My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-033
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2016 2:00:33 PM
Creation date
9/30/2015 7:40:41 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
01/18/2005
Control Number
2005-033
Agenda Item Number
11.J.1
Entity Name
Summit Construction
Subject
Utilities Operations Complex Change Order No. 1
Area
Operations Complex
Project Number
6037
Bid Number
7026
Archived Roll/Disk#
4000
Supplemental fields
SmeadsoftID
3869
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
746
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 . any CONTRACTOR interpretation of or performance of the Work; subject, however, to the <br /> conclusion drawn from any "technical data " or any following : <br /> such other data, interpretations , opinions, or infor- <br /> mation. a. such condition must meet any one or <br /> more of the categories described in paragraph <br /> New Paragraphs 4 .02 .C, 4 .02 .1), and 4 .02 .E have been 4 . 03 .A ; and <br /> added. See the Supplementary Conditions. <br /> b . with respect to Work that is paid for on a <br /> 4 . 03 Differing Subsurface or Physical Conditions Unit Price Basis, any adjustment in Contract <br /> Price will be subject to the provisions of para- <br /> A. Notice: If CONTRACTOR believes that any graphs 9 . 08 and 11 . 03 . <br /> subsurface or physical condition at or contiguous to the Site <br /> that is uncovered or revealed either: 2 . CONTRACTOR shall not be entitled to <br /> any adjustment in the Contract Price or Contract <br /> 1 . is of such a nature as to establish that any Times if: <br /> "technical data" on which CONTRACTOR is <br /> entitled to rely as provided in paragraph 4 . 02 is a. CONTRACTOR knew of the existence <br /> materially inaccurate ; or of such conditions at the time CONTRACTOR <br /> made a final commitment to OWNER in respect <br /> 2 . is of such a nature as to require a change of Contract Price and Contract Times by the <br /> in the Contract Documents ; or submission of a Bid or becoming bound under a <br /> negotiated contract; or <br /> 3 . differs materially from that shown or <br /> indicated in the Contract Documents ; or b. the existence of such condition could <br /> reasonably have been discovered or revealed as a <br /> 4. is of an unusual nature, and differs result of any examination, investigation, explo- <br /> materially from conditions ordinarily encountered ration, test, or study of the Site and contiguous <br /> • and generally recognized as inherent in work of the areas required by the Bidding Requirements or <br /> character provided for in the Contract Documents ; Contract Documents to be conducted by or for <br /> CONTRACTOR prior to CONTRACTOR's <br /> then CONTRACTOR shall, promptly after becoming aware making such final commitment; or <br /> thereof and before further disturbing the subsurface or <br /> physical conditions or performing any Work in connection c . CONTRACTOR failed to give the <br /> therewith (except in an emergency as required by paragraph written notice within the time and as required by <br /> 6 . 16.A), notify OWNER and ENGINEER in writing about paragraph 4 . 03 .A. <br /> such condition. CONTRACTOR shall not further disturb <br /> such condition or perform any Work in connection Part of the second sentence of Paragraph 4.03 .C3 has <br /> therewith (except as aforesaid) until receipt of written order been deleted. <br /> to do so . 3 . If OWNER and CONTRACTOR are <br /> unable to agree on entitlement to or on the amount <br /> B . ENGINEER 's Review: After receipt of written or extent, if any, of any adjustment in the Contract <br /> notice as required by paragraph 4 . 03 .A, ENGINEER will Price or Contract Times, or both, a Claim may be <br /> promptly review the pertinent condition, determine the made therefor as provided in paragraph 10. <br />05 . <br /> necessity of OWNER's obtaining additional exploration or However, OWNER, ENGINEER, and <br /> tests with respect thereto, and advise OWNER in writing ENGINEER' s Consultants shall not be liable <br />to <br /> (with a copy to CONTRACTOR) of ENGINEER ' s findings CONTRACTOR for any claims, costs, losses, or <br /> and conclusions . damages (including but not limited to all fees and <br /> charges of engineers, architects, attorneys, and other <br /> C. Possible Price and Times Adjustments professionals and all court or <br /> ar-bitFatien or- <br /> dispute resolution costs) sustained by <br /> 1 . The Contract Price or the Contract CONTRACTOR on or in connection with any other <br /> Times, or both, will be equitably adjusted to the project or anticipated project. <br /> extent that the existence of such differing subsurface <br /> • or physical condition causes an increase or decrease <br /> in CONTRACTOR' s cost of, or time required for, <br /> IRC OPERATIONS COMPLEX 00700 - Standard General Conditions of the Construction Contract <br /> 00700 - 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.