My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-265
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-265
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:13:18 AM
Creation date
9/30/2015 9:53:41 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
07/18/2006
Control Number
2006-265
Agenda Item Number
11.I.1.
Entity Name
Timothy Rose Contracting
Subject
Roadway improvements to SR A1A and CR 510
Project Number
9701
Bid Number
2006079
Supplemental fields
SmeadsoftID
5753
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work shall be done at the Site prior to the date on which the I.A.1hieli nn 9R A r nn A OWNER e . c4ye are <br /> Contract Times commence to run. Fequ4ed te r "ehase and i ,. <br /> ain i — .dn flee ...:,ti <br /> AffiCle-5- . <br /> 2.05 Before Starting Construction <br /> Paragraph 2.06.A has been deleted and replaced <br /> A. CONTRACTOR 's Review of Contract Documents: with a new paragraph. See the Supplementary <br /> Before undertaking each part of the Work, Conditions. <br /> CONTRACTOR shall carefully study and compare the 2.06 Preconstruction Conference <br /> Contract Documents and check and verify pertinent figures <br /> J therein and all applicable field measurements. A Within20 days after the GopAfaet _T:._ es start t . <br /> J CONTRACTOR shall promptly report in writing to FRHbut before any 3ALPrk a4 the Site is staFted, a eenfeFene <br /> ENGINEER any conflict, error, ambiguity, or discrepancy a4eaded by rnnrrB AGTnn ENOPMER, and others a <br /> which CONTRACTOR may discover and shall obtain a <br /> written interpretation or clarification from ENGINEER understandingameng <br /> the panies as to the Wark and te <br /> before proceeding with any Work affected thereby; digeusq thesehedules ree a to in pafagraph 2.05 .B <br /> however, CONTRACTOR shall not be liable to OWNER <br /> JI or ENGINEER for failure to report any conflict, error, stibmittals, pFocessing Applications `"` liaytnent, and <br /> ambiguity, or discrepancy in the Contract Documents unless <br /> CONTRACTOR knew or reasonably should have known <br /> thereof. 2.07 Initial Acceptance of Schedules <br /> B . Preliminary Schedules: Within ten days after the A. Unless otherwise provided in the Contract Docu- <br /> Effective Date of the Agreement (unless otherwise specified mens, at least ten days before submission of the first <br /> in the General Requirements), CONTRACTOR shall Application for Payment a conference attended by CON- <br /> submit to ENGINEER for its timely review: TRACTOR, ENGINEER, and others as appropriate will be <br /> held to review for acceptability to ENGINEER as provided <br /> 1 . a preliminary progress schedule indicat- below the schedules submitted in accordance with <br /> ing the times (numbers of days or dates) for starting paragraph 2.05 .B . CONTRACTOR shall have an <br /> and completing the various stages of the Work, additional ten days to make corrections and adjustments and <br /> including any Milestones specified in the Contract to complete and resubmit the schedules. No progress <br /> Documents; payment shall be made to CONTRACTOR until acceptable <br /> schedules are submitted to ENGINEER. <br /> 2. a preliminary schedule of Shop Drawing <br /> 1 and Sample submittals which will list each required 1 . The progress schedule will be acceptable <br /> J submittal and the times for submitting, reviewing, to ENGINEER if it provides an orderly progression <br /> and processing such submittal; and of the Work to completion within any specified <br /> Milestones and the Contract Times. Such accep- <br /> 3 . a preliminary schedule of values for all of tance will not impose on ENGINEER responsibility <br /> the Work which includes quantities and prices of for the progress schedule, for sequencing, schedul- <br /> items which when added together equal the Contract ing, orprogressof the Work nor interfere with or <br /> J Price and subdivides the Work into component parts relieve CONTRACTOR from CONTRACTOR' s <br /> in sufficient detail to serve as the basis for progress full responsibility therefor. <br /> payments during performance of the Work. Such <br /> prices will include an appropriate amount of 2. .. CONTRACTOR' s schedule of Shop <br /> overhead and profit applicable to each item of Drawing and Sample submittals will be acceptable <br /> Work. to ENGINEER if it provides a workable <br /> arrangement for reviewing and processing the <br /> Paragraph 2.05.0 has been deleted and replaced with a required submittals. <br /> new paragraph. See the Supplementary Conditions. <br /> Evidence ! / -sumneer Bef.._= an WeAE at the 3 . CONTRACTOR's schedule of values <br /> Sge is stAged, CONTRACTOR a 047ATER . hAll eReh will be acceptable to ENGINEER as to form and <br /> r ti ti eepies to <br /> each aaa.,. gnal 43s -ed substance if it provides a reasonable allocation of the <br /> identified in the c 1 .. GE)JiditiORS, 44fiS.aoS Gf Contract Price to component parts of the Work. <br /> them of a--, add"' ena! insufed may Feasenably-+equest) <br /> 00700 - 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.