Laserfiche WebLink
ments . CONTRACTOR shall at all times maintain ly will comply with any provisions of the General <br /> good discipline and order at the Site . Requirements applicable thereto. <br /> B . Except as otherwise required for the safety or 2 . Proposed adjustments in the <br /> protection of persons or the Work or property at the progress schedule that will change the Contract <br /> Site or adjacent thereto, and except as otherwise Times (or Milestones) shall be submitted <br /> in <br /> stated in the Contract Documents , all Work at the Site accordance with the requirements of Article 12 . <br /> shall be performed during regular working hours , and Such adjustments may only be made by a <br /> CONTRACTOR will not permit overtime work or the Change Order or Written Amendment in accor- <br /> performance of Work on Saturday, Sunday, or any dance with Article 12 , <br /> legal holiday without OWNER's written consent (which <br /> will not be unreasonably withheld ) given after prior 6 . 05 Substitutes and "Or-Equals" <br /> written notice to ENGINEER. <br /> A. Whenever an item of material or equipment is <br /> specified or described in the Contract Documents by <br /> 6 . 03 Services, Materials, and Equipment using the name of a proprietary item or the name of a <br /> particular Supplier, the specification or description is <br /> A. Unless otherwise specified in the General Re- intended to establish the type, function , appearance, <br /> quirements , CONTRACTOR shall provide and and quality required . Unless the specification or <br /> assume full responsibility for all services , materials, description contains or is followed by words reading <br /> equipment, labor, transportation , construction that no like, equivalent, or "or-equal" item or no <br /> equipment and machinery, tools , appliances , fuel , substitution is permitted , other items of material or <br /> power, light, heat, telephone, water, sanitary facilities , equipment or material or equipment of other Suppliers <br /> temporary facilities , and all other facilities and may be submitted to ENGINEER for review under the <br /> incidentals necessary for the performance, testing , circumstances described below. <br /> start-up , and completion of the Work. <br /> 1 . "Or-Equal" Items: If in ENGINEER's <br /> B . All materials and equipment incorporated into sole discretion an item of material or equipment <br /> the Work shall be as specified or, if not specified , shall proposed by CONTRACTOR is functionally <br /> be of good quality and new, except as otherwise equal to that named and sufficiently similar so <br /> provided in the Contract Documents . All warranties that no change in related Work will be required , <br /> and guarantees specifically called for by the Specifica- it may be considered by ENGINEER as an <br /> tions shall expressly run to the benefit of OWNER. If "or-equal" item , in which case review and <br /> required by ENGINEER, CONTRACTOR shall furnish approval of the proposed item may, in <br /> satisfactory evidence (including reports of required ENGINEER's sole discretion , be accomplished <br /> tests) as to the source, kind , and quality of materials without compliance with some or all of <br /> the <br /> and equipment. All materials and equipment shall be requirements for approval of proposed substk <br /> stored , applied , installed , connected , erected , tute items . For the purposes of this paragraph <br /> protected, used , cleaned , and conditioned in 6 .05 .A. 1 , a proposed item of material or <br /> accordance with instructions of the applicable equipment will be considered functionally equal <br /> Supplier, except as otherwise may be provided in the to an item so named if: <br /> Contract Documents . <br /> a . in the exercise of reasonable <br /> 6 . 04 Progress Schedule judgment ENGINEER determines that: (i) it <br /> is at least equal in quality, durability, <br /> A. CONTRACTOR shall adhere to the progress appearance, strength , and design <br /> schedule established in accordance with paragraph characteristics ; (ii) it will reliably perform at <br /> 2 .07 as it may be adjusted from time to time as least equally well the function imposed <br /> by <br /> provided below. the design concept of the completed Project <br /> as a functioning whole , and ; <br /> 1 . CONTRACTOR shall submit to <br /> ENGINEER for acceptance (to the extent indi- b . CONTRACTOR certifies that: (i) <br /> cated in paragraph 2 . 07) proposed adjustments there is no increase in cost to the OWNER; <br /> in the progress schedule that will not result in and (ii) it will conform substantially, even <br /> changing the Contract Times (or Milestones) . with deviations , to the detailed requirements <br /> Such adjustments will conform generally to the of the item named in the Contract <br /> progress schedule then in effect and additional- Documents . <br /> 00700 - General Conditions <br /> 00700 - 19 <br /> FAEngineering\Petition Paving\0522 1st Rd. from 32nd Ave. to 35th Ave\Bid Documents\00700 - General Conditions.doc <br />