My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-169
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-169
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2016 11:06:40 AM
Creation date
9/30/2015 6:38:30 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/15/2003
Control Number
2003-169
Agenda Item Number
11.C.2
Entity Name
WPC Industrial Contractors
Subject
Clearwell Addition Post Treatment Modifications
FRP Piping Replacement Project Manual
Area
South RO WTP
Bid Number
5074
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3305
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
488
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' construction costs (mechanical , architectural , structural , electrical and engineering <br /> g g <br /> redesign costs) associated with that SUBSTITUTE equipment or material . The bid shall <br /> also include any paid -up licenses necessary for the use of the equipment if required by the <br /> ' manufacturer. <br /> 2 . Any redesign prepared by the Engineer. Reimbursement for engineering redesign shall be <br /> based on the Engineer' s raw salary costs times a multiplier of 3 . 10 plus any direct, non - <br /> labor expenses such as travel , per diem or reproduction services . The Owner will bill the <br /> ' Contractor monthly based on the Engineer ' s invoice to the Owner. The Contractor shall <br /> reimburse the Owner, who will in turn reimburse the Engineer, within 30 days of receipt <br /> of the Owner' s billing . Failure to pay the Owner, or authorize the Owner to pay the <br /> Engineer directly from funds due to the Contractor from the Owner, within 30 days , shall <br /> ' constitute grounds for the Owner' s withholding partial payments to the Contractor. <br /> 3 . The Bidder agrees that delays caused by redesign necessary for SUBSTITUTE equipment <br /> shall not constitute grounds for a contract modification , change order, claim or extension <br /> ' of contract time . <br /> ' SUBSTITUTE (WRITE-IN) EQUIPMENT SUBMITTAL REQUIREMENTS <br /> MAJOR EQUIPMENT SUBMITTAL REQUIREMENTS FOR ` SUBSTITUTE" (WRITE - IN) <br /> MANUFACTURER/SUPPLIERS INDICATED IN THE MAJOR EQUIPMENT SCHEDULE . THE <br /> FOLLOWING MUST BE SUBMITTED WITHIN 7 DAYS OF THE BID OPENING . FAILURE TO <br /> SUBMIT ALL THE APPLICABLE REQUESTED INFORMATION WITH THE PROPOSAL SHALL <br /> ' RESULT IN A DETERMINATION THAT THE WRITE-IN "SUBSTITUTE" IS "NOT EQUAL" . <br /> A . Dimensional and weight information on components and assemblies . <br /> '- B . Catalog information . <br /> ' C . Manufacturer' s specifications , including complete descriptions of the materials of <br /> construction and paint system . <br /> D . Horsepower, voltage , phase requirements of all motors supplied . <br /> E . Auxiliary utility requirements for each component , such as water, power, air etc . <br /> F . Functional description of any package instrumentation and control systems supplied . <br /> ' G. List of parameters monitored , controlled or alarmed . <br /> H . Addresses and phone numbers of nearest service center and a listing of the manufacturers <br /> ' or manufacturers ' representative ' s services available for this project. <br /> I . Addresses and phone numbers of the nearest parts warehouse capable of providing full <br /> parts replacement and repair service . <br /> J . A list of the three most recent installations where similar equipment e ui b the <br /> q p y manufacturer <br /> or manufacturers ' representative is currently in service ; include contact name , telephone <br /> ' 044572000 <br /> 00310 (A1 ) -6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.