A. CONTRACTOR shall supervise, inspect, and facilities and incidentals necessary for the performance, <br /> direct the Work competently and efficiently, devoting such testing, start-up, and completion of the Work. <br /> attention thereto and applying such skills and expertise as <br /> ' may be necessary to perform the Work in accordance with B . All materials and equipment incorporated into the <br /> the Contract Documents . CONTRACTOR shall be solely Work shall be as specified or, if not specified, shall be of <br /> responsible for the means, methods, techniques, sequences, good quality and new, except as otherwise provided in the <br /> ' and procedures of construction, but CONTRACTOR shall Contract Documents . All warranties and guarantees <br /> not be responsible for the negligence of OWNER or specifically called for by the Specifications shall <br /> expressly <br /> ENGINEER in the design or specification of a specific run to the benefit of OWNER. If required by ENGINEER, <br /> ' means, method, technique, sequence, or procedure of CONTRACTOR shall furnish satisfactory evidence <br /> construction which is shown or indicated in and expressly (including reports of required tests) as to the source, kind, <br /> required by the Contract Documents. CONTRACTOR and quality of materials and equipment. All materials and <br /> shall be responsible to see that the completed Work equipment shall be stored, applied, installed, <br /> connected, <br /> ' complies accurately with the Contract Documents. erected, protected, used, cleaned, and conditioned in <br /> accordance with instructions of the applicable Supplier, <br /> B . At all times during the progress of the Work, except as otherwise may be provided in the Contract Docu- <br /> CONTRACTOR shall assign a competent resident superin- ments. <br /> tendent thereto who shall not be replaced without written <br /> notice to OWNER and ENGINEER except under 6 . 04 Progress Schedule <br /> extraordinary circumstances . The superintendent will be <br /> ' CONTRACTOR' s representative at the Site and shall have A. CONTRACTOR shall adhere to the progress <br /> authority to act on behalf of CONTRACTOR. All schedule established in accordance with paragraph 2 .07 as it <br /> communications given to or received from the superin- may be adjusted from time to time as provided below. <br /> ' tendent shall be binding on CONTRACTOR. <br /> 1 . CONTRACTOR shall submit to ENGI- <br /> 6 . 02 Labor; Working Hours NEER for acceptance (to the extent indicated in <br /> paragraph 2 . 07) proposed adjustments in the prog- <br /> A. CONTRACTOR shall provide competent, suitably ress schedule that will not result in changing the <br /> qualified personnel to survey, lay out, and construct the Contract Times (or Milestones). Such adjustments <br /> Work as required by the Contract Documents . CON- will conform generally to the progress schedule then <br /> ' TRACTOR shall at all times maintain good discipline and in effect and additionally will comply with <br /> any <br /> order at the Site. provisions of the General Requirements applicable <br /> thereto. <br /> B . Except as otherwise required for the safety or <br /> protection of persons or the Work or property at the Site or 2 . Proposed adjustments in the progress <br /> adjacent thereto, and except as otherwise stated in the schedule that will change the Contract <br /> Times (or <br /> Contract Documents, all Work at the Site shall be Milestones) shall be submitted in accordance with <br /> ' performed during regular working hours, and CON- the requirements of Article 12 . Such adjustments <br /> TRACTOR will not permit overtime work or the may only be made by a Change Order or Written <br /> perforinance of Work on Saturday, Sunday, or any legal Amendment in accordance with Article 12 . <br /> ' holiday without OWNER' s written consent (which will not <br /> be unreasonably withheld) given after prior written notice to 6 . 05 Substitutes and "Or-Equals " <br /> ENGINEER. <br /> Paragraph 6.05.A has been deleted and replaced with a <br /> ' New Paragraphs 6.02 .B. 1 , 2, 3 , 4, and 5 have been new paragraph. See the Supplementary Conditions. <br /> added. See the Supplementary Conditions. A. Whenever an item of of or- equipment is <br /> 6 . 03 Services, Materials, and Equipment the name of c Piet ite... „_ thO „ „„.e e f paftietdaF <br /> 1./l Vt,/11V L{41 ' 1LV111 V1�34 <br /> Supplier, the peel fie.,. ien or aeseFi tie is intended to. <br /> A. Unless otherwise specified in the General Re- establish the type, fimetion, appeaFanee, and quah� r <br /> quirements, CONTRACTOR shall provide and assume full <br /> ' responsibility for all services, materials, equipment, labor, is €ellewed bar-wards reading-that no like, equivalent <br /> transportation construction equipment and machine "oregual" item � w .;,. ..ie «tea the <br /> machinery, ., �uv� acrrcrorris�crixssxcca�sxzcz—iccm� <br /> tools, appliances, fuel, power, light, heat, telephone, water, <br /> sanitary facilities, temporary facilities, and all other <br /> 00700 - 20 <br />