a Claim may be made therefore as provided in accordance with the provisions of paragraph 10 .05,
<br /> paragraph 10 . 05. with a request for a formal decision .
<br /> 9 . 06 Rejecting Defective Work B . When functioning as interpreter and judge
<br /> under this paragraph 9 . 09 , ENGINEER will not show
<br /> A. ENGINEER will have authority to disapprove partiality to OWNER or CONTRACTOR and will not
<br /> or reject Work which ENGINEER believes to be be liable in connection with any interpretation or
<br /> defective, or that ENGINEER believes will not produce decision rendered in good faith in such capacity. The
<br /> a completed Project that conforms to the Contract rendering of a decision by ENGINEER pursuant to this
<br /> Documents or that will prejudice the integrity of the paragraph 9 .09 with respect to any such Claim ,
<br /> design concept of the completed Project as a dispute, or other matter (except any which have been
<br /> functioning whole as indicated by the Contract waived by the making or acceptance of final payment
<br /> Documents . ENGINEER will also have authority to as provided in paragraph 14 .07) will be a condition
<br /> require special inspection or testing of the Work as precedent to any exercise by OWNER or
<br /> provided in paragraph 13 . 04 , whether or not the Work CONTRACTOR of such rights or remedies as either
<br /> is fabricated , installed , or completed , may otherwise have under the Contract Documents or
<br /> by Laws or Regulations in respect of any such Claim ,
<br /> 9 .07 Shop Drawings, Change Orders and dispute , or other matter.
<br /> Payments
<br /> 9 . 10 Limitations on ENGINEER 's Authority and
<br /> A. In connection with ENGINEER's authority as Responsibilities
<br /> to Shop Drawings and Samples , see paragraph 6 . 17 .
<br /> A. Neither ENGINEER's authority or respon-
<br /> B . In connection with ENGINEER's authority as sibility under this Article 9 or under any other provision
<br /> to Change Orders , see Articles 101 11 , and 12 . of the Contract Documents nor any decision made by
<br /> ENGINEER in good faith either to exercise or not
<br /> C . In connection with ENGINEER's authority as exercise such authority or responsibility or the
<br /> to Applications for Payment, see Article 14 . undertaking , exercise, or performance of any authority
<br /> or responsibility by ENGINEER shall create, impose,
<br /> 9 .08 Determinations for Unit Price Work or give rise to any duty in contract, tort, or otherwise
<br /> owed by ENGINEER to CONTRACTOR, any Subcon-
<br /> A. ENGINEER will determine the actual quantk tractor, any Supplier, any other individual or entity, or
<br /> ties and classifications of Unit Price Work performed to any surety for or employee or agent of any of them .
<br /> by CONTRACTOR. ENGINEER will review with
<br /> CONTRACTOR the ENGINEER's preliminary B . ENGINEER will not supervise, direct, control ,
<br /> determinations on such matters before rendering a or have authority over or be responsible for
<br /> written decision thereon (by recommendation of an CONTRACTOR's means , methods , techniques, sem
<br /> Application for Payment or otherwise) . ENGINEER's quences , or procedures of construction , or the safety
<br /> written decision thereon will be final and binding precautions and programs incident thereto , or for any
<br /> (except as modified by ENGINEER to reflect changed failure of CONTRACTOR to comply with Laws and
<br /> factual conditions or more accurate data) upon Regulations applicable to the performance of the
<br /> OWNER and CONTRACTOR, subject to the Work. ENGINEER will not be responsible for
<br /> provisions of paragraph 10 .05 . CONTRACTOR's failure to perform the Work in
<br /> accordance with the Contract Documents .
<br /> 9 . 09 Decisions on Requirements of Contract
<br /> Documents and Acceptability of Work C . ENGINEER will not be responsible for the
<br /> acts or omissions of CONTRACTOR or of any
<br /> A. ENGINEER will be the initial interpreter of the Subcontractor, any Supplier, or of any other individual
<br /> requirements of the Contract Documents and judge of or entity performing any of the Work.
<br /> the acceptability of the Work thereunder. Claims ,
<br /> disputes and other matters relating to the acceptability D . ENGINEER's review of the final Application
<br /> of the Work, the quantities and classifications of Unit for Payment and accompanying documentation and all
<br /> Price Work, the interpretation of the requirements of maintenance and operating instructions , schedules,
<br /> the Contract Documents pertaining to the guarantees , Bonds, certificates of inspection , tests
<br /> performance of the Work, and Claims seeking and approvals , and other documentation required to
<br /> changes in the Contract Price or Contract Times will be delivered by paragraph 14 .07 .A will only be
<br /> to
<br /> be referred initially to ENGINEER in writing , in determine generally that their content complies with
<br /> the requirements of, and in the case of certificates of
<br /> 00700 - General Conditions
<br /> 00700 - 29
<br /> FAEngineeringTetilion Paving\0522 Ist Rd. from 32nd Ave. to 35th Ave\Bid Documents\D0700 - General Conditions.doc
<br />
|