My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-033
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2016 2:00:33 PM
Creation date
9/30/2015 7:40:41 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
01/18/2005
Control Number
2005-033
Agenda Item Number
11.J.1
Entity Name
Summit Construction
Subject
Utilities Operations Complex Change Order No. 1
Area
Operations Complex
Project Number
6037
Bid Number
7026
Archived Roll/Disk#
4000
Supplemental fields
SmeadsoftID
3869
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
746
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTRACTOR. Delays attributable to and within the <br /> • d. ne fee ^tea" be payableen the bas control of a Subcontractor or Supplier shall be deemed to be <br /> rests—itemized- under paragFapks 11 . 01 .A-4, delays within the control of CONTRACTOR. <br /> i t nl n and 11 . 01 .13 ; <br /> 12 . 05 Delays Beyond OWNER 's and CONTRACTOR 's <br /> e . the amount of ,._edit to be ^ ll , wed h. , Control <br /> GONTR n GTnn to 0AALPk >~n for- ^ ehange <br /> .. .h;^h r-esuhs in a net deer-ease in east •• ^ ll hA. Where CONTRACTOR is prevented from <br /> amount of the aotu ' net deer-ease in eest pl, ^ completing any part of the Work within the Contract Times <br /> dedeetien in CO TT'D ^��'sfee by an (or Milestones) due to delay beyond the control of both <br /> ameupA equal to five—peFeent of sacs—net OWNER and CONTRACTOR, an extension of the <br /> deer-ease ; an Contract Times (or Milestones) in an amount equal to the <br /> time lost due to such delay shall be CONTRACTOR's sole <br /> f •• he^ both addition" and ^'edit°' and exclusive remedy for such delay. <br /> veered in any one-ehange two ^ d:• • st.,,e..t <br /> CONTRACTOR's CTOR's c e shall be ,.,.." muted e +ho 12 . 06 Delay Damages <br /> basis ..f the ., et eh . nge : aeeer-danee ,. ,;th p <br /> gFa* T2 . 01 . Gzt . a thfough Paragraphs 12 .06.A and 12 .06 B have been deleted and <br /> sive: replaced with a new paragraph. See the Supplementary <br /> Conditions. <br /> 12 . 02 Change of Contract Times A. In no event shall 03X:n >~vor- ENGPrEER be. <br /> liable to CONTRACTOR, any Subcontraeter-, any Supp! <br /> A. The Contract Times (or Milestones) may only be er-� any other. . ^ tia - to ^ sufety for- <br /> changed by a Change Order or by a Written Amendment. employeeor- agent ,.f any of the, f . damage" afising • .t <br /> Any Claim for an adjustment in the Contract Times (or of or resulting � <br /> Milestones) shall be based on written notice submitted by <br /> the party making the claim to the ENGINEER and the other 1 . delays eaffl.ised by o .: th;-• the ^ .,t,.„t ,.f <br /> • party to the Contract in accordance with the provisions of CONT-n A CTnn . <br /> paragraph 10. 05 . <br /> 2 . delays beyendthe ee troll of be <br /> B . Any adjustment of the Contract Times (or OWNED and GQT`P:v A GTnn incl • d;.. ,. but t <br /> Milestones) covered by a Change Order or of any Claim for lftiited to fires, floods , epidemies, <br /> aboafmal weather.- <br /> an adjustment in the Contract Times (or Milestones) will be eenditiens, is of godor- ^t^ , egleet by . ,til ;t. , <br /> determined in accordance with the provisions of this <br /> Article 12 . as eontemplated by A .+; .. le 7 .- <br /> 12 . 03 Delays Beyond CONTRACTOR 's Control B . Nediing in this paragraph 12 . 06 bar-s a ehange in <br /> A. Where CONTRACTOR is prevented from , or- dismpti <br /> completing any part of the Work within the Contract Times di-eethy attributable to " ,etionsor- "tiem ,.f nIx7ATCD <br /> Aff- <br /> (or Milestones) due to delay beyond the control of anyone for- whom OAIn rD : responsible-. <br /> CONTRACTOR, the Contract Times (or Milestones) will <br /> be extended in an amount equal to the time lost due to such <br /> delay if a Claim is made therefor as provided in paragraph ARTICLE 13 - TESTS AND INSPECTIONS ; <br /> 12 .02 .A. Delays beyond the control of CONTRACTOR CORRECTION, REMOVAL OR ACCEPTANCE OF <br /> shall include, but not be limited to, acts or neglect by DEFECTIVE WORK <br /> OWNER, acts or neglect of utility owners or other <br /> contractors performing other work as contemplated by <br /> Article 7, fires, floods, epidemics, abnormal weather 13 . 01 Notice of Defects <br /> conditions, or acts of God. <br /> A. Prompt notice of all defective Work of which <br /> 12 . 04 Delays Within CONTRACTOR 's Control OWNER or ENGINEER has actual knowledge will be <br /> given to CONTRACTOR. All defective Work may be <br /> A. The Contract Times (or Milestones) will not be rejected, corrected, or accepted as provided in this <br /> * extended due to delays within the control of Article 13 . <br /> IRC OPERATIONS COMPLEX 00700 - Standard General Conditions of the Construction Contract <br /> 00700 -36 <br />