Laserfiche WebLink
' Suppliers may submi"ea to IIAT!"_INEED r Fevie 6.05 .A . 2 . d, as supplemented in the General <br /> undeF the 'f'i'"n "e' described below, Requirements and as ENGINEER may decide is <br /> appropriate under the circumstances . <br /> ' 1 . "Or-Equal " Items: If in ENGINEER' s <br /> sole discretion an item of material or equipment pro- d. CONTRACTOR shall first make written <br /> posed by CONTRACTOR is functionally equal to application to ENGINEER for review of a <br /> ' that named and sufficiently similar so that no change proposed substitute item of material or <br /> in related Work will be required, it may be con- equipment that CONTRACTOR seeks to furnish <br /> sidered by ENGINEER as an "or-equal" item, in or use . The application shall certify that the <br /> ' which case review and approval of the proposed proposed substitute item will perform adequately <br /> item may, in ENGINEER' s sole discretion, be the functions and achieve the results called for <br /> accomplished without compliance with some or all by the general design, be similar in substance to <br /> of the requirements for approval of proposed substi- that specified, and be suited to the same use as <br /> ' tute items . For the purposes of this paragraph that specified. The application will state the <br /> 6.05 .A. 1 , a proposed item of material or equipment extent, if any, to which the use of the proposed <br /> will be considered functionally equal to an item so substitute item will prejudice CONTRACTOR' s <br /> named if: achievement of Substantial Completion on time, <br /> whether or not use of the proposed substitute <br /> Sentence 6.05.A. 1 .a.(ii) has been deleted and replaced item in the Work will require a change in any of <br /> with a new sentence. See the Supplementary the Contract Documents (or in the provisions of <br /> ' Conditions. any other direct contract with OWNER for work <br /> a. in the exercise of reasonable judgment on the Project) to adapt the design to <br /> the <br /> ENGINEER determines that: (i) it is at least proposed substitute item and whether or not <br /> equal in quality, durability, appearance, strength, incorporation or use of the proposed substitute <br /> ' and design characteristics; (ii) item in connection with the Work is subject to <br /> per€ermt least equally—well fl' ; tion payment of any license fee or royalty. All <br /> variations of the proposed substitute item from <br /> ' D'i' e"` as " funetiening .. he e and; that specified will be identified in the applica- <br /> tion, and available engineering, sales, <br /> b . CONTRACTOR certifies that: (i) there is maintenance, repair, and replacement services <br /> ' no increase in cost to the OWNER; and (ii) it will be indicated. The application will also <br /> will conform substantially, even with deviations, contain an itemized estimate of all costs or <br /> to the detailed requirements of the item named in credits that will result directly or indirectly from <br /> the Contract Documents. use of such substitute item, including costs of <br /> ' redesign and claims of other contractors affected <br /> 2 . Substitute Items by any resulting change, all of which will be <br /> considered by ENGINEER in evaluating the <br /> ' a. If in ENGINEER' s sole discretion an proposed substitute item. ENGINEER may <br /> item of material or equipment proposed by require CONTRACTOR to furnish additional <br /> CONTRACTOR does not qualify as an data about the proposed substitute item. <br /> ' "or-equal" item under paragraph 6.05 .A. 1 , it will <br /> be considered a proposed substitute item. B . Substitute Construction Methods or Procedures: <br /> If a specific means, method, technique, sequence, or <br /> b. CONTRACTOR shall submit sufficient procedure of construction is shown or indicated in and <br /> information as provided below to allow ENGI- expressly required by the Contract Documents, CON- <br /> NEER to deternune that the item of material or TRACTOR may furnish or utilize a substitute means, meth- <br /> equipment proposed is essentially equivalent to od, technique, sequence, or procedure of construction <br /> ' that named and an acceptable substitute therefor. approved by ENGINEER. CONTRACTOR shall submit <br /> Requests for review of proposed substitute items sufficient information to allow ENGINEER, in <br /> of material or equipment will not be accepted by ENGINEER' s sole discretion, to determine that the <br /> ENGINEER from anyone other than CON- substitute proposed is equivalent to that expressly called for <br /> ' TRACTOR. by the Contract Documents. The procedure for review by <br /> ENGINEER will be similar to that provided in subpara- <br /> c . The procedure for review by ENGI- graph 6.05 .A.2 . <br /> NEER will be as set forth in paragraph <br /> ' 00700 - 21 <br />