My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-395a
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-395a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2016 1:52:09 PM
Creation date
9/30/2015 9:28:16 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
12/06/2005
Control Number
2005-395A
Agenda Item Number
11.J.1
Entity Name
Summit Construction
Subject
Change Order Utilities Operations Complex
Area
4355 41st. St.
Project Number
6037
Supplemental fields
SmeadsoftID
5303
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAO" <br /> Summit Construction Management, Inc . CGIC0588415 <br /> 3200 43" Ave. suite 11 , Vero Beach, F1 , 32960 <br /> PROPOSAL TO , Indian River County Utilities <br /> PROJECT NAME , Administration Complex <br /> PROJECT ADDRESS . 4355 41s' St <br /> PROPOSAL DATE . October 26 , 2005 <br /> The scope of this proposal will include the following : <br /> Provide and install Master Wastewater Sanitary Sewer System per plans and specifications <br /> prepared by Carter and Associates dated Sept . 20 , 2005 (date stamped on front page, issuance <br /> date) . Includes lift station, odor control , generator and accessories, force main and restoration as <br /> indicated . The lift station and generator have a very long lead time ; 10 - 12 weeks after approved <br /> submittal . <br /> Delays in production/shipment of items such as PVC piping, lift station liner, generator could <br /> possibly extend this time frame even further than the added sixty days . Expedition of this change <br /> order will be critical to our being able to stay within this time schedule . This work will effect the <br /> certificate of occupancy of the current Administration Complex as well as the IRC Annex Facility , <br /> so time is of the essence . <br /> This proposal and its time frame are valid for 20 days from this date <br /> Summit Construction Management, Inc . will provide the above scope of work for a total <br /> proposed cost of. <br /> TOTAL PROPOSAL COST : $ 692 ,082 .49 <br /> Phoue (561) 794-2099 Fax (560 794-2097 <br />
The URL can be used to link to this page
Your browser does not support the video tag.