Laserfiche WebLink
Work shall be done at the Site prior to the date on which the I.A.1hieli nn 9R A r nn A OWNER e . c4ye are <br /> Contract Times commence to run. Fequ4ed te r "ehase and i ,. <br /> ain i — .dn flee ...:,ti <br /> AffiCle-5- . <br /> 2.05 Before Starting Construction <br /> Paragraph 2.06.A has been deleted and replaced <br /> A. CONTRACTOR 's Review of Contract Documents: with a new paragraph. See the Supplementary <br /> Before undertaking each part of the Work, Conditions. <br /> CONTRACTOR shall carefully study and compare the 2.06 Preconstruction Conference <br /> Contract Documents and check and verify pertinent figures <br /> J therein and all applicable field measurements. A Within20 days after the GopAfaet _T:._ es start t . <br /> J CONTRACTOR shall promptly report in writing to FRHbut before any 3ALPrk a4 the Site is staFted, a eenfeFene <br /> ENGINEER any conflict, error, ambiguity, or discrepancy a4eaded by rnnrrB AGTnn ENOPMER, and others a <br /> which CONTRACTOR may discover and shall obtain a <br /> written interpretation or clarification from ENGINEER understandingameng <br /> the panies as to the Wark and te <br /> before proceeding with any Work affected thereby; digeusq thesehedules ree a to in pafagraph 2.05 .B <br /> however, CONTRACTOR shall not be liable to OWNER <br /> JI or ENGINEER for failure to report any conflict, error, stibmittals, pFocessing Applications `"` liaytnent, and <br /> ambiguity, or discrepancy in the Contract Documents unless <br /> CONTRACTOR knew or reasonably should have known <br /> thereof. 2.07 Initial Acceptance of Schedules <br /> B . Preliminary Schedules: Within ten days after the A. Unless otherwise provided in the Contract Docu- <br /> Effective Date of the Agreement (unless otherwise specified mens, at least ten days before submission of the first <br /> in the General Requirements), CONTRACTOR shall Application for Payment a conference attended by CON- <br /> submit to ENGINEER for its timely review: TRACTOR, ENGINEER, and others as appropriate will be <br /> held to review for acceptability to ENGINEER as provided <br /> 1 . a preliminary progress schedule indicat- below the schedules submitted in accordance with <br /> ing the times (numbers of days or dates) for starting paragraph 2.05 .B . CONTRACTOR shall have an <br /> and completing the various stages of the Work, additional ten days to make corrections and adjustments and <br /> including any Milestones specified in the Contract to complete and resubmit the schedules. No progress <br /> Documents; payment shall be made to CONTRACTOR until acceptable <br /> schedules are submitted to ENGINEER. <br /> 2. a preliminary schedule of Shop Drawing <br /> 1 and Sample submittals which will list each required 1 . The progress schedule will be acceptable <br /> J submittal and the times for submitting, reviewing, to ENGINEER if it provides an orderly progression <br /> and processing such submittal; and of the Work to completion within any specified <br /> Milestones and the Contract Times. Such accep- <br /> 3 . a preliminary schedule of values for all of tance will not impose on ENGINEER responsibility <br /> the Work which includes quantities and prices of for the progress schedule, for sequencing, schedul- <br /> items which when added together equal the Contract ing, orprogressof the Work nor interfere with or <br /> J Price and subdivides the Work into component parts relieve CONTRACTOR from CONTRACTOR' s <br /> in sufficient detail to serve as the basis for progress full responsibility therefor. <br /> payments during performance of the Work. Such <br /> prices will include an appropriate amount of 2. .. CONTRACTOR' s schedule of Shop <br /> overhead and profit applicable to each item of Drawing and Sample submittals will be acceptable <br /> Work. to ENGINEER if it provides a workable <br /> arrangement for reviewing and processing the <br /> Paragraph 2.05.0 has been deleted and replaced with a required submittals. <br /> new paragraph. See the Supplementary Conditions. <br /> Evidence ! / -sumneer Bef.._= an WeAE at the 3 . CONTRACTOR's schedule of values <br /> Sge is stAged, CONTRACTOR a 047ATER . hAll eReh will be acceptable to ENGINEER as to form and <br /> r ti ti eepies to <br /> each aaa.,. gnal 43s -ed substance if it provides a reasonable allocation of the <br /> identified in the c 1 .. GE)JiditiORS, 44fiS.aoS Gf Contract Price to component parts of the Work. <br /> them of a--, add"' ena! insufed may Feasenably-+equest) <br /> 00700 - 10 <br />