My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-033
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2016 2:00:33 PM
Creation date
9/30/2015 7:40:41 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
01/18/2005
Control Number
2005-033
Agenda Item Number
11.J.1
Entity Name
Summit Construction
Subject
Utilities Operations Complex Change Order No. 1
Area
Operations Complex
Project Number
6037
Bid Number
7026
Archived Roll/Disk#
4000
Supplemental fields
SmeadsoftID
3869
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
746
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rNPRODUCT VISYSTEM SPECIFICATIONS <br /> Product Specification <br /> Product Ref : ConCore® Panel 24 with PosiLockTM Understructure <br /> • 1 . 6 Submittals (b) Field Measurements : Verify actual locations of <br /> (a) Detail sheets , for each proposed product type , walls , columns and other constructions contiguous with <br /> wt rich provide the necessary information to describe the access flooring by field measurements before <br /> product and its performance . fabrication and indicate measurements on shop <br /> (b) Shop Drawings : drawings . <br /> 1 Corrrplete layout of access flooring based on (c) Jobsite Conditions : Contractor shall provide <br /> clear <br /> field - verified dimensional relationships to adjoining work access , dry storage and a clean subfloor area, which is <br /> and installation tolerances . free of construction debris and other trades prior to and <br /> 2 . Details with descriptive notes indicating materials , during installation of the access floor system . <br /> finis) yes , fasteners , typical and special edge conditions , • 1 . 9 Coordination <br /> accessories , understructure , and other data to permit a <br /> (a) Concrete sealer or curing agent specified in Division <br /> full evaluation of entire access flooring system . <br /> 3 must be compatible with pedestal adhesive in spaces <br /> • 1 .7 Quality Assurance where access flooring is located . <br /> (a) Source limitations : Obtain access flooring through (b) Where the plenum beneath the access floor is <br /> one source from a single manufacturer who has a designed to deliver conditioned air: All trades which <br /> minimum of five (5) years experience in the manufacture work within the plenum cavity below the access floor <br /> and distribution of access floor systems and can shall be responsible for maintaining the plenum <br /> seal _ <br /> . demonstrate that they have completed projects of like integrity. - r <br /> scope and size . Any alternate products shall meet or <br /> exceed the requirements outlined herein and must have (c) Mark pedestal locations on subfioor by use of a grid <br /> -rior written approval by the architect . (with a module equal to the width of five floor panels in <br /> (b) CISCA (Ceilings and Interior Systems Construction both directions) to enable mechanical and electrical work <br /> Association) - "Recommended Test Procedures for <br /> to proceed without interfering with access flooring <br /> Access Floors " shall be used as a guideline when pedestals . Pedestal locations shall be established <br /> from <br /> presenting load performance product information . contract drawings or approved shop drawings . <br /> (c) NFPA Standards : Provide access flooring and (d) Coordinate location of mechanical and electrical <br /> accessories complying with NFPA 75 and NFPA 90A work in underfloor cavity to prevent interference with <br /> requirements for raised flooring and related systems . access floor system pedestals . <br /> (d) Provide floor panels that are clearly and permanently (e) Proceed with installation only after completion of <br /> 4 : � f other construction within affected spaces . No dust or <br /> marked with panel type and load rating . p <br /> (e) Preinstallation Conference: Conduct conference at debris producing operations by other trades will be <br /> Project site to comply with requirements in Division 1 allowed in areas where access floor is being installed <br />. <br /> Section "project Management and Coordination . " (f) Traffic shall not be permitted on any floor area for 24 <br /> 1 .8 Project Conditions hours after installation to allow pedestal adhesive to set . <br /> • <br /> (a) Environmental Limitations : Do not install access <br /> flooring until spaces are enclosed , ambient temperature <br /> is between- 50° and 90°F and relative humidity is <br /> 20 to 70°x . Access floor must be stored in this <br /> environment at least 24 hours before the installation <br /> begins . <br /> TaW <br /> ACCESS FLOORS <br /> / o2Zo - � <br />
The URL can be used to link to this page
Your browser does not support the video tag.