Official Document Type
Change Order
Approved Date
01/18/2005
Control Number
2005-033
Agenda Item Number
11.J.1
Entity Name
Summit Construction
Subject
Utilities Operations Complex Change Order No. 1
Area
Operations Complex
Project Number
6037
Bid Number
7026
Archived Roll/Disk#
4000
Supplemental fields
SmeadsoftID
3869
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
746
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 . 04 Underground Facilities 2 . If ENGINEER concludes that a change in <br /> the Contract Documents is required, a Work Change <br /> A . Shown or Indicated: The information and data Directive or a Change Order will be issued to reflect <br /> shown or indicated in the Contract Documents with respect and document such consequences . An equitable <br /> to existing Underground Facilities at or contiguous to the adjustment shall be made in the Contract Price <br /> or <br /> Site is based on information and data famished to OWNER Contract Times, or both, to the extent that they are <br /> or ENGINEER by the owners of such Underground Facili- attributable to the existence or location of <br />any <br /> ties, including OWNER, or by others . Unless it is otherwise Underground Facility that was not shown or <br /> expressly provided in the Supplementary Conditions : indicated or not shown or indicated with reasonable <br /> accuracy in the Contract Documents and that <br /> 1 . OWNER and ENGINEER shall not be CONTRACTOR did not know of and could not <br /> responsible for the accuracy or completeness of any reasonably have been expected to be aware of or to <br /> such information or data; and have anticipated. If OWNER and CONTRACTOR <br /> are unable to agree on entitlement to or on the <br /> 2 . the cost of all of the following will be amount or extent, if any, of any such adjustment in <br /> included in the Contract Price, and CONTRACTOR Contract Price or Contract Times , OWNER or <br /> shall have full responsibility for: CONTRACTOR may make a Claim therefor as <br /> provided in paragraph 10 . 05 . <br /> a. reviewing and checking all such informa- <br /> tion and data, 4 . 05 Reference Points <br /> b . locating all Underground Facilities A. OWNER shall provide engineering surveys to <br /> shown or indicated in the Contract Documents, establish reference points for construction which in <br /> ENGINEER' s judgment are necessary to enable CON- <br /> c . coordination of the Work with the TRACTOR to proceed with the Work. CONTRACTOR <br /> owners of such Underground Facilities, shall be responsible for laying out the Work, shall protect <br /> including OWNER, during construction, and and preserve the established reference points and property <br /> • monuments, and shall make no changes or relocations <br /> d. the safety and protection of all such without the prior written approval of OWNER. <br /> Underground Facilities and repairing any CONTRACTOR shall report to ENGINEER whenever any <br /> damage thereto resulting from the Work. reference point or property monument is lost or destroyed or <br /> requires relocation because of necessary changes in grades <br /> B . Not Shown or Indicated or locations, and shall be responsible for the accurate <br /> replacement or relocation of such reference points or <br /> 1 . If an Underground Facility is uncovered property monuments by professionally qualified personnel. <br /> or revealed at or contiguous to the Site which was <br /> not shown or indicated, or not shown or indicated 4 . 06 Hazardous Environmental Condition at Site <br /> with reasonable accuracy in the Contract <br /> Documents, CONTRACTOR shall, promptly after A. Reports and Drawings: Reference is made to the <br /> becoming aware thereof and before further Supplementary Conditions for the identification of those <br /> disturbing conditions affected thereby or performing reports and drawings relating to a Hazardous Environmental <br /> any Work in connection therewith (except in an Condition identified at the Site, if any, that <br />have been <br /> emergency as required by paragraph 6. 16 .A), utilized by the ENGINEER in the preparation of the <br /> identify the owner of such Underground Facility and Contract Documents. <br /> give written notice to that owner and to OWNER <br /> and ENGINEER. ENGINEER will promptly review B . Limited Reliance by CONTRACTOR on Technical <br /> the Underground Facility and determine the extent, Data Authorized: CONTRACTOR may rely upon the <br /> if any, to which a change is required in the Contract general accuracy of the "technical data" contained in such <br /> Documents to reflect and document the reports and drawings, but such reports and drawings are not <br /> consequences of the existence or location of the Contract Documents. Such "technical data" is identified in <br /> Underground Facility. During such time, the Supplementary Conditions . Except for such reliance on <br /> CONTRACTOR shall be responsible for the safety such "technical data, " CONTRACTOR may not rely upon <br /> and protection of such Underground Facility. or make any Claim against OWNER, ENGINEER or any of <br /> • ENGINEER' s Consultants with respect to : <br /> IRC OPERATIONS COMPLEX 00700 - Standard General Conditions of the Construction Contract <br /> 00700 - 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.