Laserfiche WebLink
R <br /> IRCU Waste Water Proiect <br /> Desciption Cost <br /> Surveying/Asbuilts 3 . 200 .00 <br /> Testing 4 , 250 . 00 <br /> Concrete 7 ,500 . 00 <br /> Bollards 11000. 00 <br /> Grading 4, 800 .00 <br /> Sod 191650 .00 <br /> Gas Detector 21850. 00 <br /> Flo Meter 13,800. 00 <br /> Odor Control 319000. 00 <br /> Vault 71900. 00 <br /> Lift Station 1999325. 00 <br /> 10" Force Main 98,375.00 <br /> Tapping Sleeve 61450. 00 <br /> Gate Valves-2 Fro 3, 550. 00 <br /> Air Release 3, 545 . 00 <br /> 8" Fonar Main 26, 100. 00 <br /> Misc Fittings , etc 99550.00 <br /> MOT 19,900.00 <br /> Electric including generator/accessories 1371500 .00 <br /> Subtotal 600 , 245 . 00 <br /> GC Bond 12 , 004. 90 <br /> Sub Total 612 ,249 . 90 <br /> Contractors Fee 91 , 837 .49 <br /> Total 692 , 082.49 <br />