Laserfiche WebLink
prior to CONTRACTOR ' s purchase thereof for <br /> 013 . 02 Access to Work incorporation in the Work. Such inspections, tests, or <br /> approvals shall be performed by organizations acceptable to <br /> A. OWNER, ENGINEER, ENGINEER' s Con- OWNER and ENGINEER. <br /> sultants, other representatives and personnel of OWNER, <br /> independent testing laboratories, and governmental agencies E . If any Work (or the work of others) that is to be <br /> with jurisdictional interests will have access to the Site and inspected, tested, or approved is covered by CONTRAC- <br /> the Work at reasonable times for their observation, TOR without written concurrence of ENGINEER, it must, <br /> inspecting, and testing. CONTRACTOR shall provide if requested by ENGINEER, be uncovered for observation. <br /> them proper and safe conditions for such access and advise <br /> them of CONTRACTOR' s Site safety procedures and F. Uncovering Work as provided in paragraph <br /> programs so that they may comply therewith as applicable. 13 . 03 .E shall be at CONTRACTOR 's expense unless CON- <br /> TRACTOR has given ENGINEER timely notice of <br /> 13 . 03 Tests and Inspections CONTRACTOR ' s intention to cover the same and ENGI- <br /> NEER has not acted with reasonable promptness in <br /> A. CONTRACTOR shall give ENGINEER timely response to such notice . <br /> notice of readiness of the Work for all required inspections, <br /> tests, or approvals and shall cooperate with inspection and A new Paragraph 13.03 .G has been added. See the <br /> testing personnel to facilitate required inspections or tests . Supplementary Conditions. <br /> Paragraph 13 .03 .B has been deleted and replaced with a 13 . 04 Uncovering Work <br /> new paragraph. See the Supplementary Conditions. <br /> B . OIAL .Mn shall ^... ley and pay for- the senrie ^F A. If any Work is covered contrary to the <br /> written <br /> II1SZ11l1YrlY(111Y1 <br /> testing late ate , to ^ f fm all • eti ^ n, request of ENGINEER, it must, if requested by ENGI- <br /> tests, er approvals required by the r,,..tFae« Deou..•o„«s NEER, be uncovered for ENGINEER' s observation <br /> and <br /> e replaced at CONTRACTOR' s expense . <br /> • Q= ., ^ paragraphs i � 03 G and i � 03 D below-, <br /> for- inspeetiefis, tests, er appf-e ,�als Parts of the last two sentences of paragraph 13 .04.B <br /> c^ . Y� w, have been deleted. <br /> B . If ENGINEER considers it necessary or advisable <br /> 2 . that costs ineuffed in eemeetien jAith that covered Work be observed by ENGINEER or inspect- <br /> ed or tested by others, CONTRACTOR, at ENGINEER 's <br /> 13 04 n shall be paid as pr-^• 4a ^-' in said par-agF p request, shall uncover, expose, or otherwise make available <br /> 3 . 0for observation, inspection, or testing as ENGINEER may <br /> require, that portion of the Work in question, furnishing all <br /> 3 . as ethef3A4se speeifieally ^ < .; a°a in necessary labor, material, and equipment. If it is found that <br /> such Work is defective, CONTRACTOR shall pay all <br /> Claims, costs, losses, and damages (including but not <br /> limited to all fees and charges of engineers, architects, <br /> Paragraph 13 .03.0 has been deleted in its entirety. attorneys, and other professionals and all court or arbitration <br /> —C. If Laws or- Regulationswi-y ;wed zing or other dispute resolution costs) arising out of or relating to <br /> ju:asdietien require any WedE (^ art the ^f e :s wall such uncovering,g exposure, observation, inspection, and <br /> «^ be in eeted tested, appr-oved by .,... levee ^ ^«we. testing, and of satisfactory replacement or reconstruction <br /> {V VY 311J�lYYLY CS, ^ <br /> �l body, GQThPq ^ C2 T Q sh (including but not limited to all costs of repair. Y;,re..e....,.. . � :,� such ', <br /> ep it or <br /> replacement of work of others); and OWNER shall be <br /> . • •..rYYava6, wuw, v <br /> als, pay all eests : eetien entitled to an appropriate decrease in the Contract Price . If <br /> ..aere�h4h, and fi • the parties are unable to agree as to the amount thereof, <br /> ef inspection or appr-eval. OWNER may make a Claim therefor as provided in <br /> paragraph 10. 05 . If, however, such Work is not found to be <br /> D . CONTRACTOR shall be responsible for defective, CONTRACTOR shall be allowed--an-in� <br /> arranging and obtaining and shall pay all costs in connection the r,^..« aet Dri ^e ^_ an extension of the Contract Times (or <br /> with any inspections, tests, or approvals required for Milestones) , or—bot , directly attributable to such <br /> OWNER 's and ENGINEER 's acceptance of materials or uncovering, exposure, observation, inspection, testing, <br /> . equipment to be incorporated in the Work; or acceptance of replacement, and reconstruction. If the parties are unable to <br /> materials, mix designs, or equipment submitted for approval <br /> IRC OPERATIONS COMPLEX 00700 - Standard General Conditions of the Construction Contract <br /> 00700 -37 <br />