prior to CONTRACTOR's purchase thereof for
<br /> 13 .02 Access to Work incorporation in the Work. Such inspections, tests, or
<br /> approvals shall be performed by organizations acceptable to
<br /> A. OWNER, ENGINEER, ENGINEER' s Con- OWNER and ENGINEER.
<br /> sultants, other representatives and personnel of OWNER,
<br /> independent testing laboratories, and governmental agencies E. If any Work (or the work of others) that is to be
<br /> with jurisdictional interests will have access to the Site and inspected, tested, or approved is covered by CONTRAC-
<br /> the Work at reasonable times for their observation, TOR without written concurrence of ENGINEER, it must,
<br /> inspecting, and testing. CONTRACTOR shall provide if requested by ENGINEER, be uncovered for observation.
<br /> them proper and safe conditions for such access and advise
<br /> them of CONTRACTOR' s Site safety procedures and F. Uncovering Work as provided in paragraph
<br /> programs so that they may comply therewith as applicable. 13.03.E shall be at CONTRACTOR's expense unless CON-
<br /> TRACTOR has given ENGINEER timely notice of
<br /> 13.03 Tests and Inspections CONTRACTOR's intention to cover the same and ENGI-
<br /> NEER has not acted with reasonable promptness in
<br /> A. CONTRACTOR shall give ENGINEER timely response to such notice.
<br /> notice of readiness of the Work for all required inspections,
<br /> tests, or approvals and shall cooperate with inspection and 13.04 Uncovering Work
<br /> testing personnel to facilitate required inspections or tests.
<br /> A. If any Work is covered contrary to the written
<br /> Paragraph 13.03.E has been deleted and replaced with a request of ENGINEER, it must, if requested by ENGI-
<br /> new paragraph. See the Supplementary Conditions. NEER, be uncovered for ENGINEER's observation and
<br /> B QWPS M . ha4l e-..pley and pa fe f the semi .oma ss replaced at CONTRACTOR's expense.
<br /> approvals equiFed by the C^utr^^_ T_'^^_ents Parts of the last two sentences of paragraph 13.04.E
<br /> exsepte have been deleted. -
<br /> _ ^^^` B . If ENGINEER considers it necessary or advisable
<br /> 1 for ^ ^^ tests, ^
<br /> ^•• i that covered Work be observed by ENGINEER or inspect-
<br /> e_ed b ., _ gFaf3hs i a na r and 1 a na D belew; ed or tested by others, CONTRACTOR, at ENGINEER's
<br /> request, shall uncover, expose, or otherwise make available
<br /> 2. t-hat oests insuffed inwith for observation, inspection, or testing as ENGINEER may
<br /> tests or inspeGtiens ean"eted pursuant to paiagFap require, that portion of the Work in question, furnishing all
<br /> 13 .04 .13 shall be paid as ffevided in said paragFap necessary labor, material, and equipment. If it is found that
<br /> 13 .04 .B ; and such Work is defective, CONTRACTOR shall pay all
<br /> Claims, costs, losses, and damages (including but not
<br /> 3 athe_.. : , ^^ir^a"• pFevided i- " ^ limited to all fees and charges of engineers, architects,
<br /> attorneys, and other professionals and all court or arbitration
<br /> or other dispute resolution costs) arising out of or relating to
<br /> such uncovering, exposure, observation, inspection, and
<br /> Paragraph 13.03.0 has been deleted in its entirety. testing, and of satisfactory replacement or reconstruction
<br /> Q rr raw ^_ Regulmiens of any publi^ r.^.,. (including but not limited to all costs of repair or
<br /> Fisdietien feElui-^ an), `*'^r4 (of ^^^ thefeef) spe-f?ea4l.y replacement of work of others); and OWNER shall be
<br /> te be :nspe,..^a tested ^_ apffOved 4y an mol eyee ^_ ^.r.o_ entitled to an appropriate decrease in the Contract Price. If
<br /> the parties are unable to agree as to the amount thereof,
<br /> OWNER may make a Claim therefor as . provided in
<br /> paragraph 10.05 . If, however, such Work is not found to be
<br /> defective, CONTRACTOR shall be. allowed __ =iia
<br /> Jef inspection of appFeNtah "lC^-Ile an extension of the Contract Times (or
<br /> Milestones) , er bot` , directly attributable to such
<br /> D. CONTRACTOR shall be responsible for uncovering, exposure, observation, inspection, testing,
<br /> arranging and obtaining and shall pay all costs in connection replacement, and reconstruction. If the parties are unable to
<br /> with any inspections, tests, or approvals required for agree as to the amount e extent thereof, CONTRACTOR
<br /> OWNER' s and ENGINEER' s acceptance of materials or may make a Claim therefor as provided in paragraph 10.05 .
<br /> l equipment to be incorporated in the Work; or acceptance of
<br /> Jmaterials, mix designs, or equipment submitted for approval
<br /> J
<br /> 00700 - 37