My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-169
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-169
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2016 11:06:40 AM
Creation date
9/30/2015 6:38:30 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/15/2003
Control Number
2003-169
Agenda Item Number
11.C.2
Entity Name
WPC Industrial Contractors
Subject
Clearwell Addition Post Treatment Modifications
FRP Piping Replacement Project Manual
Area
South RO WTP
Bid Number
5074
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3305
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
488
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' MAJOR EQUIPMENT J Q SCHEDULE <br /> The Bidder shall base the lump sum bid upon the NAMED Manufacturer/Supplier listed in the following <br /> ' major equipment schedule . Deducts for substitutes equipment will not be considered in the determination <br /> of the low Bidder. <br /> The Bidder agrees to accept as full payment for the lump sum work proposed under this project , as herein <br /> specified and shown on the Drawings , based upon the undersigned ' s own estimate of quantities and costs , <br /> the following lump sum of: Ste/ <br /> �it� 8 �✓ U� Z' kJollar <br /> 4 "Y <br /> andCents $ g <br /> Substitutes will not be considered after the Owner ' s receipt of the Bidder' s Proposal . hey actual ount t <br /> ' be paid to the Contractor shall be the amount of the lump sum bid as adjusted for reductions resulting from <br /> substitute equipment . <br /> ' The major equipment schedule below lists major equipment to be provided . The Bidder must indicate <br /> which Manufacturer/Supplier of equipment they intend to provide , by circling one of the NAMED <br /> Manufacturer/Suppliers listed and if the Bidder desires to propose a SUBSTITUTE , by writing in an "or <br /> ' equal " substitute and amount of deduct from the lump sum bid offered , if any , for accepted "or equal " <br /> substitute equipment . NAMED Manufacturer/Suppliers are defined as those listed in the Schedule . <br /> SUBSTITUTE Manufacturer/Suppliers are defined as those proposed and written in by the Bidder in the <br /> ' space designated as "Substitute" . When the Bidder writes in a SUBSTITUTE, they must also circle one of <br /> the NAMED Manufacturer/Suppliers listed . Should the Owner not accept the write -in SUBSTITUTE , <br /> then the Bidder must provide the circled item for the amount included in the Lump Sum Bid and at no <br /> ' increase in the Contract amount. Should a Bidder fail to indicate which manufacturer or supplier their Bid <br /> is based on , or circles more than one listed Manufacturer/Supplier per equipment item , the Bidder shall <br /> provide the "A" NAMED Manufacturer/Supplier for their Bid for the amount included in the Lump Sum <br /> ' Bid and at no increase in the Contract amount . <br /> Allowance of SUBSTITUTE equipment does not constitute a waiver of the Specifications . SUBSTITUTE <br /> equipment/suppliers will generally be deemed equal provided the "equal" product is equal or better than <br /> the product named and described in the Specifications and is equal or better in function , performance , <br /> reliability , quality and general configuration . Determination of equality in reference to the project design <br /> ' requirements will be made by the Owner and the Engineer in accordance to the General Conditions . No <br /> SUBSTITUTE equipment will be considered unless , in the opinion of the Owner and the Engineer, it <br /> conforms to the Contract Drawings and Specification , except for make and manufacturer. <br /> ' Design of this project is based upon the NAMED manufacturer ' s equipment or product noted as the "A " <br /> item below . Should a Bidder propose furnishing SUBSTITUTE equipment and it is accepted , they shall <br /> comply with the following : <br /> L The Bidder shall submit within 60 days after Notice to Proceed ALL DIMENSIONAL , <br /> ' MECHANICAL, ELECTRICAL AND STRUCTURAL CHANGES AND/OR <br /> REQUIREMENTS FOR THE UNIT ' S USE AND SHALL REIMBURSE THE <br /> ENGINEER THROUGH THE OWNER FOR ANY ASSOCIATED REDESIGN <br /> AND/OR MODIFICATIONS TO THE DRAWINGS OR SPECIFICATIONS . The <br /> Bidder ' s Proposal shall include in the deduct for substitute equipment all additional <br /> ' 044572000 <br /> 00310 (A1 ) - 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.