My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-353B
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-353B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2016 10:58:11 AM
Creation date
10/1/2015 12:48:24 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/04/2008
Control Number
2008-353B
Agenda Item Number
8.U.
Entity Name
Timothy Rose Contracting
Subject
12th St. Sidewalk
Area
16th Avenue to 11th Place
Project Number
0216
Bid Number
2008081
Supplemental fields
SmeadsoftID
7691
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01215 <br /> GENERAL QUALITY CONTROL <br /> 1 . 1 DESCRIPTION OF REQUIREMENTS <br /> A . Definitions : Specific quality control requirements for the work are indicated <br /> throughout the Contract Documents . The requirements of this section are <br /> primarily related to the performance of the work beyond the furnishing of <br /> manufactured products . The term "Quality Control' includes , but is not <br /> necessarily limited to , inspection and testing and associated requirements . <br /> This section does not specify or modify the OWNER and ENGINEER duties <br /> relating to quality review and Contract surveillance . <br /> 1 . 2 RESPONSIBILITY FOR INSPECTIONS AND TESTS <br /> A . Residual OWNER Responsibility : The OWNER will employ and pay for the <br /> services of independent testing laboratories to perform those required <br /> inspections and tests . <br /> Be CONTRACTORS General Responsibility: No failure of test agencies , whether <br /> engaged by the OWNER or CONTRACTOR , to perform adequate inspections <br /> of tests or to properly analyze or report results , shall relieve the <br /> CONTRACTOR of responsibility for the fulfillment of the requirements of the <br /> Contract Documents . It is recognized that the required inspection and testing <br /> program is intended to assist the CONTRACTOR , OWNER , ENGINEER , and <br /> governing authorities in the nominal determination of probable compliance with <br /> requirements for certain crucial elements of work . The program is not intended <br /> to limit the CONTRACTOR in his regular quality control program , as needed <br /> for general assurance of compliance . <br /> 1 . 3 QUALITY ASSURANCE <br /> A . General Workmanship Standards : It is a requirement that each category of <br /> tradesman or installer performing the work be pre-qualified , to the extent of being <br /> familiar with the applicable and recognized quality standards for his category of <br /> work , and being capable of workmanship complying with those standards . <br /> 1A PRODUCT DELIVERY-STORAGE- HANDLING <br /> Handle , store and protect materials and products , including fabricated components , by <br /> methods and means which will prevent damage , deterioration and losses (and resulting <br /> delays ) , thereby ensuring highest quality results as the performance of the work <br /> progresses . Control delivery schedules so as to minimize unnecessary long -term <br /> 01215- 1 01215 General Quality Control <br /> F:\Engineering\Capital Projects\0216- 12th Street Between 16th Avenue and 11th Place\0216 Bid Documents\01 15Ge era <br />
The URL can be used to link to this page
Your browser does not support the video tag.