Laserfiche WebLink
' OWNER such Bonds as CONTRACTOR may be required to sufficient detail to serve as the basis <br /> for progress <br /> furnish . payments during performance of the Work. Such prices <br /> will include an appropriate amount of overhead and <br /> ' 2 . 02 Copies of Documents profit applicable to each item of Work. <br /> A. OWNER shall furnish to CONTRACTOR up to ten C. Evidence of Insurance: Before any Work at the Site is <br /> copies of the Contract Documents . Additional copies will be started , CONTRACTOR and OWNER shall each deliver to the <br /> furnished upon request at the cost of reproduction . other, with copies to each additional insured identified in <br />the <br /> Supplementary Conditions , certificates of insurance (and other <br /> 2 . 03 Commencement of Contract Times; Notice to evidence of insurance which either of them or any additional <br /> Proceed insured may reasonably request) which CONTRACTOR and <br /> ' OWNER respectively are required to purchase and maintain in <br /> A. The Contract Times will commence to run on the accordance with Article 5. <br /> thirtieth day after the Effective Date of the Agreement or, if a <br /> Notice to Proceed is given, on the day indicated in the Notice to 2 . 06 Preconstruction Conference <br /> ' Proceed. A Notice to Proceed may be given at any time within <br /> 30 days after the Effective Date of the Agreement. In no event A. Within 20 days after the Contract Times start to <br /> run , <br /> will the Contract Times commence to run later than the sixtieth but before any Work at the Site is started <br />, a conference <br /> day after the day of Bid opening or the thirtieth day after the attended by CONTRACTOR, ENGINEER, and others as <br /> Effective Date of the Agreement, whichever date is earlier. appropriate will be held to establish a working understanding <br /> among the parties as to the Work and to discuss the schedules <br /> 2 . 04 Starting the Work referred to in paragraph 2 . 05. B , procedures for handling Shop <br /> Drawings and other submittals, processing Applications for <br /> A. CONTRACTOR shall start to perform the Work on the Payment, and maintaining required records. <br /> date when the Contract Times commence to run. No Work shall <br /> be done at the Site prior to the date on which the Contract 2. 07 Initial Acceptance of Schedules <br /> Times commence to run. <br /> A. Unless otherwise provided in the Contract Docu- <br /> ments ,Before Starting Construction ments , at least ten days before <br /> submission of the first <br /> Application for Payment a conference attended by LON- <br /> A. CONTRACTOR's Review of Contract Documents: TRACTOR, ENGINEER, and others as appropriate will be held <br /> Before undertaking each part of the Work, CONTRACTOR shall to review for acceptability to ENGINEER as provided below the <br /> carefully study and compare the Contract Documents and check schedules submitted in accordance with paragraph 2. 05. 13. <br /> and verify pertinent figures therein and all applicable field CONTRACTOR shall have an additional <br /> ten days to make <br /> measurements . CONTRACTOR shall promptly report in writing corrections and adjustments and to complete and resubmit the <br /> to ENGINEER any conflict, error, ambiguity, or discrepancy schedules . No progress payment shall be made <br /> to CON- <br /> which CONTRACTOR may discover and shall obtain a written TRACTOR until acceptable schedules are submitted <br /> to <br /> interpretation or clarification from ENGINEER before proceeding ENGINEER. <br /> with any Work affected thereby; however, CONTRACTOR shall <br /> ' not be liable to OWNER or ENGINEER for failure to report any 1 . The progress schedule will be acceptable <br /> to <br /> conflict, error, ambiguity, or discrepancy in the Contract ENGINEER if it provides an orderly progression of the <br /> Documents unless CONTRACTOR knew or reasonably should Work to completion within any specified Milestones and <br /> ' have known thereof. the Contract Times. Such acceptance will not impose <br /> B . Preliminary Schedules: Within ten days after the on ENGINEER responsibility for the progress schedule, <br /> for sequencing , scheduling , or progress of the Work nor <br /> Effective Date of the Agreement (unless otherwise specked in interfere with or relieve CONTRACTOR from <br /> the General Requirements), CONTRACTOR shall submit to CONTRACTOR's full responsibility therefore. <br /> ' ENGINEER for its timely review: <br /> 2. CONTRACTOR's schedule of Shop Drawing and <br /> 1 . a preliminary progress schedule indicating the Sample submittals will be acceptable to ENGINEER if it <br /> times (numbers of days or dates ) for starting and provides a workable arrangement for reviewing <br /> and <br /> ' completing the various stages of the Work, including any processing the required submittals . <br /> Milestones specified in the Contract Documents ; <br /> 3 . CONTRACTOR's schedule of values will be <br /> ' 2. a preliminary schedule of Shop Drawing and acceptable to ENGINEER as to form and substance if it <br /> Sample submittals which will list each required submittal provides a reasonable allocation of the Contract Price to <br /> and the times for submitting , reviewing , and processing component parts of the Work . <br /> such submittal; and <br /> 3. a preliminary schedule of values for all of the <br /> Work which includes quantities and prices of items <br /> which when added together equal the Contract Price <br /> ' and subdivides the Work into component parts in <br /> 044572000 <br /> 00700 - 8 <br />