Laserfiche WebLink
' Work. Except where otherwise expressly required by applicable charges of engineers , architects , attorneys , and other <br /> Laws and Regulations , neither OWNER nor ENGINEER shall professionals and all court or arbitration or other dispute <br /> be responsible for monitoring CONTRACTOR's compliance with resolution costs ) arising out of or relating to any claim or <br /> ' any Laws or Regulations . action , legal or equitable, brought by any such owner or <br /> occupant against OWNER, ENGINEER , or any other <br /> B. If CONTRACTOR performs any Work knowing or party indemnified hereunder to the extent caused by or <br /> having reason to know that it is contrary to Laws or Regulations , based upon CONTRACTOR's performance of the Work . <br /> ' CONTRACTOR shall bear all claims, costs , losses , and <br /> damages ( including but not limited to all fees and charges of B . Removal of Debris During Performance of the Work: <br /> engineers, architects , attorneys , and other professionals and all During the progress of the Work CONTRACTOR shall keep the <br /> court or arbitration or other dispute resolution costs ) arising out Site and other areas free from accumulations <br /> of waste <br /> ' of or relating to such Work; however, it shall not be materials , rubbish , and other debris . Removal and disposal <br /> of <br /> CONTRACTOR's primary responsibility to make certain that the such waste materials , rubbish , and other debris shall conform to <br /> Specifications and Drawings are in accordance with Laws and applicable Laws and Regulations . <br /> Regulations , but this shall not relieve CONTRACTOR of <br /> ' CONTRACTOR's obligations under paragraph 3. 03. C . Cleaning: Prior to Substantial Completion of the Work <br /> CONTRACTOR shall clean the Site and make it ready for <br /> C. Changes in Laws or Regulations not known at the utilization by OWNER. At the completion of the Work <br />CON- <br /> time of opening of Bids (or, on the Effective Date of the TRACTOR shall remove from the <br />Site all tools , appliances , <br /> ' Agreement if there were no Bids) having an effect on the cost or construction equipment and machinery, and surplus <br />materials <br /> time of performance of the Work may be the subject of an and shall restore to original condition all property <br />not designated <br /> adjustment in Contract Price or Contract Times . If OWNER and for alteration by the Contract Documents . <br /> CONTRACTOR are unable to agree on entitlement to or on the <br /> amount or extent, if any, of any such adjustment, a Claim may D . Loading Structures: CONTRACTOR shall not load <br /> be made therefore as provided in paragraph 10.05. nor permit any part of any structure to be loaded in any manner <br /> that will endanger the structure, nor shall CONTRACTOR <br /> 6 . 10 Taxes subject any part of the Work or adjacent property to stresses or <br /> ' pressures that will endanger it. <br /> A. CONTRACTOR shall pay all sales , consumer, use, <br /> and other similar taxes required to be paid by CONTRACTOR in 6. 12 Record Documents <br /> accordance with the Laws and Regulations of the place of the <br /> ' Project which are applicable during the performance of the A. CONTRACTOR shall maintain in a safe place at the <br /> Work. Site one record copy of all Drawings , Specifications , Addenda , <br /> Written Amendments , Change Orders , Work Change Directives , <br /> 6. 11 Use of Site and Other Areas Field Orders , and written interpretations and clarifications in <br /> ' good order and annotated to show changes made during <br /> A. Limitation on Use of Site and Other Areas construction . These record documents together with all <br /> approved Samples and a counterpart of all approved Shop <br /> 1 . CONTRACTOR shall confine construction equip- Drawings will be available to ENGINEER for reference. Upon <br /> ' ment, the storage of materials and equipment, and the completion of the Work, these record documents , Samples , and <br /> operations of workers to the Site and other areas Shop Drawings will be delivered to ENGINEER for OWNER. <br /> permitted by Laws and Regulations , and shall not <br /> unreasonably encumber the Site and other areas with 6. 13 Safety and Protection <br /> construction equipment or other materials or equipment. <br /> CONTRACTOR shall assume full responsibility for any A. CONTRACTOR shall be solely responsible for <br /> damage to any such land or area , or to the owner or initiating , maintaining and supervising all safety precautions <br /> and <br /> occupant thereof, or of any adjacent land or areas programs in connection with the Work . CONTRACTOR shall <br /> ' resulting from the performance of the Work. take all necessary precautions for the safety of, and <br /> shall <br /> provide the necessary protection to prevent damage, injury or <br /> 2. Should any claim be made by any such owner or loss to: <br /> occupant because of the performance of the Work, <br /> ' CONTRACTOR shall promptly settle with such other 1 . all persons on the Site or who may be affected <br /> party by negotiation or otherwise resolve the claim by by the Work; <br /> arbitration or other dispute resolution proceeding or at <br /> law. 2 . all the Work and materials and equipment to be <br /> ' incorporated therein , whether in storage on or off the <br /> 3. To the fullest extent permitted by Laws and Site; and <br /> Regulations, CONTRACTOR shall indemnify and hold <br /> harmless OWNER, ENGINEER, ENGINEER's 3 . other property at the Site or adjacent thereto , <br /> ' Consultant, and the officers , directors , partners , including trees , shrubs , lawns , walks , pavements , <br /> employees , agents , and other consultants of each and roadways , structures , utilities , and Underground Facili- <br /> any of them from and against all claims , costs , losses , ties not designated for removal , relocation , or <br /> and damages ( including but not limited to all fees and replacement in the course of construction . <br /> ' 044572000 <br /> 00700 - 19 <br />