Laserfiche WebLink
Jul • 30 . 1996 6 : 33FM No • ? IB7 F - 11 / 16 <br /> NEC NFC Unified Solutions, Inc. <br /> 4. 10. Provide applicable configuration detail for applications involving other service <br /> providers (i .e. paging service). <br /> 4. 11 . Submit database changes prior to Cutoff Date and approve System database. <br /> 5. NEAX Voice System Installation and Configuration (Excluding <br /> Terminals) <br /> NEC shall be responsible for the following: <br /> 5 . 1 . Install equipment rack and components, test power system, install rectifier and <br /> battery (if applicable). <br /> 5.2. Assemble the Main Distribution Frame (MDF) and the System Modules (as <br /> applicable) . <br /> 5 . 3. Interconnect the System Modules to the switch-side blocks on the MDF (as <br /> applicable). <br /> 5.4. Install, program, and test circuit cards to be used as interface to the NEAX voice <br /> system solution, including necessary MDF and integration connections. <br /> 5.5. Verify and/or develop trunk route and dial plan configurations with input from <br /> Customer design team (if applicable) . <br /> 5.6. Verify or configure system to the approved database, user classes of service, and toil <br /> and station restrictions (as applicable). <br /> 5.7. Develop the implementation-specific network diagram and equipment room <br /> diagram(s) with input from Customer and/or the design team. <br /> 5.8. Input Customer-approved database into the PBX. <br /> 5. 9. Determine that all local and long-distance services have been installed by the "Telco" <br /> at the customer's demarcation point (as applicable). <br /> 5. 10. Determine status of any dial-up or LANM/AN connections that will be made to the <br /> system for customer access. <br /> 5. 11 . Connect remote maintenance access to support NEC service access to system for <br /> duration of warranty and maintenance period (per Equipment List) <br /> 5. 12 . Cutover the system by MDF cross-connect (as applicable) and perform post-cutover <br /> testing. <br /> 5. 13 . Deliver system installation documentation. <br /> Customer shall be responsible for the following: <br /> 5. 14. Mutual identification of installation location. Ensure all power and cabling <br /> requirements are accessible to this location . <br /> 5. 15. If applicable, provide appropriately sized UPS. <br /> 6. 16. Approve and perform Customer-provided changes to equipment room(s). <br /> 5. 17. Adhere to cutoff date for database changes in Implementation Plan. <br /> 6. Station Cabling — Rouse <br /> NEC shall be responsible for the following: <br /> 6. 1 . Meet with Customer to discuss the location and condition of the existing station cable <br /> including any known problems. Plan the station-side of the MDF. <br /> 6.2. Test and label all telephone station cable for the number of locations specified in the <br /> Equipment List. <br /> Customer shall be responsible for the following: <br /> NEC Unlned Solutions, Inc. Proprietary And Confidential 11 Of 18 <br /> 1003272 Y. 1 1177@006 <br />