My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-265
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-265
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:13:18 AM
Creation date
9/30/2015 9:53:41 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
07/18/2006
Control Number
2006-265
Agenda Item Number
11.I.1.
Entity Name
Timothy Rose Contracting
Subject
Roadway improvements to SR A1A and CR 510
Project Number
9701
Bid Number
2006079
Supplemental fields
SmeadsoftID
5753
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTRACTOR. Delays attributable to and within the <br /> d m^ fee ghall ,.e payable en the bass. ,.a control of a Subcontractor or Supplier shall be deemed to be <br /> eests e...: .ed ...der _ ... . phs t t ,n , n delays within the control of CONTRACTOR. <br /> n1 .01 .A.5 , and d limn . <br /> 12.05 Delays Beyond OWNER 's and CONTRACTOR 's <br /> a the arneunt of .._edit to be allowed b Control <br /> ynwrlvnr•TOR te CAWrnEo c,._ a _ti __e^ <br /> vzh,' h. results :.. - .-_ a - _- - ___ --. - 111 h _ A. Where CONTRACTOR is prevented from <br /> completing any part of the Work within the Contract Times <br /> a.,d.. .t: ,... if, rnnrrnnnTnn {^^ by—an (or Milestones) due to delay beyond the control of both <br /> equal to five pefeent of such ript OWNER and CONTRACTOR, an extension of the <br /> decrease; an Contract Times (or Milestones) in an amount equal to the <br /> time lost due to such delay shall be CONTRACTOR's sole <br /> and exclusive remedy for such delay. <br /> ; al. ed in an ene change, the ad:. s4me..t i.. <br /> fee shall be computed an the 12.06 Delay Damages <br /> . .a dffough inelu Paragraphs 12.06.A and 12.06 B have been deleted and <br /> sire replaced with a new paragraph. See the Supplementary <br /> Conditions. <br /> 12.02 Change of Contract Times A. IB ne event shall 0.xnaco e_ BNC-4NERR b <br /> liable to C-QP1q4ZAGT0R, <br /> JA. The Contract Times (or Milestones) may only be <br /> changed by a Change Order or by a Written Amendment. empleyee of agent of any of them, feF damages--� <br /> Any Claim for an adjustment in the Contract Times (or of ar resulting fFemi <br /> Milestones) shall be based on written notice submitted by <br /> the party making the claim to the ENGINEER and the other 1 . delays eaused by of within the eent' <br /> party to the Contract in accordance with the provisions of ('^"'"t'R " GTQ ; a <br /> paragraph 10.05 . <br /> 2. delays beyend the eefftFel of both <br /> B . Any adjustment of the Contract Times (or Olm*sn d CONTRACTOR ineludi no oat not <br /> Milestones) covered by a Change Order or of any Claim for <br /> an adjustment in the Contract Times (or Milestones) will be c;epditians, aeas ` C d, eF aets eF - °^Leet by _till <br /> determined in accordance with the provisions of this ..mners orother eefgfastefs peffee�.a at e: _AF4 <br /> Article 12. as sentemplated by As4iele 7 , <br /> 12.03 Delays Beyond CONTRACTOR 's Control n N h -a `- this pu aph 12-06 bus a shah <br /> A. Where CONTRACTOR is prevented from GO n nn d te dela :tae F^_ ^^ OF disFa tiefl- <br /> completing any part of the Work within the Contract Times <br /> - (or Milestones) due to delay beyond the control of anyane fef .. hem QWTs : _ _.._ ....:ue <br /> CONTRACTOR, the Contract Times (or Milestones) will <br /> be extended in an amount equal to the time lost due to such <br /> delay if a Claim is made therefor as provided in paragraph ARTICLE 13 c TESTS AND INSPECTIONS ; <br /> 12.02.A- Delays beyond the control of CONTRACTOR CORRECTION, REMOVAL OR ACCEPTANCE OF <br /> shall include, but not be limited to, acts or neglect by DEFECTIVE WORK <br /> OWNER, acts or neglect of utility owners or other <br /> contractors performing other work as contemplated by <br /> Article 7 , fires, floods, epidemics, abnormal weather 13 .01 Notice of Defects <br /> conditions, or acts of God. <br /> A. Prompt notice of all defective Work of which <br /> 12.04 Delays Within CONTRACTOR 's Control OWNER or ENGINEER has actual knowledge will be <br /> given to CONTRACTOR. All defective Work may be <br /> A. The Contract Times (or Milestones) will not be rejected, corrected, or accepted as provided in this <br /> extended due to delays within the control of Article 13 . <br /> 00700 - 36 <br />