My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-033
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2016 2:00:33 PM
Creation date
9/30/2015 7:40:41 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
01/18/2005
Control Number
2005-033
Agenda Item Number
11.J.1
Entity Name
Summit Construction
Subject
Utilities Operations Complex Change Order No. 1
Area
Operations Complex
Project Number
6037
Bid Number
7026
Archived Roll/Disk#
4000
Supplemental fields
SmeadsoftID
3869
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
746
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 . 05 Substitutes and "Or-Equals " <br /> b . CONTRACTOR shall submit sufficient <br /> Paragraph 6.05 .A has been deleted and replaced with a information as provided below to allow ENGI- <br /> new paragraph. See the Supplementary Conditions. NEER to determine that the item of material or <br /> A. A4-ie ever- an item of -nate^ ^ ' meet is equipment proposed is essentially equivalent to <br /> speeified or ae^ ^^'""a in the Gontr et Documents by using that named and an acceptable substitute therefor. <br /> the name f ^ tee", item ^r- the mme of ^ paAieu ^ r Requests for review of proposed substitute items <br /> Sayer,— the speei eatr or- description is ntended. to. of material or equipment will not be accepted by <br /> establish the—type, f notion, appearanee—and qua ty ENGINEER from anyone other than CON- <br /> TRACTOR. <br /> is followed by words reading that no Viequivalent, va <br /> al" :toor- ne ubstit. .tiis mi tto,l other-:to„is c . The procedure for review by ENGI- <br /> f rnaterial eF equipment or ,,,^ tonal , eqt4ment of „tl er NEER will be as set forth in paragraph <br /> Suppliers be ^. ,bfnitted to >~,.1r<n rl: E for 1". .: ".. . 6. 05 .A .2 . d, as supplemented in the General <br /> 7111 Y, <br /> Baer the ^ mst^nrue^ deser-ibed belew. Requirements and as ENGINEER may decide is <br /> appropriate under the circumstances . <br /> 1 . "Or-Equal " Items: If in ENGINEER ' s <br /> sole discretion an item of material or equipment pro- d. CONTRACTOR shall fust make written <br /> posed by CONTRACTOR is functionally equal to application to ENGINEER for review of a <br /> that named and sufficiently similar so that no change proposed substitute item of material or <br /> in related Work will be required, it may be con- equipment that CONTRACTOR seeks to firnish <br /> sidered by ENGINEER as an "or-equal" item, in or use . The application shall certify that the <br /> which case review and approval of the proposed proposed substitute item will perform adequately <br /> item may, in ENGINEER' s sole discretion, be the functions and achieve the results called <br />for <br /> accomplished without compliance with some or all by the general design, be similar in substance to <br /> of the requirements for approval of proposed substi- that specified, and be suited to the same use as <br /> tute items . For the purposes of this paragraph that specified. The application will state the <br /> • 6. 05 .A. 1 , a proposed item of material or equipment extent, if any, to which the use of the proposed <br /> will be considered functionally equal to an item so substitute item will prejudice CONTRACTOR ' s <br /> named if. achievement of Substantial Completion on time, <br /> whether or not use of the proposed substitute <br /> Sentence 6.05.A. 1 .a.(ii) has been deleted and replaced item in the Work will require a change in any of <br /> with a new sentence. See the Supplementary the Contract Documents (or in the provisions of <br /> Conditions. any other direct contract with OWNER for work <br /> a. in the exercise of reasonable judgment on the Project) to adapt the design to the <br /> ENGINEER determines that: (i) it is at least proposed substitute item and whether or not <br /> equal in quality, durability, appearance, strength, incorporation or use of the proposed substitute <br /> and design characteristics ; (ii) it •• �'�-.liably item in connection with the Work is subject to <br /> peFferni at —least equally well the Ametien payment of any license fee or royalty. All <br /> fti3posed by the design ^ ept of the ^ n3pletea variations of the proposed substitute item from <br /> Pr-ejeet ^ a fimeti ,.., :.. ,. whole, and-, <br /> that specified will be identified in the applica- <br /> tion, and available engineering, sales, <br /> b . CONTRACTOR certifies that: (i) there is maintenance, repair, and replacement services <br /> no increase in cost to the OWNER; and (ii) it will be indicated. The application will also <br /> will conform substantially, even with deviations, contain an itemized estimate of all costs or <br /> to the detailed requirements of the item named in credits that will result directly or indirectly from <br /> the Contract Documents. use of such substitute item, including costs of <br /> redesign and claims of other contractors affected <br /> 2 . Substitute Items by any resulting change, all of which will be <br /> considered by ENGINEER in evaluating the <br /> a. If in ENGINEER ' s sole discretion an proposed substitute item. ENGINEER may <br /> item of material or equipment proposed by require CONTRACTOR to furnish additional <br /> CONTRACTOR does not qualify as an data about the proposed substitute item <br /> "or-equal" item under paragraph 6 . 05 .A. 1 , it will <br /> be considered a proposed substitute item. <br /> IRC OPERATIONS COMPLEX 00700 - Standard General Conditions of the Construction Contract <br /> 00700 -21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.