Laserfiche WebLink
1 . 02 Terminology spe^ ; aed lecatie.,) ready ruse or- + ll tiana <br /> • in usable or operable vpnd{Ci <br /> Vjf <br /> A. Intent of Certain Terms or Adjectives <br /> 2 The wend "install, " when used in eennee <br /> 1 . Whenever in the Contract Documents the *on 3Aith serviees , materials;er equipment, shall <br /> terms "as allowed, " "as approved, " or terms of like <br /> effect or import are used, or the adjectives "reasonable," seri es terials, er equipment eemplete—ted <br /> "suitable, " "acceptable, " "proper, " "satisfactory," or read. , f r intended use <br /> adjectives of like effect or import are used to describe <br /> an action or determination of ENGINEER as to the 3 . The words"perferm" or- previde, " rake <br /> Work, it is intended that such action or determination used in eon neetien with services, materials, or <br /> will be solely to evaluate, in general, the completed equipment, shall Mean to fil h and 4tstall <br /> said <br /> Work for compliance with the requirements of and ateFials, <br /> information in the Contract Documents and confor- f r intended <br /> mance with the design concept of the completed Project <br /> as a functioning whole as shown or indicated in the Paragraph DA has been deleted in its entirety. <br /> Contract Documents (unless there is a specific statement 4. When "furnish," "install,""peFfeFrr-42 er " <br /> indicating otherwise). The use of any such term or wide" is net used in—Wan eotion—V; 4th se>V roes; <br /> adjective shall not be effective to assign to ENGINEER , <br /> any duty or authority to supervise or direct the an obligation efTEl} 944 ACT-OPg— pFevide" is <br /> performance of the Work or any duty or authority to 43phed. <br /> undertake responsibility contrary to the provisions of <br /> paragraph 9 . 10 or any other provision of the Contract E. Unless stated otherwise in the Contract Docu- <br /> Documents . ments, words or phrases which have a well-known technical <br /> or construction industry or trade meaning are used in the <br /> B . Day Contract Documents in accordance with such recognized <br /> meaning. <br /> • 1 . The word "day" shall constitute a <br /> calendar day of 24 hours measured from midnight to <br /> the next midnight. ARTICLE 2 - PRELIMINARY MATTERS <br /> C . Defective <br /> 2 . 01 Delivery of Bonds <br /> 1 . The word "defective, " when modifying <br /> the word "Work, " refers to Work that is A. When CONTRACTOR delivers the executed <br /> unsatisfactory, faulty, or deficient in that it does not Agreements to OWNER, CONTRACTOR shall also deliver <br /> conform to the Contract Documents or does not to OWNER such Bonds as CONTRACTOR may be <br /> meet the requirements of any inspection, reference required to fimrnish. <br /> standard, test, or approval referred to in the Contract <br /> Documents, or has been damaged prior to 2 . 02 Copies of Documents <br /> ENGINEER ' s recommendation of final payment <br /> (unless responsibility for the protection thereof has A. OWNER shall furnish to CONTRACTOR up to <br /> been assumed by OWNER at Substantial ten copies of the Contract Documents . Additional copies <br /> Completion in accordance with paragraph 14 .04 or will be furnished upon request at the cost of reproduction. <br /> 14 .05 ) . <br /> 2 . 03 Commencement of Contract Times; Notice to <br /> Paragraphs D. 1 , 2 and 3 have been deleted and replaced Proceed <br /> by new paragraphs. See the Supplementary Conditions. <br /> D . Furnish, Install, Perform, Provide A. The Contract Times will commence to run on the <br /> thirtieth day after the Effective Date of the Agreement or, if <br /> 1 . The wend "farnish3, , when used in a Notice to Proceed is given, on the day indicated in the <br /> ce..ec ..+e all equipment,.==�:_ :,=u= ��� ^ , Notice to Proceed. A Notice to Proceed <br />may be given at <br /> shall mean to supply and deliver- saidseAyli ��Uyany time within 30 days after the Effective Date <br /> of the <br /> • =muster-i In ^r equipment to the Site (or- some ^tl, er Agreement. In no event will the Contract Times commence <br /> to run later than the sixtieth day after the day of Bid opening <br /> IRC OPERATIONS COMPLEX 00700 - Standard General Conditions of the Construction Contract <br /> 00700 -9 <br />