s consultants for evaluating each proposed substitute . <br /> J . Substitute materials or equipment may be proposed for acceptance in <br /> accordance with this Section . In the event that substitute materials or <br /> equipment are used and are less costly than the originally specified material <br /> or equipment , than the net difference in cost shall benefit the Owner and <br /> CONTRACTOR in equal proportions . This cost difference shall not be <br /> reduced by any failure of the CONTRACTOR to base his bid on the named <br /> materials or equipment . <br /> + + END OF SECTION + + <br /> 01630-3 01630 Substitutions <br /> FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave . doc\01630 <br /> Substitutions .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.