Laserfiche WebLink
WIND <br /> 2 . Substitute Items directly or indirectly from use of such <br /> substitute item , including costs of redesign <br /> a . If in ENGINEER's sole discretion an and claims of other contractors affected by <br /> item of material or equipment proposed by any resulting change, all of which will be <br /> CONTRACTOR does not qualify as an considered by ENGINEER in evaluating the <br /> "or-equal" item under paragraph 6 . 05 .A. II it proposed substitute item . ENGINEER may <br /> will be considered a proposed substitute require CONTRACTOR to furnish additional <br /> item . data about the proposed substitute item . <br /> b . CONTRACTOR shall submit suffi- B. Substitute Construction Methods or Proce- <br /> cient information as provided below to allow dures: If a specific means, method , technique , se- <br /> ENGINEER to determine that the item of quence , or procedure of construction is shown or <br /> material or equipment proposed is indicated in and expressly required by the Contract <br /> essentially equivalent to that named and an Documents , CONTRACTOR may furnish or utilize a <br /> acceptable substitute therefor. Requests for substitute means , method , technique, sequence, or <br /> review of proposed substitute items of procedure of construction approved by ENGINEER. <br /> material or equipment will not be accepted CONTRACTOR shall submit sufficient information to <br /> by ENGINEER from anyone other than allow ENGINEER, in ENGINEER's sole discretion , to <br /> CONTRACTOR, determine that the substitute proposed is equivalent to <br /> that expressly called for by the Contract Documents . <br /> c . The procedure for review by ENGI- The procedure for review by ENGINEER will be similar <br /> NEER will be as set forth in paragraph to that provided in subparagraph 6 .05 .A.2. <br /> 6 . 05 .A.2 .d , as supplemented in the General <br /> Requirements and as ENGINEER may C . Engineer's Evaluation: ENGINEER will be <br /> decide is appropriate under the allowed a reasonable time within which to evaluate <br /> circumstances . each proposal or submittal made pursuant to para- <br /> graphs 6.05 .A and 6 .05 . 13 . ENGINEER will be the <br /> d . CONTRACTOR shall first make sole judge of acceptability. No "or-equal" or substitute <br /> written application to ENGINEER for review will be ordered , installed or utilized until ENGINEER's <br /> of a proposed substitute item of material or review is complete , which will be evidenced by either a <br /> equipment that CONTRACTOR seeks to Change Order for a substitute or an approved Shop <br /> furnish or use . The application shall certify Drawing for an "or equal " ENGINEER will advise <br /> that the proposed substitute item will CONTRACTOR in writing of any negative <br /> perform adequately the functions and determination , <br /> achieve the results called for by the general <br /> design , be similar in substance to that D . Special Guarantee: OWNER may require <br /> specified , and be suited to the same use as CONTRACTOR to furnish at CONTRACTOR's ext, <br /> that specified . The application will state the pense a special performance guarantee or other <br /> extent, if any, to which the use of the pro- surety with respect to any substitute. <br /> posed substitute item will prejudice <br /> CONTRACTOR's achievement of Substan- E. ENGINEER's Cost Reimbursement: <br /> tial Completion on time , whether or not use ENGINEER will record time required by ENGINEER <br /> of the proposed substitute item in the Work and ENGINEER's Consultants in evaluating substitute <br /> will require a change in any of the Contract proposed or submitted by CONTRACTOR pursuant to <br /> Documents (or in the provisions of any other paragraphs 6 .05.A.2 and 6 .05 . 13 and in making <br /> direct contract with OWNER for work on the changes in the Contract Documents (or in the <br /> Project) to adapt the design to the proposed provisions of any other direct contract with OWNER <br /> substitute item and whether or not for work on the Project) occasioned thereby. Whether <br /> incorporation or use of the proposed substi- or not ENGINEER approves a substitute item so pro- <br /> tute item in connection with the Work is sub- posed or submitted by CONTRACTOR, COW <br /> ject to payment of any license fee or royalty. TRACTOR shall reimburse OWNER for the charges <br /> All variations of the proposed substitute of ENGINEER and ENGINEER's Consultants for <br /> item from that specified will be identified in evaluating each such proposed substitute, <br /> the application , and available engineering , <br /> sales , maintenance, repair, and F. CONTRACTOR's Expense: CONTRACTOR <br /> replacement services will be indicated . The shall provide all data in support of any proposed <br /> application will also contain an itemized esti- substitute or "or-equal" at CONTRACTOR's expense . <br /> mate of all costs or credits that will result <br /> 00700 - General Conditions <br /> 00700 - 20 <br /> F:\Engineering\Petition Paving\0522 1st Rd. from 32nd Ave. to 35th Ave\Bid Documents\00700 - General Conditions.doc <br />