My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-103
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-103
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2016 1:48:24 PM
Creation date
9/30/2015 7:30:39 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/04/2004
Control Number
2004-103
Agenda Item Number
11.I.2
Entity Name
Timothy Rose Construction
Subject
Contract and Specifications 4th St. Widening US 1 to West of Old Dixie
Project Number
9205
Bid Number
6028
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3756
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' SECTION 01520 <br /> ' CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS <br /> 1 . 1 SCOPE <br /> ' A . Provide all construction equipment and facilities and temporary p ary controls <br /> required to satisfactorily complete the work represented on the Drawings <br /> ' and described in the Specifications . <br /> ' 1 . 2 RESPONSIBILITY <br /> ' A . All construction facilities and temporary controls remain the property of the <br /> Contractor establishing them and shall be maintained in a safe and useful <br /> condition until removed from the construction site . <br /> ' B . All false work , scaffolding , ladders , hoistways , braces , pumps , roadways , <br /> sheeting , forms , barricades , drains , flumes , and the like , any of which may <br /> be needed in construction of any part of the work and which are not herein <br /> described or specified in detail , must be furnished , maintained and <br /> removed by the CONTRACTOR , who is responsible for the safety and <br /> ' efficiency of such work and for any damage that may result from their <br /> failure or from their improper construction , maintenance or operation . <br /> C . In accepting the Contract , the CONTRACTOR assumes full responsibility <br /> for the sufficiency and safety of all hoists , cranes , temporary structures or <br /> work and for any damage which may result from their failure or their <br /> ' improper construction , maintenance or operation and will indemnify and <br /> save harmless the OWNER and ENGINEER from all claims , suits or <br /> actions and damages or costs of every description arising by reason of <br /> ' failure to comply with the above provision . <br /> 1 . 3 TEMPORARY UTILITIES AND SERVICES <br /> A . TEMPORARY WATER <br /> 1 . Provide a temporary water service as required for all construction <br /> ' purposes and pay for all water used . <br /> 2 . Furnish potable drinking water in suitable dispensers and with cups <br /> for use of all employees at the job . <br /> 3 . Provide all temporary piping , hoses , etc . , required to transport <br /> water to the point of usage by all trades . <br /> 4 . When temporary water service is no longer required , remove all <br /> 1 <br /> 01520- 1 01520 Construction Facilities <br /> ' F :\PublicWorks\Capita1 Projects\Fourth Street-Old Dixie-US1 \CONTRACT DOCUMENTS\01520 Construction Facilities .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.