2005-033
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2016 2:00:33 PM
Creation date
9/30/2015 7:40:41 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
01/18/2005
Control Number
2005-033
Agenda Item Number
11.J.1
Entity Name
Summit Construction
Subject
Utilities Operations Complex Change Order No. 1
Area
Operations Complex
Project Number
6037
Bid Number
7026
Archived Roll/Disk#
4000
Supplemental fields
SmeadsoftID
3869
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
746
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
or the thirtieth day after the Effective Date of the Paragraph 2 . 05.0 has been deleted and replaced with a <br /> Agreement, whichever date is earlier. new paragraph. See the Supplementary Conditions. <br /> Q Evidence of Insuranee.- Be€er any 3A'o a. t t <br /> 2 . 04 Starting the Work Site is .tatted, CONTRACT-OR a 03AWER shallea <br /> � <br /> deliver to the other-) rill. o to M e additional al e .7 <br /> deliver- <br /> A. CONTRACTOR shall start to perform the Work identified in the VFlp11111*U1 Conditions, -: f r <br /> on the date when the Contract Times commence to run. No °^ ^ e (and other e idenee o f ' � ' h <br /> either- � <br /> 11 Ll ClZ ^ \w Lyyll•+l. Vl 11 <br /> Work shall be done at the Site prior to the date on which the them er any additIOIQZ IIIDQIGu a aauo Viubl IICJt) <br /> Contract Times commence to run. Xh CONTRACTOR and OWNER respeetively- are <br /> � Ii ed to pur-ehase—and maiitain in aeeerdanee—with <br /> 2 . 05 Before Starting Construction Artiele 5 . <br /> A. CONTRACTOR 's Review of Contract Documents: Paragraph 2 .06.A has been deleted and replaced with a <br /> Before undertaking each part of the Work, new paragraph. See the Supplementary Conditions. <br /> CONTRACTOR shall carefully study and compare the 2 . 06 Preconstruction Conference <br /> Contract Documents and check and verify pertinent figures <br /> therein and all applicable field measurements . A . Within 20 days after the GeritFaet les start to <br /> ntin but bay �x eEk at the Site � .+ a v <br /> CONTRACTOR shall promptly report in writing to before any . .,Ll� u V34r 1S JL , <br /> ENGINEER any conflict, error, ambiguity, or discrepancy attended by CONTRACTOR;R-NQPTEER, and others—as <br /> which CONTRACTOR may discover and shall obtain a appropriate iNill be held to establish a welling <br /> written interpretation or clarification from ENGINEER undemtanding among the parties as to the—Work and <br /> to. <br /> before proceeding with any Work affected thereby; discuss the sehedules r-e€effed to in paragraph <br /> however, CONTRACTOR shall not be liable to OWNER proeedurzes for- handling Shop DravAngs and--ether- <br /> or ENGINEER for failure to report any conflict, error, submittals, Applications for- Payment, and <br /> ambiguity, or discrepancy in the Contract Documents unless . <br /> CONTRACTOR knew or reasonably should have known <br /> thereof. 2 . 07 Initial Acceptance of Schedules <br /> . B . Preliminary Schedules: Within ten days after the A . Unless otherwise provided in the Contract Docu- <br /> Effective Date of the Agreement (unless otherwise specified ments, at least ten days before submission of the <br /> first <br /> in the General Requirements) , CONTRACTOR shall Application for Payment a conference attended by CON- <br /> submit to ENGINEER for its timely review: TRACTOR, ENGINEER, and others as appropriate will be <br /> held to review for acceptability to ENGINEER as provided <br /> 1 . a preliminary progress schedule indicat- below the schedules submitted in accordance with <br /> ing the times (numbers of days or dates) for starting paragraph 2 . 05 .B . CONTRACTOR shall have an <br /> and completing the various stages of the Work, additional ten days to make corrections and adjustments and <br /> including any Milestones specified in the Contract to complete and resubmit the schedules . No progress <br /> Documents ; payment shall be made to CONTRACTOR until acceptable <br /> schedules are submitted to ENGINEER. <br /> 2 . a preliminary schedule of Shop Drawing <br /> and Sample submittals which will list each required 1 . The progress schedule will be acceptable <br /> submittal and the times for submitting, reviewing, to ENGINEER if it provides an orderly progression <br /> and processing such submittal; and of the Work to completion within any specified <br /> Milestones and the Contract Times. Such accep- <br /> 3 . a preliminary schedule of values for all of tance will not impose on ENGINEER responsibility <br /> the Work which includes quantities and prices of for the progress schedule, for sequencing, schedul- <br /> items which when added together equal the Contract ing, or progress of the Work nor interfere with or <br /> Price and subdivides the Work into component parts relieve CONTRACTOR from CONTRACTOR 's <br /> in sufficient detail to serve as the basis for progress full responsibility therefor. <br /> payments during performance of the Work. Such <br /> prices will include an appropriate amount of 2 . CONTRACTOR ' s schedule of Shop <br /> overhead and profit applicable to each item of Drawing and Sample submittals will be acceptable <br /> Work. to ENGINEER if it provides a workable <br /> arrangement for reviewing and processing the <br /> required submittals . <br /> IRC OPERATIONS COMPLEX 00700 - Standard General Conditions of the Construction Contract <br /> 00700 - 10 <br />