My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-260
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-260
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2016 11:59:39 AM
Creation date
10/1/2015 12:29:40 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/19/2008
Control Number
2008-260
Agenda Item Number
8.R.
Entity Name
SPS Contracting
Subject
Petition Paving Contract
Area
10th Ct. Oslo Rd. to 7th St.SW, 1st.Rd.35th Ave. to 32nd Ave.
Project Number
0522, 0436
Bid Number
2008062
Supplemental fields
SmeadsoftID
7533
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The sidewalk quantity b • ,en < evised to 306 SY (Please revised Itemized Bid Schedif � <br /> Reference 1 " kctiau : <br /> 1 . The bid form shows 15 " RC ' . : : id 15 " MES . Should this be 12 "xl6 " ERCP ? <br /> The Itemized Bid Schedule 1: as been revised to reflect the changes. <br /> General : <br /> 1 . Is the fill quantity an in place measured quantity ? <br /> Yes, it is an in place measured quantity. <br /> 2 . There are some runs of existing 12" CMP that are not shown to be removed . Are we to remove all <br /> existing 12 " CMP where new pipe is being installed or only those to be removed ? <br /> Yes, within the existing right-of--way. The removal of existing pipes are paid underbid item 110-1 - I - <br /> Clearing & Grubbing. <br /> 3 . Will a pre-construction video of these two roads be required ? <br /> Yes. Please refer to Division I- General Requirements, under Section 01215- General Quality Control in <br /> your contract documents for detail specifications. <br /> 4 . The Bid form indicates we are to "furnish and install " mailboxes . Are we replacing these <br /> mailboxes with new ones? If so is there a detail available for the type of mailbox desired and how the <br /> County wants these to be installed? <br /> The furnishing and installing mailboxes will be on a case by case basis. If the mailboxes are severely <br /> damaged and can not be used after construction then replace in like kind. IRC has no standard detail <br /> for installing mailboxes. Please see FDOT Standard Specifications for Road and Bridge Construction <br /> 110. 10. 4 for further coordination during construction. <br /> The Bid shall contain an acknowledgment of receipt of all Addenda, the numbers of which shall be <br /> filled in on the Bid form . <br /> In the event the Contract is awarded to the Bidder, he will enter into a Contract with Indian <br /> River County and furnish the required Performance and Payment Bond . <br /> * * * * * * * * * * * * * This Addendum MUST be returned with your Bid * * * * * * * * * * * * * * <br /> All Bids must be mailed to or hand delivered to the Purchasing Division office located at <br /> 180027 th Street, Vero Beach, FL 32960 prior to the Date and Time shown above . Late bids <br /> will be returned unopened . <br /> Company Name ')125 (�O n treuI hnr; )►� <br /> Name : i' 1irnLnTitle : aQi-rce-4- nibti sYfcy�,r <br /> (Type / Printed) <br /> Authorized Signature : Date : 7 // / <br /> Telephone : z- 3 L?O Fax : Z7 .z 7 7 �' - <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.