B . CONTRACTOR shall comply with all applicable Laws 6 . 17 Shop Drawings and Samples
<br /> and Regulations relating to the safety of persons or property, or
<br /> ' to the protection of persons or property from damage, injury, or A. CONTRACTOR shall submit Shop Drawings to
<br /> loss ; and shall erect and maintain all necessary safeguards for ENGINEER for review and approval in accordance
<br />with the
<br /> such safety and protection . CONTRACTOR shall notify owners acceptable schedule of Shop Drawings and Sample submittals.
<br /> of adjacent property and of Underground Facilities and other All submittals will be identified as ENGINEER may require
<br /> and
<br /> ' utility owners when prosecution of the Work may affect them, in the number of copies specified in the General Requirements
<br />.
<br /> and shall cooperate with them in the protection, removal , The data shown on the Shop Drawings will be
<br /> complete with
<br /> relocation , and replacement of their property. All damage, respect to quantities , dimensions , specked performance
<br /> and
<br /> injury, or loss to any property referred to in paragraph 6. 13.A. 2 design criteria , materials , and similar data to show
<br />ENGINEER
<br /> ' or 6. 13 .A. 3 caused , directly or indirectly, in whole or in part, by the services , materials , and equipment CONTRACTOR
<br /> CONTRACTOR, any Subcontractor, Supplier, or any other proposes to provide and to enable ENGINEER to review
<br /> the
<br /> individual or entity directly or indirectly employed by any of them information for the limited purposes required by
<br /> paragraph
<br /> to perform any of the Work, or anyone for whose acts any of 6. 17 . E .
<br /> ' them may be liable, shall be remedied by CONTRACTOR
<br /> (except damage or loss attributable to the fault of Drawings or B . CONTRACTOR shall also submit Samples to
<br /> Specifications or to the acts or omissions of OWNER or ENGINEER for review and approval in accordance
<br /> with the
<br /> ENGINEER or ENGINEER's Consultant, or anyone employed acceptable schedule of Shop Drawings and Sample submittals .
<br /> ' by any of them, or anyone for whose acts any of them may be Each Sample will be identified clearly as to material
<br />, Supplier,
<br /> liable, and not attributable, directly or indirectly, in whole or in pertinent data such as catalog numbers , and the
<br /> use for which
<br /> part, to the fault or negligence of CONTRACTOR or any intended and otherwise as ENGINEER may require
<br /> to enable
<br /> Subcontractor, Supplier, or other individual or entity directly or ENGINEER to review the submittal for the limited
<br /> purposes
<br /> ' indirectly employed by any of them ). CONTRACTOR's duties required by paragraph 6. 17 . E . The numbers of each Sample to
<br /> and responsibilities for safety and for protection of the Work be submitted will be as specified in the Specifications .
<br /> shall continue until such time as all the Work is completed and
<br /> ENGINEER has issued a notice to OWNER and C . Where a Shop Drawing or Sample is required by the
<br /> ' CONTRACTOR in accordance with paragraph 14. 07 . 13 that the Contract Documents or the schedule of Shop Drawings and
<br /> Work is acceptable (except as otherwise expressly provided in Sample submittals acceptable to ENGINEER as required by
<br /> connection with Substantial Completion). paragraph 2.07, any related Work performed prior to
<br /> ENGINEER's review and approval of the pertinent submittal will
<br /> ' 6. 14 Safety Representative be at the sole expense and responsibility of CONTRACTOR.
<br /> A. CONTRACTOR shall designate a qualified and D . Submittal Procedures
<br /> experienced safety representative at the Site whose duties and
<br /> responsibilities shall be the prevention of accidents and the 1 . 13efore submitting each Shop Drawing or
<br /> Sam-
<br /> maintaining and supervising of safety precautions and ple, CONTRACTOR shall have determined and verged :
<br /> programs.
<br /> a . all field measurements , quantities , dimen-
<br /> ' 6. 15 Hazard Communication Programs sions , specified performance criteria , installation
<br /> requirements , materials , catalog numbers , and
<br /> A. CONTRACTOR shall be responsible for coordinating similar information with respect thereto;
<br /> any exchange of material safety data sheets or other hazard
<br /> t communication information required to be made available to or b. all materials with respect to intended
<br /> use,
<br /> exchanged between or among employers at the Site in fabrication , shipping , handling , storage,
<br /> assembly,
<br /> accordance with Laws or Regulations . and installation pertaining to the performance of the
<br /> Work;
<br /> ' 6. 16 Emergencies
<br /> c. all information relative to means, methods ,
<br /> A. In emergencies affecting the safety or protection of techniques , sequences , and procedures of construc-
<br /> persons or the Work or property at the Site or adjacent thereto, tion and safety precautions and programs incident
<br /> ' CONTRACTOR is obligated to act to prevent threatened dam- thereto; and
<br /> age, injury, or loss . CONTRACTOR shall give ENGINEER
<br /> prompt written notice if CONTRACTOR believes that any d . CONTRACTOR shall also have reviewed
<br /> significant changes in the Work or variations from the Contract and coordinated each Shop Drawing or Sample with
<br /> ' Documents have been caused thereby or are required as a other Shop Drawings and Samples and
<br />with the
<br /> result thereof. If ENGINEER determines that a change in the requirements of the Work and the Contract Docu-
<br /> Contract Documents is required because of the action taken by ments .
<br /> CONTRACTOR in response to such an emergency , a Work
<br /> Change Directive or Change Order will be issued . 2. Each submittal shall bear a stamp or specific
<br /> written indication that CONTRACTOR has satisfied
<br /> CONTRACTOR's obligations under the Contract
<br /> ' 044572000
<br /> 00700 - 20