Laserfiche WebLink
Indian Riva X.Ounty <br />Purchashng Division - <br />1800 27 Street <br />Vero Beach, AFL 32960 <br />Photn:e (772) 567-8000 Fax (772) 770-5095 <br />Ext. 1986 <br />ADDENDUM NO, 2 <br />Date, June 18, 2008 <br />Project Name: 1St Road from 35th Avenue to 32"d Avenue & 10th Court SW from <br />Oslo Road (9th Street SW) to 7th Street SW <br />Bid Number: 2008062 <br />Bid Opening Date: Friday, July 11, 2008 at 2:00 p.m. <br />TO ALL PROSPECTIVE BIDDERS: <br />TO PROSPECTIVE BIDDERS AND OTHERS CONCERNED: This ADDENDUM is <br />intended to clarify, correct, or change the Bidding Requirements of the Contract Documents. Therefore, it <br />hereby supercedes anything to the contrary in the Bidding Requirements or contract Documents. This <br />ADDENDUM is hereby made a part of the subject Bidding and Contract Documents. <br />The subject addendum was generated from the questions raised by a plan holder. The questions and the <br />answers are indicated below: <br />Reference l Oth Court Plans: <br />1. Are we to construct the 15" RCP coming out of structures S-430 & S-431? (See sheet 7 of 20) (The <br />bid form only indicates we are to construct the mitered end sections. There is no line item for the 15" <br />RCP) <br />Yes you are to construct the I5" RCP with the subject project. Aline item has been added to the <br />Itemized Bid Schedule (Please see revised Itemized Bid Schedule' <br />a. Will these structures be constructed prior to the subject project being started? <br />Yes. The structures S-430 & S431 will have to be in place. <br />2. Are we to include the replacement of the concrete drive at Lot 1 and Lots 18 & 19, from the right- <br />of-way to the edge of pavement? <br />No. Please refer to Driveway Detail on sheet 4. <br />3. The quantity for the 4' sidewalk (Item #522-1) appears to be incorrect. My take -off indicated the <br />quantity to be approximately 310 SY in lieu of the 550 SY shown on the bid form. Could you please <br />verify? <br />1 <br />