My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-103
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-103
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2016 1:48:24 PM
Creation date
9/30/2015 7:30:39 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/04/2004
Control Number
2004-103
Agenda Item Number
11.I.2
Entity Name
Timothy Rose Construction
Subject
Contract and Specifications 4th St. Widening US 1 to West of Old Dixie
Project Number
9205
Bid Number
6028
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3756
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
temporary water lines . <br /> p ry <br /> ' B . TEMPORARY SANITARY FACILITIES <br /> 1 . Provide temporary toilet facilities separate from the job office . <br /> Maintain these during the entire period of construction under this <br /> ' Contract for the use of all construction personnel on the job . <br /> Provide enough chemical toilets to conveniently serve the needs of <br /> all personnel . Properly seclude toilet facilities from public <br /> ' observation . <br /> 2 . Chemical toilets and their maintenance shall meet the requirements <br /> of State and local health regulations and ordinances . Immediately <br /> ' correct any facilities or maintenance methods failing to meet these <br /> requirements . Upon completion of work , remove the facilities from <br /> the premises . <br /> ' 1 . 4 SECURITY <br /> ' Full time watchmen will not be specifically required as a part of the Contract , but <br /> the CONTRACTOR shall provide inspection of work area daily and shall take <br /> whatever measures are necessary to protect the safety of the public , workmen , <br /> and materials , and provide for the security of the site , both day and night . <br /> 1 . 5 TEMPORARY CONTROLS <br /> Take all necessary precautions to control dust and mud associated with the work <br /> ' of this Contract . In dry weather, spray dusty areas daily with water in order to <br /> control dust . Take necessary steps to prevent the tracking of mud onto adjacent <br /> streets and highways . <br /> ' 1 . 6 REMOVAL OF TEMPORARY CONSTRUCTION FACILITIES <br /> Remove the various temporary facilities , services , and controls and legally <br /> ' dispose of them as soon as the work is complete . The areas of the site used for <br /> temporary facilities shall be properly reconditioned and restored to a condition <br /> acceptable to the OWNER . <br /> + + END OF SECTION + + <br /> 01520-2 01520 Construction Facilities <br /> F:\Public Works\Capital Projects\Fourth Street-Old Dixie-US I \CONTRACT DOCUMENTS\01520 Construction Facilities .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.