My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-040
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-040
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2016 11:40:12 AM
Creation date
9/30/2015 11:58:06 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Third Amendment
Approved Date
02/05/2008
Control Number
2008-040
Agenda Item Number
7.LL
Entity Name
Stanley Consultants, Inc.
Subject
Amendment No.3 CR 510 Final Engineering Report
Area
CR 510 corridor
Archived Roll/Disk#
4011
Supplemental fields
SmeadsoftID
6861
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. The Final Engineering Report will contain the following sections based on the Draft <br /> Preliminary Engineering Report dated July 2005 <br /> 1 . Summary. <br /> 2. Introduction. <br /> 3 . Need for Improvement. <br /> 4. Existing Conditions. <br /> 5 . Traffic. <br /> 6. Alternative Alignment Analysis. <br /> 7 . Design Analysis and Recommendations <br /> a. Safety <br /> b. Cost Estimates <br /> i. Construction <br /> ii. Utility relocations of COUNTY owned utilities and utilities within <br /> easements <br /> iii. Right-of-way <br /> c. Long Range Planning <br /> d. Environmental <br /> e. Comparison Matrix <br /> 8 . Pond Siting Documentation Summary. <br /> 9. Typical Section Sheets. The sheets will be PDF prints from the CR 510 project segments <br /> from Stanley Consultants, Kimley-Horn and McMahon, using 60% plan submittal <br /> information or current approved plans as of January 2008. <br /> 10. Plan/Profile Sheet Sheets. The sheets will be PDF prints from the CR 510 project <br /> segments of the Stanley Consultants, Kimley-Horn and McMahon, using 60% plan <br /> submittal information or current approved plans as of January 2008 . <br /> 11 . Appendix. Includes Key Sheets, Typical Section Sheets, Plan/Profile Sheets, Pond Siting <br /> documentation and other existing documentation as needed. <br /> B. A total of two review periods are anticipated. One review period for COUNTY to review the <br /> draft report (Initial Review) and one review period for COUNTY to review the revised draft <br /> report (Final Review). Each COUNTY review period shall be for a one week duration. This <br /> amendment includes two revisions to the Final Engineering Report. One revision shall be <br /> completed after the Initial Review and another revision shall be completed after the Final <br /> Review by the COUNTY. <br /> CR 510 Amendment 3 Page 2 of 4 1 / 17/2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.