Laserfiche WebLink
storage at the project site prior to installation . <br /> 1 . 5 PROJECT PHOTOGRAPHS/VIDEOS <br /> A . The CONTRACTOR shall make provisions , at his expense , for photographs or <br /> video tapes of all work areas just prior to construction , and for unusual conditions <br /> during construction . The photographs or videos shall show pertinent physical <br /> features along the line of construction . The purpose of the photographs or videos <br /> is to determine any damage to private or public property during construction . <br /> B . Pre-Construction Video : <br /> 1 . Contractor shall provide the Owner with a photograph or video record and one <br /> copy of the existing conditions prior to construction . This photograph or video <br /> shall be a standard DVD format , and shall be narrated . <br /> 2 . The photograph or video shall include , but not be limited to , the following items <br /> shown in a clear manner: <br /> 1 ) All existing features within the right-of-way . <br /> 2 ) All existing features within the temporary construction easement. <br /> 3 ) All existing features within permanent easements . <br /> 4 ) All existing features adjacent to any construction . <br /> 3 . Detail of the photograph or video shall be such that the following examples <br /> shall be clear and visible : <br /> 1 ) Cracks in walls . <br /> 2 ) Condition of fencing . <br /> 3 ) Condition of planted areas and types of vegetation . <br /> 4 ) Condition of sodded areas . <br /> 5 ) Conditions of sprinkler systems and associated controls and wiring . <br /> 6 ) Condition of signs . <br /> 7 ) Conditions of lighting and associated wiring . <br /> 8 ) Significant detail of any pre-existing damages physical features shall be <br /> shown . The coverage of the photograph or video should include the <br /> limits of effects of the use of vibratory rollers . <br /> 9 ) This photograph or video record shall be presented to the Owner within <br /> 30 days of the Notice to Proceed . A copy shall be kept in the <br /> Contractor' s field office . <br /> 10 ) Payment — No additional payment will be made for this work . <br /> + + END OF SECTION + + <br /> 01215-2 01215 General Quality Control <br /> F:\Engineering\Capital Projects\0216- 12th Street Between 16th Avenue and 11th Place\0216 Bid Documents\01 Quality d al <br />