My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-169
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-169
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2016 11:06:40 AM
Creation date
9/30/2015 6:38:30 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/15/2003
Control Number
2003-169
Agenda Item Number
11.C.2
Entity Name
WPC Industrial Contractors
Subject
Clearwell Addition Post Treatment Modifications
FRP Piping Replacement Project Manual
Area
South RO WTP
Bid Number
5074
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3305
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
488
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
items . For the purposes of this paragraph 6.05.A. 1 , a identified in the application , and available <br /> proposed item of material or equipment will be engineering , sales , maintenance, repair, and <br /> considered functionally equal to an item so named if: replacement services will be indicated . The <br /> ' application will also contain an itemized estimate of <br /> a . in the exercise of reasonable judgment all costs or credits that will result directly or indirectly <br /> ENGINEER determines that: (i) it is at least equal in from use of such substitute item, including costs of <br /> quality , durability, appearance, strength , and design redesign and claims of other contractors affected by <br /> ' characteristics ; ( ii ) it will reliably perform at least any resulting change, all of which will be considered <br /> equally well the function imposed by the design by ENGINEER in evaluating the proposed substitute <br /> concept of the completed Project as a functioning item . ENGINEER may require CONTRACTOR to <br /> whole, and ; furnish additional data about the proposed substitute <br /> ' item . <br /> b. CONTRACTOR certifies that: (i ) there is no <br /> increase in cost to the OWNER; and (ii ) it will B. Substitute Construction Methods or Procedures: If a <br /> conform substantially, even with deviations , to the specific means , method , technique, sequence, or procedure of <br /> ' detailed requirements of the item named in the construction is shown or indicated in and expressly required <br /> by <br /> Contract Documents . the Contract Documents , CONTRACTOR may furnish or utilize <br /> a substitute means , method, technique, sequence, or procedure <br /> 2 . Substitute Items of construction approved by ENGINEER. CONTRACTOR shall <br /> submit sufficient information to allow ENGINEER, in <br /> a. If in ENGINEER's sole discretion an item of ENGINEER's sole discretion, to determine that the substitute <br /> material or equipment proposed by CONTRACTOR proposed is equivalent to that expressly called for by the <br /> does not qualify as an "or-equal" item under Contract Documents . The procedure for review by ENGINEER <br /> ' paragraph 6. 05.A. 11 it will be considered a proposed will be similar to that provided in subparagraph 6. 05.A.2. <br /> substitute item. <br /> C. Engineer's Evaluation: ENGINEER will be allowed a <br /> b. CONTRACTOR shall submit sufficient infor- reasonable time within which to evaluate each proposal or <br /> ' mation as provided below to allow ENGINEER to submittal made pursuant to paragraphs 6. 05.A and 6. 05. <br />6. <br /> determine that the item of material or equipment ENGINEER will be the sole judge of acceptability. No ` or-equal" <br /> proposed is essentially equivalent to that named or substitute will be ordered , installed or utilized until <br /> and an acceptable substitute therefore. Requests ENGINEER's review is complete, which will be evidenced by <br /> ' for review of proposed substitute items of material or either a Change Order for a substitute or an approved Shop <br /> equipment will not be accepted by ENGINEER from Drawing for an ` or equal . " ENGINEER will advise <br /> anyone other than CONTRACTOR. CONTRACTOR in writing of any negative determination . <br /> ' c. The procedure for review by ENGINEER D. Special Guarantee: OWNER may require CON- <br /> will be as set forth in paragraph 6.05.A. 2.d , as TRACTOR to furnish at CONTRACTOR's expense a <br /> special <br /> supplemented in the General Requirements and as performance guarantee or other surety with respect to any <br /> ENGINEER may decide is appropriate under the substitute. <br /> ' circumstances . <br /> E . ENGINEER's Cost Reimbursement: ENGINEER will <br /> d. CONTRACTOR shall first make written record time required by ENGINEER and ENGINEER's Consul- <br /> application to ENGINEER for review of a proposed tants in evaluating substitute proposed or submitted by <br /> ' substitute item of material or equipment that CONTRACTOR pursuant to paragraphs 6. 05.A. 2 and 6. 05. 6 <br /> CONTRACTOR seeks to furnish or use. The and in making changes in the Contract Documents (or in <br /> the <br /> application shall certify that the proposed substitute provisions of any other direct contract with OWNER for work on <br /> item will perform adequately the functions and the Project) occasioned thereby. Whether or not ENGINEER <br /> ' achieve the results called for by the general design, approves a substitute item so proposed or submitted by CON- <br /> be similar in substance to that specified , and be TRACTOR, CONTRACTOR shall reimburse OWNER for the <br /> suited to the same use as that specified . The appli- charges of ENGINEER and ENGINEER's Consultants <br /> for <br /> cation will state the extent, if any, to which the use evaluating each such proposed substitute. <br /> ' of the proposed substitute item will prejudice <br /> CONTRACTOR's achievement of Substantial F. CONTRACTOR 's Expense: CONTRACTOR shall <br /> Completion on time, whether or not use of the provide all data in support of any proposed <br /> substitute or <br /> proposed substitute item in the Work will require a "or-equal" at CONTRACTOR's expense. <br /> ' change in any of the Contract Documents (or in the <br /> provisions of any other direct contract with OWNER 6. 06 Concerning Subcontractors, Suppliers, and Others <br /> for work on the Project) to adapt the design to the <br /> proposed substitute item and whether or not A. CONTRACTOR shall not employ any Subcontractor, <br /> ' incorporation or use of the proposed substitute item Supplier, or other individual or entity ( including those acceptable <br /> in connection with the Work is subject to payment of to OWNER as indicated in paragraph 6. 06. 6 ), whether initially <br /> any license fee or royalty. All variations of the pro- or as a replacement, against whom OWNER may have reason- <br /> posed substitute item from that specified will be able objection . CONTRACTOR shall not be required to employ <br /> ' 044572000 <br /> 00700 - 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.