prior to CONTRACTOR ' s purchase thereof for
<br /> 013 . 02 Access to Work incorporation in the Work. Such inspections, tests, or
<br /> approvals shall be performed by organizations acceptable to
<br /> A. OWNER, ENGINEER, ENGINEER' s Con- OWNER and ENGINEER.
<br /> sultants, other representatives and personnel of OWNER,
<br /> independent testing laboratories, and governmental agencies E . If any Work (or the work of others) that is to be
<br /> with jurisdictional interests will have access to the Site and inspected, tested, or approved is covered by CONTRAC-
<br /> the Work at reasonable times for their observation, TOR without written concurrence of ENGINEER, it must,
<br /> inspecting, and testing. CONTRACTOR shall provide if requested by ENGINEER, be uncovered for observation.
<br /> them proper and safe conditions for such access and advise
<br /> them of CONTRACTOR' s Site safety procedures and F. Uncovering Work as provided in paragraph
<br /> programs so that they may comply therewith as applicable. 13 . 03 .E shall be at CONTRACTOR 's expense unless CON-
<br /> TRACTOR has given ENGINEER timely notice of
<br /> 13 . 03 Tests and Inspections CONTRACTOR ' s intention to cover the same and ENGI-
<br /> NEER has not acted with reasonable promptness in
<br /> A. CONTRACTOR shall give ENGINEER timely response to such notice .
<br /> notice of readiness of the Work for all required inspections,
<br /> tests, or approvals and shall cooperate with inspection and A new Paragraph 13.03 .G has been added. See the
<br /> testing personnel to facilitate required inspections or tests . Supplementary Conditions.
<br /> Paragraph 13 .03 .B has been deleted and replaced with a 13 . 04 Uncovering Work
<br /> new paragraph. See the Supplementary Conditions.
<br /> B . OIAL .Mn shall ^... ley and pay for- the senrie ^F A. If any Work is covered contrary to the
<br /> written
<br /> II1SZ11l1YrlY(111Y1
<br /> testing late ate , to ^ f fm all • eti ^ n, request of ENGINEER, it must, if requested by ENGI-
<br /> tests, er approvals required by the r,,..tFae« Deou..•o„«s NEER, be uncovered for ENGINEER' s observation
<br /> and
<br /> e replaced at CONTRACTOR' s expense .
<br /> • Q= ., ^ paragraphs i � 03 G and i � 03 D below-,
<br /> for- inspeetiefis, tests, er appf-e ,�als Parts of the last two sentences of paragraph 13 .04.B
<br /> c^ . Y� w, have been deleted.
<br /> B . If ENGINEER considers it necessary or advisable
<br /> 2 . that costs ineuffed in eemeetien jAith that covered Work be observed by ENGINEER or inspect-
<br /> ed or tested by others, CONTRACTOR, at ENGINEER 's
<br /> 13 04 n shall be paid as pr-^• 4a ^-' in said par-agF p request, shall uncover, expose, or otherwise make available
<br /> 3 . 0for observation, inspection, or testing as ENGINEER may
<br /> require, that portion of the Work in question, furnishing all
<br /> 3 . as ethef3A4se speeifieally ^ < .; a°a in necessary labor, material, and equipment. If it is found that
<br /> such Work is defective, CONTRACTOR shall pay all
<br /> Claims, costs, losses, and damages (including but not
<br /> limited to all fees and charges of engineers, architects,
<br /> Paragraph 13 .03.0 has been deleted in its entirety. attorneys, and other professionals and all court or arbitration
<br /> —C. If Laws or- Regulationswi-y ;wed zing or other dispute resolution costs) arising out of or relating to
<br /> ju:asdietien require any WedE (^ art the ^f e :s wall such uncovering,g exposure, observation, inspection, and
<br /> «^ be in eeted tested, appr-oved by .,... levee ^ ^«we. testing, and of satisfactory replacement or reconstruction
<br /> {V VY 311J�lYYLY CS, ^
<br /> �l body, GQThPq ^ C2 T Q sh (including but not limited to all costs of repair. Y;,re..e....,.. . � :,� such ',
<br /> ep it or
<br /> replacement of work of others); and OWNER shall be
<br /> . • •..rYYava6, wuw, v
<br /> als, pay all eests : eetien entitled to an appropriate decrease in the Contract Price . If
<br /> ..aere�h4h, and fi • the parties are unable to agree as to the amount thereof,
<br /> ef inspection or appr-eval. OWNER may make a Claim therefor as provided in
<br /> paragraph 10. 05 . If, however, such Work is not found to be
<br /> D . CONTRACTOR shall be responsible for defective, CONTRACTOR shall be allowed--an-in�
<br /> arranging and obtaining and shall pay all costs in connection the r,^..« aet Dri ^e ^_ an extension of the Contract Times (or
<br /> with any inspections, tests, or approvals required for Milestones) , or—bot , directly attributable to such
<br /> OWNER 's and ENGINEER 's acceptance of materials or uncovering, exposure, observation, inspection, testing,
<br /> . equipment to be incorporated in the Work; or acceptance of replacement, and reconstruction. If the parties are unable to
<br /> materials, mix designs, or equipment submitted for approval
<br /> IRC OPERATIONS COMPLEX 00700 - Standard General Conditions of the Construction Contract
<br /> 00700 -37
<br />
|