My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-033
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2016 2:00:33 PM
Creation date
9/30/2015 7:40:41 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
01/18/2005
Control Number
2005-033
Agenda Item Number
11.J.1
Entity Name
Summit Construction
Subject
Utilities Operations Complex Change Order No. 1
Area
Operations Complex
Project Number
6037
Bid Number
7026
Archived Roll/Disk#
4000
Supplemental fields
SmeadsoftID
3869
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
746
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A . The Contract Documents may be amended to result of any delay in OWNER ' s furnishing <br /> the Site, <br /> • provide for additions, deletions, and revisions in the Work CONTRACTOR may make a Claim therefor as provided in <br /> or to modify the terms and conditions thereof in one or paragraph 10 . 05 . <br /> more of the following ways : ( i) a Written Amendment; (ii) a <br /> Change Order; or (iii) a Work Change Directive . B . Upon reasonable written request, OWNER shall <br /> famish CONTRACTOR with a current statement of record <br /> B . The requirements of the Contract Documents may legal title and legal description of the lands upon which the <br /> be supplemented, and minor variations and deviations in the Work is to be performed and OWNER ' s interest therein as <br /> Work may be authorized, by one or more of the following necessary for giving notice of or filing a mechanic's <br /> or <br /> ways : (i) a Field Order; (ii) ENGINEER ' s approval of a construction lien against such lands in <br /> accordance with <br /> Shop Drawing or Sample ; or (iii) ENGINEER' s written applicable Laws and Regulations. <br /> interpretation or clarification. <br /> C. CONTRACTOR shall provide for all additional <br /> 3 . 05 Reuse of Documents lands and access thereto that may be required for temporary <br /> construction facilities or storage of materials and equip- <br /> A . CONTRACTOR and any Subcontractor or ment. <br /> Supplier or other individual or entity performing or <br /> furnishing any of the Work under a direct or indirect 4 . 02 Subsurface and Physical Conditions <br /> contract with OWNER: (i) shall not have or acquire any title <br /> to or ownership rights in any of the Drawings, A. Reports and Drawings : The Supplementary <br /> Specifications, or other documents (or copies of any Conditions identify: <br /> thereof) prepared by or bearing the seal of ENGINEER or <br /> ENGINEER' s Consultant, including electronic media 1 . those reports of explorations and tests of <br /> editions ; and (ii) shall not reuse any of such Drawings, subsurface conditions at or contiguous to <br /> the Site <br /> Specifications, other documents, or copies thereof on that ENGINEER has used in preparing the Contract <br /> extensions of the Project or any other project without Documents ; and <br /> written consent of OWNER and ENGINEER and specific <br /> written verification or adaption by ENGINEER. This 2 . those drawings of physical conditions in <br /> prohibition will survive final payment, completion, and or relating to existing surface or subsurface <br /> struc- <br /> acceptance of the Work, or termination or completion of the tures at or contiguous to the Site (except <br /> Contract. Nothing herein shall preclude CONTRACTOR Underground Facilities) that ENGINEER has used <br /> from retaining copies of the Contract Documents for record in preparing the Contract Documents . <br /> purposes . <br /> B . Limited Reliance by CONTRACTOR on Technical <br /> A new Section, 3 .06 — "Coordination of Plans, Data Authorized: CONTRACTOR may rely upon the <br /> Specifications, and Special Provisions " has been added. general accuracy of the "technical data" contained in such <br /> See the Supplementary Conditions. reports and drawings, but such reports and drawings are not <br /> Contract Documents . Such "technical data" is identified in <br /> ARTICLE 4 - AVAILABILITY OF LANDS ; the Supplementary Conditions . Except for such reliance on <br /> SUBSURFACE AND PHYSICAL CONDITIONS ; such "technical data," CONTRACTOR may not rely upon <br /> REFERENCE POINTS or make any Claim against OWNER, ENGINEER, or any <br /> of ENGINEER' s Consultants with respect to : <br /> 4 . 01 Availability of Lands 1 . the completeness of such reports and <br /> drawings for CONTRACTOR' s purposes, including, <br /> A. OWNER shall furnish the Site. OWNER shall but not limited to, any aspects of the means, <br /> notify CONTRACTOR of any encumbrances or restrictions methods, techniques, sequences, and procedures of <br /> not of general application but specifically related to use of construction to be employed by CONTRACTOR, <br /> the Site with which CONTRACTOR must comply in and safety precautions and programs incident <br /> performing the Work. OWNER will obtain in a timely thereto; or <br /> manner and pay for easements for permanent structures or <br /> permanent changes in existing facilities . If CON- 2 . other data, interpretations, opinions, and <br /> TRACTOR and OWNER are unable to agree on entitle- information contained in such reports or shown or <br /> ment to or on the amount or extent, if any, of any adjust- indicated in such drawings ; or <br /> ment in the Contract Price or Contract Times, or both, as a <br /> IRC OPERATIONS COMPLEX 00700 - Standard General Conditions of the Construction Contract <br /> 00700 - 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.