Laserfiche WebLink
L <br /> TECHNICAL SPECIFICATIONS <br /> 1 . 01 GENERAL <br /> A. Visit to and inspection of the construction site will be made from time to time <br /> by <br /> representatives of permitting agencies , the Owner, or Engineer. The work will not be <br /> accepted by the owner until final acceptance is received by all jurisdictional agencies . <br /> B . No work shall be performed outside the limits of the designated work site without <br /> r <br /> authorization by the Owner. <br /> k <br /> C . Furnish sufficient labor, construction equipment and materials, and work as may be <br /> necessary to insure the prosecution of the work in accordance with the approved progress <br /> schedule . <br /> D . All excess excavated material and demolished seawall cap shall remain the property of the <br /> OWNER and shall be disposed of by the CONTRACTOR as directed by the ENGINEER and <br /> ift approved by the OWNER. <br /> E . Maintain traffic within the limits of the project for the duration of the construction period. <br /> Construct and maintain any necessary detours . Provide for access to residences etc . Furnish, <br /> L install and maintain traffic control and safety devices during construction. All traffic work <br /> L shall be in accordance with the Manual on Uniform Traffic Control Devices and Indian River <br /> County Traffic Department. <br /> F . Limits of the work will be defined by the ENGINEER. <br /> 1 .02 FIELD ENGINEERING AND LAYOUT <br /> A. The contractor shall furnish all construction staking. Staking shall be supervised by a <br /> Florida Registered Land Surveyor. <br /> B . Appropriate equipment shall be kept at the site at all times . <br /> C . All costs for staking the work shall be included in the appropriate bid items . <br /> D . The Contractor shall preserve all staking, benchmarks, reference points , etc . <br /> 1 .03 TESTING <br /> A. The Owner will pay for services of independent testing laboratories . CONTRACTOR <br /> shall coordinate all tests . One set of five field control cylinder specimen shall be taken for <br /> every days pour. One slump test shall be performed for each set of test cylinders taken . <br /> 1 . 04 SUBMITTALS <br /> rr <br /> A. CONTRACTOR shall be required to submit_ for approval a construction progress <br /> schedule . No work shall proceed or Notice to Proceed issued until that schedule is <br /> it <br /> Page 28 of 55 <br />