My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-040
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-040
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2026 11:50:27 AM
Creation date
9/30/2015 11:58:06 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Third Amendment
Approved Date
02/05/2008
Control Number
2008-040
Agenda Item Number
7.LL
Entity Name
Stanley Consultants, Inc.
Subject
Amendment No.3 CR 510 Final Engineering Report
Area
CR 510 corridor
Archived Roll/Disk#
4011
Supplemental fields
SmeadsoftID
6861
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. The Final Engineering Report will contain the following sections based on the Draft <br />Preliminary Engineering Report dated July 2005 : <br />1. Summary. <br />2. Introduction. <br />3. Need for Improvement. <br />4. Existing Conditions. <br />5. Traffic. <br />6. Alternative Alignment Analysis. <br />7. Design Analysis and Recommendations <br />a. Safety <br />b. Cost Estimates <br />i. Construction <br />ii. Utility relocations of COUNTY owned utilities and utilities within <br />easements <br />iii. Right-of-way <br />c. Long Range Planning <br />d. Environmental <br />e. Comparison Matrix <br />8. Pond Siting Documentation Summary. <br />9. Typical Section Sheets. The sheets will be PDF prints from the CR 510 project segments <br />from Stanley Consultants, Kimley-Hom and McMahon, using 60% plan submittal <br />information or current approved plans as of January 2008. <br />10. Plan/Profile Sheet Sheets. The sheets will be PDF prints from the CR 510 project <br />segments of the Stanley Consultants, Kimley-Horn and McMahon, using 60% plan <br />submittal information or current approved plans as of January 2008. <br />11. Appendix. Includes Key Sheets, Typical Section Sheets, Plan/Profile Sheets, Pond Siting <br />documentation and other existing documentation as needed. <br />B. A total of two review periods are anticipated. One review period for COUNTY to review the <br />draft report (Initial Review) and one review period for COUNTY to review the revised draft <br />report (Final Review). Each COUNTY review period shall be for a one week duration. This <br />amendment includes two revisions to the Final Engineering Report. One revision shall be <br />completed after the Initial Review and another revision shall be completed after the Final <br />Review by the COUNTY. <br />CR 510 Amendment 3 Page 2 of 4 <br />1/17/2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.