Laserfiche WebLink
' 1 . 02 Terminology spe^: aea leeation) ready r~ , installation an <br /> in usable or- epeffable eenditien-. <br /> A. Intent of Certain Terms or Adjectives <br /> ' 2 . Thal, A. ."~ate—whenusedine ec <br /> 1 . Whenever in the Contract Documents the tien with services, materials,OF equipfflent,,^hal <br /> terms "as allowed, " "as approved, " or terms of like mean to put ipAe aer- plaee in final position <br /> said. <br /> ' effect or import are used, or the adjectives "reasonable," senriees, materials, or equipment eemplete—and <br /> "suitable," "acceptable," "proper," "satisfactory, " or Feady for- rote de use <br /> adjectives of like effect or import are used to describe <br /> ' an action or determination of ENGINEER as to the 3 . 'lkeiver-d .,s--per€erg "provide," .. .tee„ <br /> Work, it is intended that such action or determination used inneemeetion=o. hserviees, materials , or- <br /> will <br /> rwill be solely to evaluate, in general, the completed equipmepA, <br /> shall mean to fimaish and 4istall said. <br /> Work for compliance with the requirements of and iterials or equipmerA complete and read <br /> ' information in the Contract Documents and confor- for- intended <br /> mance with the design concept of the completed Project <br /> as a functioning whole as shown or indicated in the Paragraph DA has been deleted in its entirety. <br /> ' Contract Documents (unless there is a specific statement " " " " "pro <br /> indicating otherwise) . The use of any such term or vide" is in eenneetion 3Aith serviees, <br /> adjective shall not be effective to assign to ENGINEER materials, OF equipment i a erAex4 cleady r- i <br /> G' i^ <br /> any duty or authority to supervise or direct the an obligation of Gn ^ GTnn '!lme ide <br /> is <br /> ' performance of the Work or any duty or authority to inViied. <br /> undertake responsibility contrary to the provisions of <br /> paragraph 9 . 10 or any other provision of the Contract E. Unless stated otherwise in the Contract Docu- <br /> ' Documents. ments, words or phrases which have a well-known technical <br /> or construction industry or trade meaning are used in the <br /> B . Day Contract Documents in accordance with such recognized <br /> meaning. <br /> ' 1 . The word "day" shall constitute a <br /> calendar day of 24 hours measured from midnight to <br /> the next midnight. ARTICLE 2 - PRELIMINARY MATTERS <br /> ' C. Defective <br /> 2 .01 Delivery of Bonds <br /> 1 . The word "defective," when modifying <br /> ' the word "Work," refers to Work that is A. When CONTRACTOR delivers the executed <br /> unsatisfactory, faulty, or deficient in that it does not Agreements to OWNER, CONTRACTOR shall also deliver <br /> conform to the Contract Documents or does not to OWNER such Bonds as CONTRACTOR may be <br /> ' meet the requirements of any inspection, reference required to fiu-nish. <br /> standard, test, or approval referred to in the Contract <br /> Documents, or has been damaged prior to 2 . 02 Copies of Documents <br /> ' ENGINEER's recommendation of final payment <br /> (unless responsibility for the protection thereof has A. OWNER shall furnish to CONTRACTOR up to <br /> been assumed by OWNER at Substantial ten copies of the Contract Documents. Additional copies <br /> Completion in accordance with paragraph 14 .04 or will be famished upon request at the cost of reproduction. <br /> 14 .05). <br /> 2 . 03 Commencement of Contract Times; Notice to <br /> Paragraphs D.1 , 2 and 3 have been deleted and replaced Proceed <br /> by new paragraphs. See the Supplementary Conditions. <br /> ' D . Furnish, Install, Perform, Provide A. The Contract Times will commence to run on the <br /> thirtieth day after the Effective Date of the Agreement or, if <br /> 1 . '€he—word "€umish, " when used in a Notice to Proceed is given, on the day indicated in the <br /> ' <br /> conneetion • ith senrices, ^ ateri is e i epA Notice to Proceed. A Notice to Proceed may be given at <br /> ` hall. to ply ^ a deliver- ^ id any time within 30 days after the Effective Date of the <br /> materials equipment to the Site ("~ some ethe Agreement. In no event will the Contract Times commence <br /> ' to run later than the sixtieth day after the day of Bid opening <br /> 00700 - 9 <br />