Laserfiche WebLink
"suitable," "acceptable," "proper," "satisfactory," or <br /> adjectives of like effect or import are used to describe 3 Th a „r ° Of <br /> an action or determination of ENGINEER as to the h gpoiiPeg , '"" "' "l <br /> Work, it is intended that such action or determination equip ent, Shall FoeaH W fi'"""ti and uiqtgll . a <br /> will be solely to evaluate, in general, the completedt . fllei e . " 1 .e.,,aj, <br /> Work for compliance with the requirements of and � ==�tmae''ge <br /> information in the Contract Documents and confor- <br /> mance with the design concept of the completed Project Paragraph DA has been deleted in its entirety. <br /> ..,._F.. <br /> as a functioning whole as shown or indicated in the ,y "fiim .. "install,"o r e pfe <br /> ef :..� <br /> Contract Documents (unless there is a specific statement .1 with <br /> indicating otherwise). The use of any such term or inateria4s, OF equip ient in a senteya ele 1 <br /> adjective shall not be effective to assign to ENGINEER <br /> any duty or authority to supervise or direct the implied. <br /> performance of the Work or any duty or authority to <br /> undertake responsibility contrary to the provisions of E. Unless stated otherwise in the Contract Docu- <br /> paragraph 9. 10 or any other provision of the Contract ments, words or phrases which have a well-known technical <br /> Documents. or construction industry or trade meaning are used in the <br /> Contract Documents in accordance with such recognized <br /> B . Day meaning. <br /> 1 . The word "day" shall constitute a <br /> calendar day of 24 hours measured from midnight to ARTICLE 2 - PRELIMINARY MATTERS <br /> the next midnight. <br /> JC. Defective 2.01 Delivery of Bonds <br /> l 1 . The word "defective," when modifying A. When CONTRACTOR delivers the executed <br /> J the word "Work," refers to Work that is Agreements to OWNER, CONTRACTOR shall also deliver <br /> unsatisfactory, faulty, or deficient in that it does not to OWNER such Bonds as CONTRACTOR may be <br /> conform to the Contract Documents or does not required to famish. <br /> meet the requirements of any inspection, reference <br /> standard, test, or approval referred to in the Contract 2.02 Copies of Documents <br /> Documents, or has been damaged prior to <br /> ENGINEER' s recommendation of final payment A. OWNER shall furnish to CONTRACTOR up to <br /> (unless responsibility for the protection thereof has ten copies of the Contract Documents. Additional copies <br /> been assumed by OWNER at Substantial will be furnished upon request at the cost of reproduction. <br /> Completion in accordance with paragraph 14.04 or <br /> 14.05). 2.03 Commencement of Contract Times;. Notice to <br /> Proceed <br /> Paragraphs D.1, 2 and 3 have been deleted and replaced <br /> J by new paragraphs. See the Supplementary Conditions. A. The Contract Times will commence to run on the <br /> D. Furnish, Install, Perform, Provide thirtieth day after the Effective Date of the Agreement or, if <br /> a Notice to Proceed is given, on the day indicated in the <br /> J I The tend wlign Used in Notice to Proceed. A Notice to Proceed may be given at <br /> _,_ 9F equipmem, any time within 30 days after the Effective Date of the <br /> shall eaean _ly and deliver sa Agreement. In no event will the Contract Times commence <br /> inaterials „ the Site ( some me atho_ to run later than the sixtieth day after the day of Bid opening <br /> speeifi ,: ' 1 equipment <br /> ready foF use of installation or the thirtieth day after the Effective Date of the <br /> in usable eFepefabl& e�. Agreement, whichever date is earlier. <br /> h wera "install," h used in sennep 2.04 Starting the Work <br /> . l 1shall <br /> plae , in final o psition said A. CONTRACTOR shall start to perform the Work <br /> r <br /> �,� t mplete an on the date when the Contract Times commence to run. No <br /> Jread), for intended use <br /> 00700 - 9 <br />