Laserfiche WebLink
i <br /> ' code, or of any instruction of any Supplier, CONTRAC- <br /> TOR shall report it to ENGINEER in writing at once. <br /> ARTICLE 3 - CONTRACT DOCUMENTS : INTENT, CONTRACTOR shall not proceed with the Work <br /> AMENDING , REUSE affected thereby (except in an emergency as required by <br /> paragraph 6. 16.A) until an amendment or supplement to <br /> the Contract Documents has been issued by one of the <br /> 3 . 01 Intent methods indicated in paragraph 3 . 04 ; provided, <br /> however, that CONTRACTOR shall not be liable to <br /> A. The Contract Documents are complementary; what OWNER or ENGINEER for failure to report any such <br /> is called for by one is as binding as if called for by all . conflict, error, ambiguity, or discrepancy unless CON- <br /> TRACTOR knew or reasonably should have known <br /> ' B . It is the intent of the Contract Documents to describe a thereof. <br /> functionally complete Project (or part thereof) to be constructed <br /> in accordance with the Contract Documents . Any labor, B . Resolving Discrepancies <br /> documentation, services, materials , or equipment that may <br /> reasonably be inferred from the Contract Documents or from 1 . Except as may be otherwise specifically stated in <br /> prevailing custom or trade usage as being required to produce the Contract Documents, the provisions of the Contract <br /> the intended result will be provided whether or not specifically Documents shall take precedence in resolving <br /> any <br /> called for at no additional cost to OWNER. conflict, error, ambiguity, or discrepancy between the <br /> C. Clarifications and interpretations of the Contract provisions of the Contract Documents and: <br /> Documents shall be issued by ENGINEER as provided in Article a . the provisions of any standard , specification , <br /> 9. manual , code, or instruction (whether or not specifi- <br /> cally incorporated by reference in the Contract <br /> 3 . 02 Reference Standards Documents ); or <br /> A. Standards, Specifications, Codes, Laws, and b. the provisions of any Laws or Regulations <br /> Regulations applicable to the performance of the Work (unless <br /> such an interpretation of the provisions of the <br /> 1 . Reference to standards , specifications , manuals , Contract Documents would result in violation of such <br /> or codes of any technical society, organization, or Law or Regulation). <br /> ' association, or to Laws or Regulations , whether such <br /> reference be specific or by implication , shall mean the 3 . 04 Amending and Supplementing Contract Documents <br /> standard , specification , manual, code, or Laws or <br /> Regulations in effect at the time of opening of Bids (or A. The Contract Documents may be amended to provide <br /> ' on the Effective Date of the Agreement if there were no for additions , deletions , and revisions in the Work or <br />to modify <br /> Bids ), except as may be otherwise specifically stated in the terms and conditions thereof in one or more of the following <br /> the Contract Documents . ways : (i ) a Written Amendment; ( ii) a Change Order; or (iii ) a <br /> 2. No provision of any such standard , specification, Work Change Directive. <br /> manual or code, or any instruction of a Supplier shall be B . The requirements of the Contract Documents may be <br /> effective to change the duties or responsibilities of supplemented, and minor variations and deviations in the <br /> Work <br /> OWNER , CONTRACTOR, or ENGINEER, or any of may be authorized , by one or more of the following ways : (i ) <br /> a <br /> ' their subcontractors , consultants , agents , or employees Field Order; ( ii) ENGINEER's approval of a Shop Drawing <br /> or <br /> from those set forth in the Contract Documents , nor Sample; or (iii ) ENGINEER's written interpretation <br /> or clarifi- <br /> shall any such provision or instruction be effective to cation. <br /> assign to OWNER, ENGINEER, or any of ENGINEER's <br /> Consultants , agents , or employees any duty or authority 3 . 05 Reuse of Documents <br /> to supervise or direct the performance of the Work or <br /> any duty or authority to undertake responsibility A. CONTRACTOR and any Subcontractor or Supplier or <br /> inconsistent with the provisions of the Contract other individual or entity performing or furnishing any of the <br /> ' Documents . Work under a direct or indirect contract with OWNER: (i) shall <br /> not have or acquire any title to or ownership rights in any of the <br /> 3 . 03 Reporting and Resolving Discrepancies Drawings , Specifications , or other documents (or copies of any <br /> thereof) prepared by or bearing the seal of ENGINEER or <br /> ' A. Reporting Discrepancies ENGINEER's Consultant, including electronic media editions ; <br /> and ( ii ) shall not reuse any of such Drawings , Specifications , <br /> 1 . If, during the performance of the Work, other documents , or copies thereof on extensions of the Project <br /> CONTRACTOR discovers any conflict, error, ambiguity, or any other project without written consent of OWNER and <br /> ' or discrepancy within the Contract Documents or ENGINEER and specific written verification or adaption <br /> by <br /> between the Contract Documents and any provision of ENGINEER . This prohibition will survive final payment , <br /> any Law or Regulation applicable to the performance of completion , and acceptance of the Work, or termination <br /> or <br /> the Work or of any standard , specification , manual or completion of the Contract . Nothing herein <br />shall preclude <br /> ' 044572000 <br /> 00700 - 9 <br />