i <br /> property insurance pursuant to paragraph 5. 06 have facilities , temporary facilities , and all other facilities and <br /> acknowledged notice thereof and in writing effected any incidentals necessary for the performance, testing , startup, and <br /> changes in coverage necessitated thereby. The insurers completion of the Work . <br /> ' providing the property insurance shall consent by endorsement <br /> on the policy or policies , but the property insurance shall not be B . All materials and equipment incorporated into <br /> the <br /> canceled or permitted to lapse on account of any such partial Work shall be as specified or, if not specified , <br /> shall be of good <br /> use or occupancy. quality and new, except as otherwise provided in the Contract <br /> ' Documents . All warranties and guarantees specifically called <br /> for by the Specifications shall expressly run to the benefit of <br /> ARTICLE 6 - CONTRACTOR'S RESPONSIBILITIES OWNER. If required by ENGINEER, CONTRACTOR shall <br /> furnish satisfactory evidence ( including reports of required tests) <br /> ' as to the source, kind , and quality of materials and equipment. <br /> 6. 01 Supervision and Superintendence All materials and equipment shall be stored , applied , installed , <br /> connected , erected , protected , used , cleaned , and conditioned <br /> A. CONTRACTOR shall supervise , inspect, and direct in accordance with instructions of the applicable <br /> Supplier, <br /> ' the Work competently and efficiently, devoting such attention except as otherwise may be provided in the <br /> Contract Docu- <br /> thereto and applying such skills and expertise as may be ments . <br /> necessary to perform the Work in accordance with the Contract <br /> Documents . CONTRACTOR shall be solely responsible for the 6. 04 Progress Schedule <br /> means , methods , techniques , sequences , and procedures of <br /> construction, but CONTRACTOR shall not be responsible for A. CONTRACTOR shall adhere to the progress schedule <br /> the negligence of OWNER or ENGINEER in the design or established in accordance with paragraph 2 . 07 as <br /> it may be <br /> specification of a specific means , method, technique, sequence, adjusted from time to time as provided below. <br /> ' or procedure of construction which is shown or indicated in and <br /> expressly required by the Contract Documents. CON- 1 . CONTRACTOR shall submit to ENGINEER for <br /> TRACTOR shall be responsible to see that the completed Work acceptance (to the extent indicated in paragraph 2. 07) <br /> complies accurately with the Contract Documents . proposed adjustments in the progress schedule that will <br /> ' not result in changing the Contract Times (or <br /> B . At all times during the progress of the Work, Milestones ). Such adjustments will conform generally <br /> to <br /> CONTRACTOR shall assign a competent resident superin- the progress schedule then in effect and additionally will <br /> tendent thereto who shall not be replaced without written notice comply with any provisions of the General Re- <br /> to OWNER and ENGINEER except under extraordinary quirements applicable thereto. <br /> circumstances . The superintendent will be CONTRACTOR's <br /> representative at the Site and shall have authority to act on 2 . Proposed adjustments in the progress schedule <br /> behalf of CONTRACTOR. All communications given to or that will change the Contract Times (or Milestones ) shall <br /> ' received from the superintendent shall be binding on be submitted in accordance with the requirements of <br /> CONTRACTOR . Article 12. Such adjustments may only be made by a <br /> Change Order or Written Amendment in accordance <br /> 6 . 02 Labor; Working Hours with Article 12. <br /> ' A. CONTRACTOR shall provide competent, suitably 6. 05 Substitutes and "Or-Equals" <br /> qualified personnel to survey, lay out, and construct the Work as <br /> required by the Contract Documents . CONTRACTOR shall at A. Whenever an item of material or equipment is <br /> all times maintain good discipline and order at the Site. specified or described in the Contract Documents by using the <br /> name of a proprietary item or the name of a particular Supplier, <br /> B . Except as otherwise required for the safety or the specification or description is intended to establish <br /> the type, <br /> protection of persons or the Work or property at the Site or function, appearance, and quality required. Unless the <br /> ' adjacent thereto, and except as otherwise stated in the Contract specification or description contains or is followed <br /> by words <br /> Documents , all Work at the Site shall be performed during reading that no like, equivalent, or <br /> "or-equal" item or no <br /> regular working hours , and CONTRACTOR will not permit substitution is permitted , other items of material or <br />equipment or <br /> overtime work or the performance of Work on Saturday, material or equipment of other Suppliers may be <br /> submitted to <br /> ' Sunday, or any legal holiday without OWNER's written consent ENGINEER for review under the circumstances described <br /> (which will not be unreasonably withheld ) given after prior below. <br /> written notice to ENGINEER . <br /> 1 . "Or-Equal" Items: If in ENGINEER's sole discre- <br /> tion an item of material or equipment proposed by CON- <br /> 6 . 03 Services, Materials, and Equipment TRACTOR is functionally equal to that named and <br /> sufficiently similar so that no change in related Work will <br /> A. Unless otherwise specified in the General Re- be required , it may be considered by ENGINEER as an <br /> ' quirements , CONTRACTOR shall provide and assume full "or-equal" item , in which case review and approval <br /> of <br /> responsibility for all services , materials , equipment, labor, the proposed item may , in ENGINEER's sole discretion , <br /> transportation, construction equipment and machinery , tools , be accomplished without compliance with some or all of <br /> appliances , fuel , power, light, heat , telephone, water, sanitary the requirements for approval of proposed substitute <br /> ' 044572000 <br /> 00700 - 16 <br />