Laserfiche WebLink
or the thirtieth day after the Effective Date of the Paragraph 2 .05.0 has been deleted and replaced with a <br /> Agreement, whichever date is earlier. new paragraph. See the Supplementary Conditions. <br /> E. Firvidenee-ef Insumnee.• Before-any Work at the <br /> 2 . 04 Starting the Work Site is st^.,oa GONTIv n GT-O and nuns:v shall e ^ ^h <br /> deliver . to the other .4th ^ s to ^^ ^h additional insured. <br /> A. CONTRACTOR shall start to perform the Work identified :n the SupplementaFy Conditions, cet4i fie^tes e <br /> 1 on the date when the Contract Times commence to run. No :B e (^^ a „thea_ ekvidenee ^f incur ee whieh either- of <br /> Work shall be done at the Site prior to the date on which the themer- affadditional a nabl ' r-eques14 <br /> Contract Times commence to run. y h enh G.01 hUn n GTnn and GANER r-espeetiNtely ^re <br /> requked te-pevenhase ^a Makl4aift ift ^ seerdanee- A4th <br /> 2 . 05 Before Starting Construction Af#iele 5. <br /> A. CONTRACTOR 's Review of Contract Documents: Paragraph 2.06.A has been deleted and replaced with a <br /> J Before undertaking each part of the Work, new paragraph. See the Supplementary Conditions. <br /> CONTRACTOR shall carefully study and compare the 2 . 06 Preconstruction Conference <br /> Contract Documents and check and verify pertinent figures <br /> therein and all applicable field measurements. A. yetii 20 days after the Gent aet Times ^..t t <br /> 1 CONTRACTOR shall promptly report in writing to nai, h• . be f_e any Work at the Site : started, ^ enf <br /> ENGINEER any conflict, error, ambiguity, or discrepancy , ENGWEER, and others as <br /> which CONTRACTOR may discover and shall obtain a ante vii11.—be held to establish a—werk.ing <br /> J written interpretation or clarification from ENGINEER undeFstanding ^.reng the ..^.+: es as to the weh, <br /> and t,. <br /> before proceeding with any Work affected thereby; diseuss the sehedule . _ f ....ver to in paragraph 2 .05 .B , <br /> however, CONTRACTOR shall not be liable to OWNER pFeeedums for- handling r`"^••n gs and eche= <br /> or ENGINEER for failure to report any conflict, error, submittals, PFeees.dng Appheatiens tier Payment, and. <br /> ambiguity, or discrepancy in the Contract Documents unless <br /> CONTRACTOR knew or reasonably should have known <br /> thereof. 2 . 07 Initial Acceptance of Schedules <br /> B . Preliminary Schedules: Within ten days after the A. Unless otherwise provided in the Contract Docu- <br /> Effective Date of the Agreement (unless otherwise specified ments, at least ten days before submission of the <br /> first <br /> in the General Requirements), CONTRACTOR shall Application for Payment a conference attended by CON- <br /> submit to ENGINEER for its timely review: TRACTOR, ENGINEER, and others as appropriate will be <br /> held to review for acceptability to ENGINEER as provided <br /> 1 . a preliminary progress schedule indicat- below the schedules submitted in accordance with <br /> J ing the times (numbers of days or dates) for starting paragraph 2 .05 .B . CONTRACTOR shall have an <br /> and completing the various stages of the Work, additional ten days to make corrections and adjustments and <br /> including any Milestones specified in the Contract to complete and resubmit the schedules . No progress <br /> Documents; payment shall be made to CONTRACTOR until acceptable <br /> schedules are submitted to ENGINEER. <br /> 2 . a preliminary schedule of Shop Drawing <br /> and Sample submittals which will list each required 1 . The progress schedule will be acceptable <br /> submittal and the times for submitting, reviewing, to ENGINEER if it provides an orderly progression <br /> and processing such submittal; and of the Work to completion within any specified <br /> Milestones and the Contract Times. Such accep- <br /> I 3 . a preliminary schedule of values for all of tance will not impose on ENGINEER responsibility <br /> the Work which includes quantities and prices of for the progress schedule, for sequencing, schedul- <br /> items which when added together equal the Contract ing, or progress of the Work nor interfere with or <br /> Price and subdivides the Work into component parts relieve CONTRACTOR from CONTRACTOR' s <br /> Iin sufficient detail to serve as the basis for progress full responsibility therefor. <br /> J payments during performance of the Work. Such <br /> prices will include an appropriate amount of 2 . CONTRACTOR' s schedule of Shop <br /> _I overhead and profit applicable to each item of Drawing and Sample submittals will be acceptable <br /> Work. to ENGINEER if it provides a workable <br /> arrangement for reviewing and processing the <br /> required submittals. <br /> J <br /> 00700 . 10 <br />