Laserfiche WebLink
4 . If the substitution requires a more extensive review , Engineer will <br /> proceed with the review only after CONTRACTOR has agreed to <br /> reimburse Owner for the review cost . <br /> 5 . Engineer may require CONTRACTOR to furnish at CONTRACTOR ' s <br /> expense additional data about the proposed substitute . <br /> H . Any redesign of structural members shall be performed by , and the plans <br /> signed and sealed by , a Professional Engineer registered in the State of <br /> Florida . The redesign shall be at the CONTRACTOR ' s expense . Any <br /> redesign will require an extensive review by the Engineer . The <br /> CONTRACTOR must agree to reimburse the Owner for the review cost prior <br /> to the Owner' s Engineer proceeding with the design review . The <br /> ENGINEER' s hourly rate for review is $ 125 per hour . The ENGINEER ' s <br /> estimated cost of review shall be provided to the CONTRACTOR prior to <br /> proceeding with the review to allow the CONTRACTOR the opportunity to <br /> rescind the request . <br /> I . Engineer will be allowed a reasonable time within which to evaluate each <br /> proposed substitution . Engineer will be the sole judge of acceptability and <br /> shall have the right to deny use of any proposed substitution . The <br /> CONTRACTOR shall not order , install , or utilize any substitution without <br /> either an executed Change Order or Engineer' s notation on the reviewed <br /> shop drawing . Owner may require CONTRACTOR to furnish at <br /> CONTRACTOR ' s expense a special manufacturer' s performance <br /> guarantee ( s ) or other surety with respect to any substitute and an <br /> indemnification by the CONTRACTOR . ENGINEER will record time required <br /> by Engineer and Engineer' s consultants in evaluating substitutions proposed <br /> by CONTRACTOR and in making changes in the Contract Documents <br /> occasioned thereby . Whether or not a proposed substitute is sued , <br /> CONTRACTOR shall reimburse Owner for the charges of Engineer and <br /> Engineer' s consultants for evaluating each proposed substitute . <br /> J . Substitute materials or equipment may be proposed for acceptance in <br /> accordance with this Section . In the event that substitute materials or <br /> equipment are used and are less costly than the originally specified material <br /> or equipment , than the net difference in cost shall benefit the Owner and <br /> CONTRACTOR in equal proportions . This cost difference shall not be <br /> reduced by any failure of the CONTRACTOR to base his bid on the named <br /> materials or equipment . <br /> + + END OF SECTION + + <br /> 01630-3 01630 Substitutions <br /> FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave . doc\01630 <br /> Substitutions .doc <br />