Laserfiche WebLink
AMENDMENT 3 <br /> CR 510 FINAL ENGINEERING REPORT <br /> This is an amendment to the existing Final Design and Plans Preparation services agreement <br /> (AGREEMENT), dated November 17, 2005, by and between INDIAN RIVER COUNTY, hereinafter <br /> referred to as the COUNTY, and STANLEY CONSULTANTS, INC . , hereinafter referred to as the <br /> ENGINEER. This amendment addresses changes in "Section I — Project Limits and Description, Section II — <br /> COUNTY Obligations, Section III — Scope of Services, Section IV — Time for Completion, and Section V - <br /> Compensation" of the AGREEMENT, by adding the services below. <br /> Amendment Description <br /> SECTION I - PROJECT LIMITS AND DESCRIPTION is being modified to incorporate the following <br /> engineering services : <br /> A. CR 510 Final Engineering Report. The report will cover the CR 510 corridor only and not side <br /> streets. The limits are from the intersection of CR510/CR512 to the bridge, number 880052, on <br /> the west bank of the Indian River. <br /> SECTION II — COUNTY OBLIGATIONS is being modified to incorporate the following: <br /> A. Provide right-of-way cost estimates. <br /> B. Obtain construction cost estimates from Kimley-Horn and McMahon and Associates for inclusion <br /> into the Final Engineering Report. <br /> C. Obtain documentation of roadway alignment and pond siting decisions from Kimley-Horn and <br /> McMahon and Associates for inclusion into the Final Engineering Report. <br /> D. Obtain documentation of utility impacts and required relocations of COUNTY owned utilities <br /> and non COUNTY owned utilities within easements from Kimley-Horn and McMahon and <br /> Associates for inclusion into the Final Engineering Report and cost estimating purposes. <br /> E. Obtain PDF files of key sheets, typical sections and roadway plan sheets from Kimley-Horn and <br /> McMahon and Associates for inclusion into the Final Engineering Report Appendix. <br /> SECTION III - SCOPE OF SERVICES is being modified to incorporate the following: <br /> Update the Draft Preliminary Engineering Report developed during the FDOT Project Development <br /> and Environmental (PD&E) Study, dated July 2005 to create a Final Engineering Report. The Final <br /> Engineering Report will include the alternative alignment analyses documented in the Draft PD&E <br /> Study and the County' s SCALE criteria. The purpose of this report is to document the basis for the <br /> major engineering designs as of January 2008. This amendment does not include new alignment <br /> alternatives or new pond siting analysis. Preliminary CR 510 plan sheets that are available will be <br /> included in the appendix. The appendix will include the typical sections, plan sheets and other project <br /> documentation available as of January 1 , 2008 . <br /> CR 510 Amendment 3 Page I of 4 1 / 17/2008 <br />