My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-040
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-040
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2026 11:50:27 AM
Creation date
9/30/2015 11:58:06 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Third Amendment
Approved Date
02/05/2008
Control Number
2008-040
Agenda Item Number
7.LL
Entity Name
Stanley Consultants, Inc.
Subject
Amendment No.3 CR 510 Final Engineering Report
Area
CR 510 corridor
Archived Roll/Disk#
4011
Supplemental fields
SmeadsoftID
6861
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AMENDMENT 3 <br />CR 510 FINAL ENGINEERING REPORT <br />This is an amendment to the existing Final Design and Plans Preparation services agreement <br />(AGREEMENT), dated November 17, 2005, by and between INDIAN RIVER COUNTY, hereinafter <br />referred to as the COUNTY, and STANLEY CONSULTANTS, INC., hereinafter referred to as the <br />ENGINEER. This amendment addresses changes in "Section I — Project Limits and Description, Section II — <br />COUNTY Obligations, Section III — Scope of Services, Section IV — Time for Completion, and Section V - <br />Compensation" of the AGREEMENT, by adding the services below. <br />Amendment Description <br />SECTION I - PROJECT LIMITS AND DESCRIPTION is being modified to incorporate the following <br />engineering services: <br />A. CR 510 <br />Final Engineering Report. The report will cover the <br />CR <br />510 corridor only and not side <br />streets. <br />The limits are from the intersection of CR510/CR512 <br />to <br />the bridge, number 880052, on <br />the west bank of the Indian River. <br />SECTION II — COUNTY OBLIGATIONS is being modified to incorporate the following: <br />A. Provide right-of-way cost estimates. <br />B. Obtain construction cost estimates from Kimley-Horn and McMahon and Associates for inclusion <br />into the Final Engineering Report. <br />C. Obtain documentation of roadway alignment and pond siting decisions from Kimley-Horn and <br />McMahon and Associates for inclusion into the Final Engineering Report. <br />D. Obtain documentation of utility impacts and required relocations of COUNTY owned utilities <br />and non COUNTY owned <br />utilities <br />within easements from <br />Kimley-Horn and McMahon and <br />Associates for inclusion into <br />the Final <br />Engineering Report and <br />cost estimating purposes. <br />E. Obtain PDF files of key sheets, typical sections and roadway plan sheets from Kimley-Horn and <br />McMahon and Associates for inclusion into the Final Engineering Report Appendix. <br />SECTION III - SCOPE OF SERVICES is being modified to incorporate the following: <br />Update the Draft Preliminary Engineering Report developed during the FDOT Project Development <br />and Environmental (PD&E) Study, dated July 2005 to create a Final Engineering Report. The Final <br />Engineering Report will include the alternative alignment analyses documented in the Draft PD&E <br />Study and the County's SCALE criteria. The purpose of this report is to document the basis for the <br />major engineering designs as of January 2008. This amendment does not include new alignment <br />alternatives or new pond siting analysis. Preliminary CR 510 plan sheets that are available will be <br />included in the appendix. The appendix will include the typical sections, plan sheets and other project <br />documentation available as of January 1, 2008. <br />CR 510 Amendment 3 Page I of 4 1/17/2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.